Loading...
HomeMy WebLinkAboutPermit Building 1996-07-26COM M ERCIAL/IN DUSTRIAL PERMIT APPLICATTON 225 Fitlh Street, Springfield, Oregon g7471 LOCATION OF PRO ASSESSORS MAP: SPF!NGFIELE, B JOB NUMBER INSPECTION LtNE: 726-3769 OFFICE: 726-3759 TAX LOT: I I nOWNER: CITY: ADD STATE ZIP: PHON E: ADDITION DEMOLISH DESCRIPTION OF WO NEW_-- REMODEL OTHEFI VALUE: NAME ADDRESS PHONE ADD RESS EXPIRES PHONE G EN ERAL: CONTRACTOR'S NAME ARCHITECT: PLUMBING: MECHANICAL: ELECTRICAL: CONST. CONTRACTOR # NO.FEE CHARGE Single Fixture Relocated Bldg. (new f ix. addtl) Water Service ft Sanitary Sewer ft Storm Sewer ft. Backflow Device TOTAL PERMIT NO trFF CHA RGFFurnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended watl oilloor mounted unit heater ApplianCe Vent se parat e cool ronary evap. er Vent Fan/Single d uct Vent System apart from AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - OFFICE USE - ZONING LAND USE HANDICAP ACCESS: FLOOD PLAIN LIGHTING POWER BUDGEI WATER HEATER C OF UNITS: OCCY GROUP; * OF STORIES: QUAD ABEA: * OF BLDGS: CONSTR. TYPE: HEAT SOURCE: SQ. FT.$/SQ. FT.VALUE TOTAL VALUE OF PROJ X X X SQ. FTG MAIN SO, FTG ACCESS SQ. FTG OTHER PLAN CHECK FEE RC PT#BYDATE BUILDING PERMIT HW PLU M BI NG DEMOLITION 5% State Su rcharge -#+5% State Su rcharge MECHANICAL FENCE VALUE $ 5% State Su rcharo e SIDEWALK FT, SUBTOTAL PE RM ITS PAVING CURBCUT FT, SYSTEMS DEVELOPMENT /6-a)TOTAL PERMIT FEES EXCLUDING ELECTHICAL REOUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726.3769 (recorder), state your city designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:0o a.m. will be made the same working day, requests made after 7:0o a.m. will be made the following work daY. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: AftET gTAVCI iS iN made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete be covered until these uNDERSLAB pLUMB;NG, inspections have been made SpEctAL lNsPEcTloNS: ln accordance ELECTRICAL & and approved. Section 306 of the State Specialty Code MECHANICAL: To be made a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor during CURTAIN WALLS construction of the following work. A FOOTINGS & FOUNDATIONS: trrDtrDr Antr. r copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division. excavated and forms are facing materials and before erected, all steel in place, but framing inspection' STRUCTURAL CONCRETE: ln prior to placlng concrete. FRAMING: To be made after excess of 2500 P'Sl (306 a'1) coNcRErE sLAB: ro be f[#:L iilJ'3[Xl3i,t[,? ," srRUcruRAL wELDS: made after all inslab building place and att pipes, chimneys Performed on the iob' (2722 t\ service equipment, conduit, and vents are complete and piping, accessories and other the rough electrical, plumbtng HIGH STRENGTH BOLTING: ancillary equipment items are and me6hanical are approved. During all bolt installation and in place but before any tightening operations. (306 concrete is placed. TNSULATION & VApOR a.6) BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SPRAYED ON electrical, gas, sanitary sewer, barriers are ln place but FIREPROOFING: U.B.C. storm sewer, water and before any lath or gypsum Standards 43-8. dralnage lines. To be made board interior wall covering is prior to covering or filling applied. SpECIAL GRADING, t re nc hes. ,NDERFL..R: p,umbins [:::,S';?ff;!3]"H}"' il:fruiilJlP'5Jb'j]'"i' electrical, mechanical. To be according to plans' Chapter 29) made Prior to installation of floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection f loor sheathing. BOARD: To be made after all Certificate by an approved lathingandgypsumboard,agency'furnishedtotheCity's posr & BEAM: To be made interior and exierior, is in Building Division before prior to installation of floor flace but be{ore any beams are placed' (2501 U'BC' insuta.on, decking or ftoor plastering is ippfleO or before STDS' 25'1011)' sheathlng. Jvvrrrr'v gypsum board loints and iisteners are tiped and STRUCTURAL MASONRY: (306 FLooR TNSULATToN & finished' a'7\ SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating comPlete and form VAPOR BARRIERS: To be made Prior to installation of 7 decking or floor sheathing. V MASoNRY: steel location, ROOF SHEATHING AND NAILING: Prior to installing any roof covering. APRONS: After forms are erected but prior to placing concrete. *ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. bond beams grouting or work and sub-base material in verticals in accordance with place. uBc 2415. CURB AND APPROACH By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all lnformation herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springf ield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Buildlng Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all DateSi gnat -t times during construction DATE PAID RECEIVED D:AMOUNT RECEIV RECEIPT *: FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot stri ping, etc. must be completed before 7/requesling thls i nsPection. l'/ FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the Premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE VALIDATION: