Loading...
HomeMy WebLinkAboutPermit Building 1999-05-07COM M ERCIAL/IN DUSTRIAL PERMIT APPLICATION 225 Fitth Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WORK SPRINGFIELD JOB NUMBER 0 INSPECTION LINE: 726-3769 OFFICE: 726-3759?fr,42.ot 5 tr ASSESSORS MAP:t1 6 Os 5ooTAX LOT PHONE: STATE ZIP:77qt z OWNER ADDRESS CITY: T ADDITION DEMOLISH OTHER 67 orVALUE: /-4, fu,iDESCRIPTION OF WORK: NEW- REMODEL Er trrrTot/^A I NAME ADDRESS PHONE ADDRESS EXPI RES PHONE E5f € x Causr CONTRACTOR'S NAME ARCHITECT: GENERAL: PLUMBING: MECHANICAL: / lutsT //' coNsT. CONTRA TOR # Cc7 fqr 3 / PLU MBING NO FEE CHARGE Single Fixture Relocated Bldg. (new fix. addtl) Water Service ft Sanltary Sewer ft Storm Sewer ft Backflow Device TOTAL PERMIT MECHANICAL NO trFF nHA Qaltr Furnace/burner & vent <100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent FaniSingle duct Vent f rom sys AC tem apart or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - OFFICE USE - LAND USE: ZONING* OF UNITS: HANDICAP ACCESS: LIGHTING POWER BUDGET:OCCY GROUP: * OF STOBIES: QUAD AREA: I OF BLDGS: CONSTR. TYPE: HEAT SOURCE: FLOOD PLAIAL WATER HEATER: SQ. FT.$/so. FT.VALUE b/ TOTAL VALUE OF PROJ x x X. SQ. FTG MAIN SQ. FTG ACCESS SO. FTG OTHER RCPT#PLAN CHECK FEE DATE BY BUILDING PERMIT 770 .,4 PLUMBI NG DEMOLITION 5% State Su rcharo e n? /ltr ld.zo 5% State Surcharoe MECHANICAL /FENCE VALUE S 5% State Surcharoe SIDEWALK FT. SUBTOTAL PERMITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUOING ELECTRICAL 1[7. ?-b REQUIRED INSPECTIONS It is the responslbillty of the permit noil", to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB PLUMBING, inspections have been made sPEclAL INSPECTIoNS: ln accordance ELECTRICAL & and approved. Section 306 0f the state Specialty code MECHANICAL: To be made a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & Oy ine Owner/ Contractor during CURTAIN WALLS construction of the following work. A FOOTINGS & FOUNDATIONS: ^AE. F copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division. excavated and forms are facing materials and before erected, ail steel in ptace, but framing inspection srRUcruRAL CoNCRETE: ln prior to placing concrete. FRAMING: To be made after excess of 2500 P.S.l. (306 a.1) coNcRETE SLAB: To be the roof' all framing' fire made arter a, insrab buirdins :l:::'::.;ln Sfjlf,Xl:r" ilny'gy.t3"t rY5tT',rrr, , service equipment, conduit, and vents are complete and :1,1[,?;""".T;il1".i ?{}1"TH :n:;::mli""iltfl i#[i:?: 3l?:f],?E],?T,i",?i.'lH1"oin place but before any tighte-ning operations. (306 concrete ls placed. INSULATION & VApOR a.6) BARRIER: Tb be made after all UNDERGROUND: Plumbing, lnsulatlon and requlred vapor SPRAYED ON' electrical, gas, sanitary sewer, barriers are in place but FIREpROOFING: U.BC.storm Sewer, water and before any lath or gypsum Standards 43-g.dralnage lines. To be made board lnterior wall covering is prlor to covering or filling applied. S,ECIAL GRAD'NG,trenches. ,NDERFL..R: prumbins [:::,s'"'#m'J;[Ht"' il:fut'iiil#ii.',5Jb'i],"1 electrical, mechanlcal. To be according to plans. chapter 29) made prior to installation of floor insulation, decking or LATH AND/SR GYPSUM GLU'LAM BEAMS: lnspection floor sheathing. BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency, furnished to the city's poST & BEAM: To be made interior and exierior, is in Building Division before prlortolnstallatlonoffloorplacebutbeforeanybeamsareplaced.(2501U.Bc. insulatlon, decking or floor plastering ls applied or before STDS' 25-10'11)' sheathlng. gypsum board joints and fasteners are taped and STRUCTURAL MASONRY: (306 FLooR rNsuLATroN & finished' a'7\ VAPOR BARRIERS: To be made prlor to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or vertlcals in accordance with uBc 2415. RooF sHEATHING AND iHffi^H'^ttJ"t:,oi""li," NAILING: Prior to installing erected but prior to placing any roof covering. concrete. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. "ln addition to the inspec- tions specif ied, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. - FIN FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot stri pi ng, etc. must be completed before ting this inspection BUILDING: Requested after the final plumbing, electrical, cal and Fire Department inspections are made and roved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises.FINAL FIRE DEPARTMENT ADDITIONA.L COMMENTS. PLANS REVIEWED BY fru,r%fi<x DATE--7 By signature, I state and agree, that I have caref ully examined the completed applicatlon and do hereby certify that all information herein is true and correct, and lfurther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Sprlngfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compllance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable f rom the street, that t card is loc at the front of the property, and the approved set of plans will remain on the site at all times duri c on. Signature Date VALIDATION t,J AMOUNT RECEIVED RECEIPT *: U I U v C/ DATE PAID RECEIVED BY: f1''