HomeMy WebLinkAboutPermit Building 1992-06-23COMM ERCIAL/I N DUSTRIAL
PERMIT APPLICATION
225 Frtff Street, Springfield, Oregon 97477
LOCATION OF PROPOSED WORK:
ASSESSORS MAP
SPFlINGFIELD
JOB NUMBER Z Z
INSPECTION LINE: 726-3769
OFFICE: 726-3759
TAX LOT:
fl"
PHONE:
rPE\.STATE:-77 w M zrp, ? 7y'77CITY:
ADDRESS:
OWNER:
NEW- REMoDEL f ADDrroN DEMoLtsH orHER VALUE:
DESCRIPTION OF WORK:
MECHANICAL:
NAME ADDRESS PHONE
ADDRESS EXPI RES PHONECONTRACTOR'S NAME
ARCHITECT:
ELECTRICAL:
CONST.
CONTRACTOR #
GENERAL:
PLUM BI NG
PLUMBING
NO.FEE CHARGE
Single Fixture
Relocated Bldg
(new fix. addtl)
Water Service
ft
Sanitary Sewer
ft
Storm Sewer
ft
Backflow Device
TOTAL PERMIT
MECHANICAL
NO FFF CHA RGF
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cool er
Vent Fan/Single
duct
Vent
from
System apart
AC or htg.
Mechanical exhaust
hood and duct
Perm it lssuance $10.00
TOTAL PERMIT
_ OFFICE USE _
ZONING
LAND USE
HANDICAP ACCESS:
FLOOD PLAIN
LIGHTING POWER BUDGET:
WATER HEATER:
* OF UNITS:
OCCY GROUP:
* OF STORIES:
QUAD AREA:
# OF BLDGS
CONSTR. TYPE:
HEAT SOURCE:
SQ. FT.$/SQ. FT,VALUE
d|4TOTAL VALUE OF PROJ
X
X
X
SQ. FTG MAIN
SO. FTG ACCESS
SQ. FTG OTHER
'LAN
cHEcK ,u cr?-ffiib
^"r-,,
DATE BY
BUILDING PERMIT y'y',f,o PLUMBING DEMOLITION
5% State
Su rcharoe ,73 5% State
Su rcharge
MECHANICAL FENCE
VALUE $
5% State
Su rcharqe
SIDEWALK
FT.
SUBTOTAL
PE RM ITS
PAVING CU RBCUT
FT.
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
?sy' -6y'2* (-n
V REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:0O a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
stTE |NSPECTION: To be x ROUGH PLUMBTNG, PAVING: After gravel is in
madeafterexcaVation,bUt@aplacebutpriortoplacing
prior to setup of forms. MEOHANICAL: No work is to asphalt or concrete.
be covered until these
UNDERSLAB pLUMBING, inspections have been made SPECIAL INSPECTIONS: ln accordance
ELECTRICAL & and approved. Section 306 0f the state specialty code
MECHANICAL: To be made a special inspector shall be employed
before any work is covered. ATTIC DRAFT STOPS & ny ihe Owner/ Contractor duri ng
CURTAIN WALLS construction of the following work. A
FOOTINGS & FOUN DATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
UNDERGROUND: PIumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or f illing
trenches.
UNDERFLOOR: PIumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
f loor sheathing.
POST & BEAM: To be made
prior to installation of floor
insulation, decking or f loor
sheathi ng.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
X* MASoNRY: Steet tocation,
bond beams grouting or
verticals in accordance with
UBC 2415,
RooF sHEATHTNG AND iHRS^H'",tJ'T'of""X,."
NAILING: Prior to installing erected but prior to placing
any roof covering. concrete.
X
copy of the special testing reports shall
FIREPLACE: Prior to placing be f urnished to the Building Division.
facing materials and before
framing inspection. STRUCTURAL CONCRETE: ln
FRAMING: To be made after excess of 2500 P's l' (306 a'1)
the roof, all f raming, fire
blocking and braciig are in STRUCTURAL WELDS:
place aid all pipes, ihimneys Performed on the iob. {2722 tl
and vents are complete and
the rough electrical, plumbing HIGH STRENGTH BOLTING:
and mechanical are approved. During all bolt installation and
/ tightening operations. (306
INSULATIoN & VAPOR lWHr( ) a.6)
BARRIER: To be made alter all '
insulation and required vapor SpRAyED ONbarriers are in place but FIREpROOFING: U.BC.
before any lath or gypsum Standards 43-8.
board interior wall covering is
x
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
f inished.
SPECIAL GRADING,
EXCAVATION AN D FI LLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU.LAM BEAMS: lnspection
Certif icate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B-C.
STDS. 25-10,11).
STRUCTURAL MASONRY: (306
a.7)
"ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCywill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper ti
street, that the permit card is located at the front of the property, and the a
Sig natu re v
Date 3
me, that project address is readable from the
pproved set of plans will remain on the site at alltimes during construction
6 -23^?
C(VALIDATION --€F-AMOUNT RECEIVED:
RECEIPT *:RECEIVED BY:
DATE PAID:
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot stri ping, etc. must be completed before
requesting this inspection.
)<.FINAL BUILDING: Requested after the final plumbing, etectrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
ADDITIONAL COMMENTS
PLANS REVIEWED BY DATE
,"
COM M ERCIAL/ I N DUSTRIAL
PERMIT APPLICATION
225 Fitlh Street, Springfield, Oregon 97477
LOCATION OF PROPOSED WORK:
ASSESSORS MAP
SPRINGFIELD JoB NUTMBE ^ 7z/ 5z,z
h,INSPECTION LINE: 726-3769
OFFICE: 726-3759
TAX LOT:€a-)
PHONE:
STATE:ztP ""17 7CITY:
ADDRESS:
OWNER
NEW
-
REMoDEL t'aoDlroN DEMoLTsH orHER 12oc> *VALUE
DESCRIPTION OF WORK:
NAME ADDRESS PHONE
ADDRESS EXPI RES PHONECONTRACTOR'S NAME
ARCHITECT;
MECHANICAL:
ELECTRICAL:
CONST.
CONTRACTOR #
G EN E RAL:
PLUMBING
PLU M BI NG
NO.FEE CHA RG E
Single Fixture
Relocated Bld
(new fix. addtl s
)
Water Service
1t
Sanitary Sewer
ft.
Storm Sewer
ft.
Backf low Device
TOTAL PERMIT
M EC HAN ICAL
NN FEE CHA RGF
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent
f rom
System apart
AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
_ OFFICE USE -
LAND USE:
ZONING* OF UNITS:
HANDICAP ACCESS
FLOOD PLAIN
WATER HEATEB:
OCCY GROUP:
Y OF STORIES:
QUAD AREA:
* OF BLDGS:
CONSTR. TYPEr
HEAT SOURCE:
SQ. FT.$i SQ. FT.VALUE
ooTOTAL VALUE OF PROJ
X
x
X
SQ. FTG MAIN
SQ. FTG ACCESS
SO. FTG OTHER
RCPT#PLAN CHECK FEE DATE 8Y
BUILDING PERMIT 20,so PLUMBI NG DEMOLITION
5% State
Su rcharqe /,o3 5% State
Surcharoe
MECHANICAL FENCE
VALUE $
5% State
Surcharqe
SIDEWALK
FT.
SUBTOTAL
PERMITS
PAVING CURBCUT
FT,
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
a(.
LIGHTING POWER BUDGET:
V REQUIRED INSPECTIONS '
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in
made after excavation, but ELECTRICAL & place but prior to placing
prior to setup of forms. MECHANICAL: No work is to asphalt or concrete.
be covered until these
UNDERSLAB pLUMBING, inspections have been made SpEC1AL INSpECTIONS: ln accordance
ELECTRICAL & and approved. Section 306 of the State Specialty Code
MECHANICAL: To be made a special inspector shall be employed
before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor duringCURTAIN WALLS construction of the following work. A
FOOTTNGS & FOUNDATTONS: copy of the special testing reports shall
To be made after trenches are FIREPLACE: Prior to placing be furnished io the Building Division.
excavated and forms are facing materials and before
erected, ail steel in place, but framing inspection' srRUcruRAL CoNCRETE: ln
prior to placing concrete. FRAMING: To be made after excess of 2500 P.S.l. (306 a.1)
3:I""*=*',=,i!f5;l"ol!q "n il::y:ffij[H:f.,n::l:," X - B}E:,"ffi4":,!u=',T',,,,, uservice equipment, conduit, and vents are complete and l/= AN Ypiping, accessories and other
anciuiry equipment items are *: H::l.",ligi:fl'iJ;[}::: 3l?,:f],?E]nol[,ti,.T}t"oin place but before any tighte-ning operations. (306concrete is placed. |NSULATIoN & vApoR a.6)
BARRIER: To be made after all
UNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are in place but FIREPROOFING: U.BC.storm Sewer, water and before any lath or gypsum Standards 43_8.drainage lines. To be made board interior wall covering is
l;::;:":"*rins or fillins applied. spEctAL GRAD'NG,
,NDERFL..R: p,umbins I:::,S""'"1 X*'Jfl[Hl"' iflUTliI-tii.',5Jb'j],"i'
electrical, mechanical. To be according to plans. chapter 29)
made prior to installation of
floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection
f loor sheathing. BOARD: To be made after all Certificate by an approved
lathing and gypsum board, agency, furnished to the City's
POST & BEAM: To be made interior and exterior, is in Building Division before
prior to installation of floor place but before any beams are placed' (2501 U'B'c'
insulation, decking or floor plastering is applied or before STDS' 25-10'11)'
sheathing. - Sypsum board joints and
fasteners are taped and STRUCTURAL MASONRY: (306
FLooR INSULATToN & finished' a'7)
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
X, MASoNRY: Steet tocation,' bond beams grouting or
verticals in accordance with
uBc 2415.
RooF sHEATHTNG AND iHRS^H?rti'"r:,of"":'"
NAILING: Prior to installing erected but prior to placing
any roof covering. concrete.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
"ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARDT Must be requested 2 days in advanceof the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this inspection.X FINAL BUILDING: Bequested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until aCertificate of Occupancy has been issued by the Building Divisionand posted on the premises.
ADDITIONAL COMMENTS:
o o
PLANS REVIEWED BY DATE
t, ll
By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCy
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with ORS 701.055 will be used on this project.
ired inspections are requested at the proper time, that project address is readable from theat the front of the property, and the approved set of plans will remain on the site at all
i gnatu 2
street, that the perm card i
I further agree to ensure that all
times during c.
VALIDATION:OcAMOUNT RECEIVED:
RECEIPT g:
-L-7L
RECEIVED BY:
DATE PAID: