HomeMy WebLinkAboutStudies APPLICANT 11/30/2020Stormwater Management Plan and Drainage Study Hayden Bridge Filtration Plant: Lab Building Parking Lot Branch Engineering Project #20-234 For Nathan Endicott, P.E. Eugene Water and Electric Board 4200 Roosevelt Blvd Eugene, Oregon 97402 �N' 1 NpF:� Mower o..'.;_. OREGON Err. DEr&M 31, 2020 ENIGINEERING= November 19, 2020 Slue 1977 civil - transportation structural - geotechnical SURVEYING www.BranchEngineering.com Contents Page No 1.0 Introduction............................................................................................................... 1 2.0 Existing conditions.................................................................................................1 2.1 Topography & Existing Drainage 1 2.2 Soils 1 3.0 Proposed Development.........................................................................................2 4.0 Stormwater Management.....................................................................................2 4.1 Stormwater Summary 2 4.2 Stormwater Analysis 3 5.0 Stormwater Compliance........................................................................................3 5.1 Water Cual ty Treatment 3 5.2 Flow Control 4 6.0 Conclusion..................................................................................................................4 Appendices Description Appendix A HydroCAD Analysis Appendix B NRCS Soils Data Appendix C Stormwater Scoping Sheet Hayden Bridge Filtration Plant, (20-234) November 19, 2020 1.0 INTRODUCTION This Stormwater Management Plan (SWMP) has been prepared for the EWEB Hayden Bridge Filtration Plant located northwest of the intersection of Hayden Bridge Road and Marcola Road, atop of Mina Butte. The new development consists of a new lab and backup services building with parking lot improvements. The tax lot of the project site is TM 17021900 TL 03300. The project falls within the City of Springfield but no runoff from the site will reach existing city systems. There is no public system in the vicinity of the site for it to drain into. All runoff will be captured and filtered on-site. There is a conveyance system in the area. This system captures current runoff and directs it downstream to a pond located on the northeast corner of the site. This report will display the drainage conditions of the site and how they meet current city code requirements for treatment. 2.0 EXISTING CONDITIONS 2.1 TOPOGRAPHY & EXISTING DRAINAGE The existing site is sloping towards the east with elevations ranging between 588 and 580 feet. The subject site is situated on approximately 50.28 acres, with the project area being approximately 1.5 acres. The site is primarily used as a filtration plant with some landscaping surrounding the site. The current drainage pattern is that the runoff drains to the northeast through an existing Swale and filters into a sludge pond which is a part of the filtration plant process. The current Swale receives stormwater off a disinfection building and the surrounding land The following table displays the area of existing development before any improvements are made. Table 1: Ecisting Basin Summary Basin ID Summary Area (S. F) SUM Existing Grass/ Building Existing Impervious Existing Landscape Roof Area Gravel (CN -75) (CN=98) (CN=98) (CN=90) EC Existing Conditions 23,250 8,500 14,660 18,840 65,250 2.2 SOILS According to the Natural Conservation Service Website mapping services, the existing soils at the site are Rimer cobbly silty clay loam (NRCS Soil #113E). This and is in the Hydrologic Group C, where water transmission through the and is somewhat restricted. Appendix B includes the NRCS Web Sold Survey data. Branch Engineering, Inc. Hayden Bridge Filtration Plant, (20-234) November 19, 2020 3.0 PROPOSED DEVELOPMENT This report is for the stormwater treatment and management resulting from the proposed parking lot design and improvements around the new Lab building which is currently under construction at the EWEB Hayden Bridge Filtration Plant in Springfield. The development consists of an under -construction lab and backup services building along with the proposed parking lot improvements. The existing swale located to the east of the existing buildings will receive more stormwater from the added impervious surface; i.e. the new parking lot. The total added impervious area is approximately 19,900 sq ft Stormwater treatment will be on-site and will not reach any City of Springfield stormwater systems, therefore the stormwater from the new impervious areas does not add any impact to the city systems. Stormwater capacity does not pose any concerns due to the unique circumstances of the project site. All runoff can be captured and filtered on-site starting with the existing swale and eventually depositing runoff into sludge ponds downstream of the swale. Stormwater that enters the sludge pond will have an imperceptible impact on the pond due to the size of pond. From there, the water will enter into the filtration plant process and be treated accordingly. 4.0 STORMWATER MANAGEMENT 4.1 STORMWATER SUMMARY A majority of the impervious surfaces will be directed to the swale which will have filtration capabilities with the vegetation that will provide the basic level of water quality treatment. The first goal for the stormwater design was to use the resources on-site in order to eliminate impacts to the public storm systems. The pre-existing vegetated Swale will serve as a basin to direct and treat stormwater runoff from the existing as well as the new impervious areas. As all the stormwater will be treated on site by the swale and then the water treatment facility, the SDC's and monthly stormwater fees from the new improvements will be very minimal. The majority of the runoff from the existing structures; i.e. planters, sidewalks, building roofs and asphalt roadways and pavements was already being directed to the existing Swale. This conveyance system will not be interrupted from the proposed parking lot improvements. A dual chamber catch basin is added near the northwestern corner of the under -construction lab building. Majority of the new impervious area from the parking lot will be directed to the dual chamber catching basin, which will then be connecting into an existing stormwater pipe leading it to the existing swale. The remainder of the new impervious area will be entering the swale through a curb cutout down the drive aisle. According to the City of Eugene Stormwater Management Manual, Swales "are long and narrow vegetated and grassed depressions used to collect, detain and convey stormwater runoff which allows pollutants to settle and filter out as the water flows through the facility. " The swale will treat a majority of the runoff from the new pavement as well as the roofs. Branch Engineering, Inc. Hayden Bridge Filtration Plant, (20-234) November 19, 2020 4.2 STORMWATER ANALYSIS Stormwater calculations were determined HydroCAD 10.00 modelling software. HydroCAD 10.00 utilizes the Santa Barbara Unit Hydrograph hydraulic modeling method. All results of the analysis are included in Appendix A. 24 -Hour Rainfall depths are based on City of Springfield Engineering Design Standards & Procedures Manual, Chapter 4. The site was split into 4 basins: • Basin 1 - Is the existing building roof area that is directed to the swale located to the east of the under -construction and existing building. • Basin 2 - Consists of the existing landscape areas. The stormwater runoff from this basin is directed to the existing swale as well. • Basin 3 - Is the second largest basin It covers most of the existing impervious areas from the pavement, sidewalk and existing asphalt roadway. The stormwater runoff from this basin is directed to the existing swale. • Basin 4 - Was previously a gravel pad, but now will be converted to asphalt pavement. This basin area was previously classified as an impervious area, even though gravel has a lower CN of 90 compared to a higher CN of 98 for asphalt surface. It can be argued that the stormwater runoff from this basin cannot be completely classified as new impervious area. The stormwater runoff from this area will be directed to the existing swale. The following table displays the areas of existing and new development after improvements have been made. New impervious areas have been added to the site by replacing existing gravel areas. Hence, there is very slight increase in the total area being directed to the swale. Table 2 PostDevelopmentBasin Summary 5.0 STORMWATER COMPLIANCE 5.1 WATER QUALITY TREATMENT The form of water quality treatment for the stormwater runoff of the impervious surfaces is described by two different processes. The first process of treatment will occur as the runoff filters through the vegetated swale which is located alongside the existing driveway of the site and runs downhill towards a sludge pond. The swale will discharge the runoff through a catch basin that will deposit it into the sludge pond. The second process of treatment occurs after the runoff enters Branch Engineering, Inc. Swale Basin Building Roof Landscape/Grass Impervious Area Minimum ID Summary (CN=98) (CN =79) (pavement) sl1M Travel Time (CN=98) (min) Existing Areas EB —Developed 8,500 23,250 13,750 Condition 65,400 12.2 NI New _ 19'900 Improvements 5.0 STORMWATER COMPLIANCE 5.1 WATER QUALITY TREATMENT The form of water quality treatment for the stormwater runoff of the impervious surfaces is described by two different processes. The first process of treatment will occur as the runoff filters through the vegetated swale which is located alongside the existing driveway of the site and runs downhill towards a sludge pond. The swale will discharge the runoff through a catch basin that will deposit it into the sludge pond. The second process of treatment occurs after the runoff enters Branch Engineering, Inc. Hayden Bridge Filtration Plant, (20-234) November 19, 2020 the existing sludge pond, and runs through the filtration plant process beginning at the sludge pond The swale described above was designed to meet City of Eugene Stormwater Management requirements. This section will briefly confirm that the treatment mechanisms are in fact meeting those requirements. From the HydroCAD analysis in Appendix A, the minimum travel time is above 9 minutes for the swale. This shows that the existing swale layout and length provide adequate treatment for the new impervious areas and the existing landscape and impervious areas. 5.2 FLOW CONTROL Due to the site's unique self-sufficient conveyance and water treatment system, this site is not required to detain runoff in order to meet pre -developed discharge rates meeting the City's flow control requirements. Off-site flow control is not a concern due to no off-site runoff. The depth of the swale varies, but it is generally over 0.6 feet. During a 25 -year storm event, from the HydroCAD calculation in Appendix A, the average depth at peak storage is 0.28 feet. Therefore, it is safe to conclude that the capacity of the system will be sufficient during a 25 -year storm event and the swale will not be experiencing any overflow effects. 6.0 CONCLUSION The stormwater system for the Hayden Bridge Filtration Plan Project has been designed to be self- sufficient. While the swale provides standard filtration treatment of the runoff from new and existing surfaces, the unique situation of the site being a water filtration plant provides additional treatment and eliminates water from leaving the site. Therefore, this project meets and exceeds City of Springfield requirement for stormwater treatment and flow control. Branch Engineering, Inc. 4 APPENDIX A Hyd roCAD Analysis EC Existing Areas - Existing Conditions EB 6R Existing Areas - Developed Condition Existing Swale NI New Improvements Subcat Reach On Link Routing Diagram for 20-234 StonnModel WD—SWALE Prepared by Branch Engineering, INC, Printed 11/18/2020 Hydro AD®10,00-25 sM 098]8 O 2019 Hydro AD So%ere SduIkns LLC Branch Enaineerina. INC Type lA 24 -hr 2 yr Rainfall=3.30" Printed 11/182020 Paae 2 Summary for Subcatchment EB: Existing Areas -Developed Condition Runoff = 0.55 cfs @ 8.01 hrs, Volume= 0.182 af, Depth= 2.09" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type IA 24 -hr 2 yr Rainfall=3.30" 23,250 79 50-75% Grass cover, Fair, HSG C * 8,500 98 Existing Building * 1,500 98 Sidewalk + CONC Areas * 5,680 98 Existing Asphalt Road * 6,570 98 Existing Asphalt Pavement 45,500 88 Weighted Average 23,250 51.10% Pervious Area 22,250 48.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Summary for Subcatchment EC: Existing Areas - Existing Conditions Runoff = 0.83 cfs @ 7.99 hrs, Volume= 0.271 af, Depth= 2.17" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type IA 24 -hr 2 yr Rainfall=3.30" 23,250 79 50-75% Grass cover, Fair, HSG C * 8,500 98 Existing Building * 14,660 98 Existing Impervious * 18,840 90 Existing Gravel 65,250 89 Weighted Average 42,090 64.5196 Pervious Area 23,160 35.49% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Summary for Subcatchment NI: New Improvements Runoff = 0.35 cfs @ 7.94 hrs, Volume= 0.117 af, Depth= 3.07' Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type IA 24 -hr 2 yr Rainfall=3.30" rmModel_Wf_SWALE Type lA 24 -hr 2 yr Rainfall=3.30" Branch Enaineerina. INC Printed 11/182020 Area (sf) CN Description * 19,900 98 New Asphalt 19,900 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Summary for Reach 611: Existing Swale Inflow Area = 1.501 ac, 64.45% Impervious, Inflow Depth = 2.39" for 2 yr event Inflow = 0.90 cfs 7.99 hrs, Volume= 0.298 of Outflow = 0.89 cfs 8.03 hrs, Volume= 0.298 af, Atten= 1%, Lag= 2.7 min Routing by Dyn-Scor-Ind method, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs / 2 Max. Velocity= 0.39 fps, Min. Travel Time= 5.2 min Avg. Velocity = 0.17 fps, Avg. Travel Time= 11.7 min Peak Storage= 277 cf @ 8.03 hrs Average Depth at Peak Storage= 0.22' Bank -Full Depth= 1.00' Flow Area= 17.0 sf, Capacity= 15.58 cfs 9.00' x 1.00' deep channel, n= 0.250 Side Slope Z -value= 8.0'f Top Width= 25.00' Length=120.0' Slope= 0.0400 'f Inlet Invert= 582.50', Outlet Invert= 577.70' Branch Enaineerina. INC Type IA 24 -hr 25 yr Rainfall=4.80" Printed 11/182020 C Paae 4 Summary for Subcatchment EB: Existing Areas -Developed Condition Runoff = 0.94 cfs @ 7.99 hrs, Volume= 0.303 af, Depth= 3.48" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type IA 24 -hr 25 yr Rainfall=4.80" 23,250 79 50-75% Grass cover, Fair, HSG C * 8,500 98 Existing Building * 1,500 98 Sidewalk + CONC Areas * 5,680 98 Existing Asphalt Road * 6,570 98 Existing Asphalt Pavement 45,500 88 Weighted Average 23,250 51.10% Pervious Area 22,250 48.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Summary for Subcatchment EC: Existing Areas - Existing Conditions Runoff = 1.39 cfs @ 7.97 hrs, Volume= 0.447 af, Depth= 3.58" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type IA 24 -hr 25 yr Rainfall=4.80" 23,250 79 50-75% Grass cover, Fair, HSG C * 8,500 98 Existing Building * 14,660 98 Existing Impervious * 18,840 90 Existing Gravel 65,250 89 Weighted Average 42,090 64.5196 Pervious Area 23,160 35.49% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Summary for Subcatchment NI: New Improvements Runoff = 0.52 cfs @ 7.94 hrs, Volume= 0.174 af, Depth= 4.56" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type IA 24 -hr 25 yr Rainfall=4.80" rmModel_Wf_SWALE Type IA 24 -hr 25 yr Rainfall=4.80" Branch Enaineerina. INC Printed 11/182020 Area (sf) CN Description * 19,900 98 New Asphalt 19,900 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Summary for Reach 611: Existing Swale Inflow Area = 1.501 ac, 64.45% Impervious, Inflow Depth = 3.81" for 25 yr event Inflow = 1.46 cfs 7.97 hrs, Volume= 0.477 of Outflow = 1.45 cfs 8.02 hrs, Volume= 0.477 af, Atten= 1%, Lag= 3.0 min Routing by Dyn-Scor-Ind method, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs / 2 Max. Velocity= 0.45 fps, Min. Travel Time= 4.4 min Avg. Velocity = 0.20 fps, Avg. Travel Time= 10.0 min Peak Storage= 383 cf @ 8.02 hrs Average Depth at Peak Storage= 0.28' Bank -Full Depth= 1.00' Flow Area= 17.0 sf, Capacity= 15.58 cfs 9.00' x 1.00' deep channel, n= 0.250 Side Slope Z -value= 8.0'f Top Width= 25.00' Length=120.0' Slope= 0.0400 'f Inlet Invert= 582.50', Outlet Invert= 577.70' Branch Enaineerina. INC Type IA 24 -hr I44Q Rainfall=0.83" Printed 11/182020 Paae 6 Summary for Subcatchment EB: Existing Areas -Developed Condition Runoff = 0.02 cfs @ 8.08 hrs, Volume= 0.014 af, Depth= 0.16" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type IA 24 -hr WQ Rainfall=0.83" 23,250 79 50-75% Grass cover, Fair, HSG C * 8,500 98 Existing Building * 1,500 98 Sidewalk + CONC Areas * 5,680 98 Existing Asphalt Road * 6,570 98 Existing Asphalt Pavement 45,500 88 Weighted Average 23,250 51.10% Pervious Area 22,250 48.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Summary for Subcatchment EC: Existing Areas - Existing Conditions Runoff = 0.04 cfs @ 8.07 hrs, Volume= 0.023 af, Depth= 0.19" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type IA 24 -hr WQ Rainfall=0.83" 23,250 79 50-75% Grass cover, Fair, HSG C * 8,500 98 Existing Building * 14,660 98 Existing Impervious * 18,840 90 Existing Gravel 65,250 89 Weighted Average 42,090 64.5196 Pervious Area 23,160 35.49% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Summary for Subcatchment NI: New Improvements Runoff = 0.07 cfs @ 7.97 hrs, Volume= 0.024 af, Depth= 0.63" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type IA 24 -hr WQ Rainfall=0.83" rmModel_Wf_SWALE Type IA 24 -hr 144Q Rainfall=0.83" Branch Enaineerina. INC Printed 11/182020 Area (sf) CN Description * 19,900 98 New Asphalt 19,900 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Summary for Reach 611: Existing Swale Inflow Area = 1.501 ac, 64.45% Impervious, Inflow Depth = 0.30" for WO event Inflow = 0.09 cfs 8.03 hrs, Volume= 0.038 of Outflow = 0.08 cfs 8.11 hrs, Volume= 0.038 af, Atten= 8%, Lag= 4.5 min Routing by Dyn-Scor-Ind method, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs / 2 Max. Velocity= 0.16 fps, Min. Travel Time= 12.2 min Avg. Velocity = 0.09 fps, Avg. Travel Time= 22.9 min Peak Storage= 60 cf @ 8.11 hrs Average Depth at Peak Storage= 0.05' Bank -Full Depth= 1.00' Flow Area= 17.0 sf, Capacity= 15.58 cfs 9.00' x 1.00' deep channel, n= 0.250 Side Slope Z -value= 8.0'f Top Width= 25.00' Length=120.0' Slope= 0.0400 'f Inlet Invert= 582.50', Outlet Invert= 577.70' APPENDIX B NRCS Soils Data e \ 11 MaYtle� B r �I r G - moues is �� -- •w VC 7". Soil Map—Lane County Area, Oregon _SD, Natural Resources web Sol Survey WW2D2D alaill Conservation Service National Cooperative Sail Survey Page 2 of 3 MAP LEGEND MAP INFORMATION Area at Wake. tA09 Spoil Area The sal surveys that comprise your AOI were mapped at Areaalnteresr(AQII Q army Spa 1:20,090. Soils Very Sony SpaWaming: Soil Map may not be valud al Mrs scale. 0 Soil Map Unit Polygons 9 VJrf S p a Enlargement of maps bethe scale of mapping can cause ,.,. Soil Map Unic Lines md Sell of the etail of mapping and accuracy of soil 4 Other line placement. The maps do not show the small areas of Map Unit Points contrasting soils that could have been shown at a more detailed Special Line FeaturesSoil Special Point Features scale. Lg Blowout water Features Streams and Canals Please rely on the bar scale on each map sheet for map ® Borrow Pit measurements. Trenspartatian Clay Spot Rails Source of Map: Natural Resources Conservation Service 0 Closed Depresdan Web Soil SurveyURL: Interstate Highways Coordinate System: web Mercator(EPSG:3B5]) Gravel Pit US Routes Maps from the Web Soil Survey are based on the Web Mercator Gravely Spa Major Roads projection, which preserves and shape but schdistorts and area, projection that preserves area, such as the ion that ® Landfill Local Roads Abersdistance o Albers equal-area conic projection, should be used if more Lava Flow accurate calculations of distance or area are req uired, Background aga Marsh or swamp . Aerial Photography This productis generated from the USDA­gRCS tended data as of Ne version date(s) listed below. .�. Mine or Query Soil Survey Area: Lane County Area, ® Miscellaneous Ydscer un11,20M Survey Area Data: Version 1l, Jun 11, 2020 ® Perennial VMmer Sail map units are labeled (as space allows) for map scales y, Rock Outcrop 1:50,099 or larger. A Saline Spot Dates) aerial images were photographed: Jun 12, 2019i 19, 2019 Sandy Spot The odhophoto or other base map on which the soil lines were Severely Eroded Spot compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor Sinkhole shifting ofmap unit boundaries may be evident, �p Slide or Slip Sodic Spot _SD, Natural Resources web Sol Survey WW2D2D alaill Conservation Service National Cooperative Sail Survey Page 2 of 3 Sal Map�ane Connty Area, Oregon Map Unit Legend LSDA Natural Resources Web Soil Survey &14/2020 iMi Conservation Serme National Cooperatirve Soil Survey Page 3 of3 Map Unit Synibd Map Unit Name Acres in AOI Percent of AOI 32 Coburg4 ffian land cornplex 1.2 2.2% WC Nekle silly day loam, 21012 percent slopes 0.1 0.2% 108C Philornath cobbly slay day, 310 12 percent slopes 0.1 0.1% 113C Rihier cobbly silty clay loam, 2 to 12 percent slopes 22.7 43.4% 113E Ribier cobbly silty clay loam, 1210 30 percent slopes 2].8 53.2% 119 Salern-Urban land complex 0.4 0.8% Toads far Area of Interest 52.2 100.0% LSDA Natural Resources Web Soil Survey &14/2020 iMi Conservation Serme National Cooperatirve Soil Survey Page 3 of3 Map Unit Description: Ritner cobbly silty clay loam, 12 to 3D percent slopes --lane County Area, Oregon Lane County Area, Oregon 113E—Ritner cobbly silty clay loam, 12 to 30 percent slopes Map Unit Setting National map unit symbol. 233t Elevation. 400 to 1,800 feet Mean annual precipitation: 40 to 60 inches Mean annual air temperature: 50 to 54 degrees F Frost -free period. 165 to 210 days Farmland classification. Not prime farmland Map Unit Composition Rkner and similar soils. 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Rimer Setting Landform: Hills Landform position (two-dimensional): Shoulder, summit Landform position (three-dimensional): Interfluve, nose slope Down-slope shape: Linear Across -slope shape: Linear Parent material. Cobbly colluvium derived from basic igneous rock Typical profile Oi-Oto 1 inches. slightly decomposed plant material Hl - 1 to 8 inches: cobbly silty clay loam 1-12 - 8 to 33 inches: very cobbly silty clay loam H3 - 33 to 37 inches: unweathered bedrock Properties and qualities Slope: 12 to 30 percent Depth to restrictive feature: 20 to 40 inches to lithic bedrock Drainage class. Well drained Capacity of the most limkirg layer to transmit water (Ksat): Moderately high (0.20 to 0.57 in/hr) Depth to water table: More than 80 inches Frequency of floodirg: None Frequency of ponding: None Available water capacity. Low (about 4.9 inches) Interpretive groups Land capability classification (irrigated): None specified Lard capability classification (nonirrigated): 6s Hydrologic Soil Group: C Forage suitability group: Well Drained > 15% Slopes (GO02XY0010R) Other vegetative classification. Well Drained > 15% Slopes (GO02XY0010R) LSDA Natural Resources l4pb Soil Survey w14/202o i Conservation Serves National Cooperative Soil Survey Pagel oft Map Unit Description: Ritner cobbly silty clay loam, 12 to 30 percent slopes --lane County Area, Oregon Hydric soil rating: No Data Source Information Soil Survey Area: Lane County Area, Oregon Survey Area Data: Version 17, Jun 11, 2020 LSDA Natural Resources Web Soil Survey g/14/202o i Conservation Serme National Cooperative Soil Survey Page 2 oft APPENDIX C Stormwater Scoping Sheet 225 FIFTH STREET SPRINGFIELD, OR 97477 PHONE: 541.726.3753 FAX. 541,726,1021 www springfield-or.gov STORMWATER MANAGEMENT SYSTEM SCOPE OF WORK --------------------- (Area below this line filled out by Applicant) ------------------- (Please return to Clayton McEachern @ City ofSpringrehiDevelopmentand Public Works; Fax # 736-1021, Phone # 736-1036), email: cmceachern@springreld-or.gov Project Name: 0A -(opo gypr�;t,gg g,t,�,,,g Applicant: "Bg}� &jBtNESRIN6 WC Assessors Parcel #: 1�-021�D6o3;oa A`twt-er Date: 6/Z& /2420 Land Use(s): w"m Ta.EAT+�+e4T Flour( Phone #: SI(/ - ?A - 063} Project Size (Acres): ti 0.5-1.0 Fax #: Approx. Impervious Area: IQ, too Fr2 Email: GREG nn 13AANCk6NBIN�12tniG. COM Project Descrip ion (Include a copy of Assessor's map): _PH'r-C(Q FAA-,Otr LOT ,N ;:eRo mT of L,+9 RUlr'Dl MCw C VrSaE4 CoNSTALC ts" 1. JJ Drainage Proposal (Public connection(s), discharge location(s), etc. Attach additional sheet(s) if necessary: PLSC,AAR66 )0Tb Ca a.RZOT Sw A+e PrtaNy DA.NEWAy (ove2SiTors, sUQllry VsT,6r&FM7 017µ RwHR Roca AS LINFa) Proposed Stormwater Best Management Practices: VE61"IT" INFI6TPATIbN TRepT#u WT 1N piSTtN6 Sw hCE, he/ow this line filled out by the City and Returned m the Annlicamt) — (At a minimum, all bases checked by the City on the frontand back of this sheet shall be submitted for ana lication to be completefor submittal, although other requirements may benecessary) Drainage Study Type (EDSPM Section 4.03.2): (Vote UH may be substituted for Rational Method) ❑ Small Site Study — (use Rational Method for calculations) ❑ Mid -Level Development Study— (use Unit HydmgraphMethod for calculations) ❑ Full Drainage Development Study — (use Unit Hydrograph Method for calculations) Environmental Considerations: ❑ Wellhead Zone: n/a ❑ Hillside Development: Fla ❑ Wetland/Riparian: Fla ❑ Floodway/Floodplain: Fla ❑ Soil Type: 113c-Rittner Cobly silty clay loam ❑ Other Jurisdictions n/a Downstream Analysis: ❑ N/A ❑ Flow line for starting water surface elevation: ❑ Design HGL to use for starting water surface elevation: ❑ Manhole/Junction to take analysis to: Return to Clayton McEachern @ City of Springfield, email: cmceachern@spnngfield-orgov, FAX: (541) 736-1021 9 of 10 COMPLETE STUDY ITEMS Fw Od a Use ONy. *Based upon the informanam provided on the front of this sheet, the following represents a minimum of whm is needed for an application to be complete for submittal with respect to drainage; however, this list should not be used in lieu ofthe Springfield Development Code (SDQ or the City's Engineering Design Manual Compliance with these requirements does not constitute site approval; Additional site specific information may be required Now: Upon scoping sheet submittal, ensure completed form has been signed in the space provided below. Interim De' n StandaMs/Water Quality (EDSPM Cha r3 Req'd N/A 7 ❑ All non -building rooftop (NBR) impervious surfaces shall be pre-treated (e.g. multi-chambered calchbasin Wail filtration media) for slormwater quality. Additionally, a minimum of 50% of the NBR impervious surface shall be treated by vegetated methods. 0 ❑ Where required, vegetative stormwater design shall be consistent with design standards (EDSPM Section 3.02), set forth in Chapter 2 of the Eugene Stormwaler Management Manual. ❑ For new NBR impervious area less than 15,000 square feet, a simplified design approach may be followed as specified by the Eugene Stormwater Management Manual (Sec2.4.1). If a stormwaler treatment swale is proposed, submit calculations/specifications for sizing, velocity, flow, side slopes, bottom slope, and seed mix consistent with City of Springfield or Eugene's Stormwater Management Manual. Water Quality calculations as required in Section 3.03.1 of the EDSPM. ❑ All building rooftop mounted equipment, or other fluid containing equipment located outside of the building, shall Zj ❑ 0 0 ❑ Drainage study prepared by a Professional Civil Engineer licensed in the state of Oregon. Q' A complete drainage study, as required in EDSPM Section 4.03.1, including a hydrological study map. Calculations showing system capacity for a 2 -year storm event and overflow effects of a 25 -year storm event. The time of concentration (Tc) shall be determined using a 10 minute start throe for developed basins. Review of DownstreamS stem EDSPM Section 4.03.4.0 QA downstream drainage analysis as described in EDSPM Section 4.03A.C. On-site drainage shall be governed by the Oregon Plumbing Specially Code (OPSC). ElD Elevations of the HGL and flow lines for both city and private systems where applicable. ❑ [D Design of Storm Systems (EDSPM Section 4.04). Q Flow lines, slopes, rim elevations, pipe type and sizes clearly indicated on the plan set. Minimum pipe cover shall be 18 inches for reinforced pipe and 36 inches for plain concrete and plastic pipe materials, or proper engineering calculations shall be provided when less. The cover shall be sufficient to support an 80,00016 load without failure of the pipe structure. Manning's "n" values for pipes shall be consistent with Table 4-1 of the EDSP. All storm pipes shall be designed to Existing and proposed contours, located at one fool interval. Include spot elevations and site grades showing how site drains. F� Private slormwater easements shall be clearly depicted on plans when private slormwaler flows from one property to another. Drywells shall not receive mnoff from any surface w/o being treated by one or more BMPs, with the exception of residential building roofs (EDSP Section 3.03.4.A). Additional provisions apply to this as required by the DEQ. Refer to the website: httn://www.deg.state.or.us/wg/uic/uie.htm for more information. ❑ Detention ponds shall be designed to limit runoff to pre -development rales for the 2 through 25 -year storm events. *This form shall be Includedas an attachment, inside the front cover, of the stormwater study. • IMPORTANT: ENGINEER PLEASE READ BELOW AND SIGNf As the engineer of record, I hereby certify the above required items are complete and included with the submitted slormwaler study and plan set. Signature Date Form Version 5: Jane 2015 10 of 10