Loading...
HomeMy WebLinkAboutPermit Building 1991-05-30COM M ERCIAL/ IN DUSTRIAL PERMIT APPLICATION 225 Fitfi Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WORK: ASSESSORS MAP: SPRINGFlELO .-'JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 TAX LOT: ,h, PHON E: ZIP: 4 STATE: OWNER: ADDRESS CITY: VALUEOTHER*- DESCRIPTION OF WOR ADDITION DEMOLISHNEW- REMODEL MECHANICALi - rI EfrEIAA I . PHON EESSNAME2/48? Yriua EXPI RES PHO NEMEADDRESS AD ARCHITECT: CONT CONST. CONTRACTOR # GENERAL: PLUMBING PLU MBING NO.FEE CHARGE Single Fixture Relocated Bldg. (new fix. addtl) Water Service ft. Sanitary Sewer ft. Storm Sewer ft Backf low Device TOTAL PERMIT MECHANICAL NO FFF CHARGE Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT _ OFFICE USE -3E,Ntr. \ 53 * OF UNITS: LAND USE HANDICAP ACCESS: FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER: CONSTR. TYPE: HEAT SOURCE: OCCY GROUP: * OF STORIES: QUAD AREA: g OF BLDGS: SQ. FT,$/SQ. FT.VALUE /4eV-ety'Pr 2=nf+a" TOTAL VALUE OF PROJ X X SO. FTG MAIN SQ. FTG ACCESS SO. FTG OTHER PLAN cHEcK FEE //,78 RCPT#DATE BY 27,76 BUILDING PERMIT /7.p PLUM BI NG DEMOLITION 5% State Su rch aro e e8 5% State Su rch aroe MECHANICAL FENCE VALUE $ 5% State Su rcharoe SIDEWALK FT. SU BTOTAL PERMITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL ZONING: REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be readyfor inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be madethe following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravet is inmade after excavation, but ELECTRICAL & place but priorlo placingprior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SpECIAL ;NSpECT;ONS: tn accordanceELECTRICAL & and approved. Section 306 of the State Speciatty CodeMECHANICAL: To be made A?r,^ ^hAF- - - a special inspector shall be emplbyedbefore any work is covered. ATTIC DRAFT STOPS & by the Ownei/ Contractor duringCURTAIN WALLS construction of the following work. A FOOTINGS & FOUNDATIONS: copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be'iurnished io the Building Division. excavated and forms are facing materials and before erected, all steel in place, but framing inspection' - STRUCTURAL CONCRETE: lnprior to placing concrete' X FRAMING: To be made after excess of 2500 P.S.l. (306 a.1) coNcRETE SLAB: To be the roof' all framing' fire made after all inslab building blocking and bracing are In STRUCTURAL WELDS: service equipment, conduit, :iTi"1l: :1.:%ffi"i;ijTl:r" Perrormed on the iob' (2722 r) piping, accessories and otherincirarv equipment items are :HH'":li]HI':,1'JJ;[i:?: Bl?:f],iE],f1f,[l"tlHi".in place but before any ti ghtening operations. (306concrete is placed. tNSULATtoN & vApoR a.6) BARRIER: To be made after allUNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are in place but FIREPROOFING: U.BC.storm sewer, water and before any lath or gypsum Standards 43-g.drainage lines. To be made board interior walliovering isprior to covering or f illing applied.trenches. SPEC|AL GRAD|NG, ,NDERFL..R: p,umbins Ilx:,S'.="'f;XA'Jfl[[f "' EX;i}t'iiil-t[',5J:'i],"1 electrical, mechanical. To be according to plans. chapter 29) made prior to installation of floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection floor sheathing. - BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency, furnished to the City's POST & BEAM: To be made interior and exterior, is in Building Division before prior to installailon of floor place but before any beams are placed. (2501 U'BC' insulation, decking or floor plastering is applied or before STDS' 25-10J1)' sheathing. - Sypsum board joints and fasteners are taped and STRUCTURAL MASONRY: (306 FLooR TNSULATToN & finished. a.7) VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. *ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed beforerequesting this inspection. FINAL BUILDING: Requested after the final plumbing, etectrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be mace until aCertificate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS: _ PLANS REVIEWED DATE SBe'?t By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCy will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all Signatu Date Z*t*q/ times d ng ction DATE PAID RECEIVED ONVALI AMOUNT RECEIVED X RECEIPT *: