Loading...
HomeMy WebLinkAboutPermit Mechanical 2000-05-11op-oa&7-o ICOM M ERClAL/I N DUSTRlAL PERMIT APPLICATION 225 Fitlh Street, Springfield, Oregon 97477 SPRINGFIELO JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK:It so 3gnd Srreesz' ASSESSORS MAP:TAX LOT:otQi>_ PHONE: RlN6tr {ExO ZIP:STATE:CQ E-TA L CITY: ADDRESS: OWNER:)b5O 33^d ST U t L$ INt6 PRODUQ,tS NEW - REMODEL ADDITION DEMOLISH OTHER VALUE: Ga=tDESCRIPTION OF WORK: ELECTRICAL: NAME ADDFIESS PHONE ADDRESS EXPIRES PHONE tq5 4bo1d -b)007a3o)5r. Sf-e- CONTRACTOR'S NAME ARCHITECT: MECHANICAL: CONST. CONTRACTOR # GENERAL: PLUM BI NG ingle Fixture edB addt ft Sani aty ft rm ewer ft Backflow Device TOTAL PERMIT CE; UNDEB IRE,FT'-IE +fig$$P ACCESS: OUAD AREA: * OF BLDGS: LAND USE:TH,SP EHfvi,F[QnmPLArN * OF UNFfS: r-i;r-::::.--.^ABA NDONED DORTNo** vae rcHlUlJ OCCY GROUP: * OF STORIES: CONSTR. TYPE: HEAT SOURCE: LIG HTING R BUDGEI MECHANICAL NO FFtr CI{A EIGtr Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent from System apart AC or htg. Mechanical exhaust hood and duct I fl4,rt 15.* Permit lssuance $10.00 TOTAL PERMIT ?'5,50 SQ. FT.$/SO. FT,VALUE TOTAL VALUE OF PROJ X SQ. FTG MAIN SQ. FTG ACCESS SO. FTG OTHER PLAN CHECK FEE RCPT#DATE BY DEMOLITION Et 7Cl->3FT, m FT, I m;{] {r} €a tsH BUILDING PERMIT PLUMBI NG CURBCUT SIDEWALK MECHANICAL 5% Su e 5% State PAVING ha 5% State Su TOTAL PERMIT FEES EXCLUDING ELECTRICAL FENCE VALUE $ SUBTOTAL PERM ITS SYSTEMS DEVELOPMENT 170a.\o (n H EATER: REOUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:OO a.m. will be made the same working day, requests made after 7:OO a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. FOOTINGS & FOUN DATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete is placed. UN DERGROUN D: PIumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or f illing trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or f loor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing inspection. FRAMING: To be made after the roof, all f raming, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and f inished. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. PAVING: After gravel is in place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. STRUCTURAL CONCRETE: In excess of 2500 PS.l. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 f) HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.B.C. Standards 43-8. SPECIAL GRADING, EXCAVATION AN D FILLING: During earthwork. (306 a.1'l & Chapter 29) GLU-LAM BEAMS: lnspection Certif icate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. sTDS. 25-10,11). STRUCTURAL MASON RY: (306 a.7l *ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springf ield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the front of the property, and the approved set of plans will remain on the site at all s4l/-/ctor-tSignatureDate is loc astreet, that the permit card times during construction. VALIDATION RECEIVED BY: DATE PAIDAMOUNT RECEIVED: RECEIPT S: FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. PLANS REVIEWED BY DATE