HomeMy WebLinkAboutPermit Building 1995-03-06CITY OF ONEGON
SPF!NGFIELD
225 North Fifth SEreeL
Springfield, OR 97477
Location of Proposed Work: 2011 N 19TH ST
Assessors Uap #: 1-703251-3
COMMERCIAI./ INDUSTRIAL PERMIT APPLICATION
CITY OF SPRINGFIELD ilob Number:
COMMT'NITY SERVICES DTVISION
BUII,DING SAFETY
Office
Inspection Line
Page 1
95 185 0
726 -3759
725 -3769
Tax Lot #: 00200
Owner: SELCO CREDIT ITNION
Address: 1050 HIGH STREET
Description Of Work: DRIVE THRU CREDIT ITNION
Phone #: 685-5320
citylsEate/zip: EUGENE, OREGON 9740]-
NEW Va1ue:0.00
Architect
Name
EDWARDS DESIGN
Address
4849 MARSHALL CREEK DR,LAVERNE
Phone
909-s92-0323
--- PLI'}IBING ---
No
3
Fee Charge
30.00
25.00
40.00
40.00
10.00
145.00
Single Fixture
Sanitary Sewer
Water Service
Storm Sewer
BACKFLOW DEVICE
TOTAL PERMIT
t7
54
63
fr.fr.fr.
HANDICAP ACCESS: Y
-- OFFICE USE --
QUAD AREA: 2CNW LAND USE: 5300
Item
Sq. Ftg Main
CANOPY
TOTAL VALUE OF PRO,TECT
Square Feet
384
x $/Square Feet Value
100, 000.00
0.00
100, 000 . 00
Plan Check Fee 281-.45 Rec #: L9745 Date: 1-2/05/95 Rec By: LORNE PLEGER
BUILDING
Surcharge/aamin
MECHANICAL
Surcharge/aamin
PAVING VALUE
PLUMBING
Surcharge/Admin
80,000.00
433.00
34 .64
0.00
0.00
373.00
145.00
11.60
SUBTOTAL PERMITS 997 .24
SPR!NGFIELD
ilob Number: 951850
CITY OF SPRINGFIEIT', ONEGON
Page 2
SYSTEMS DEVELOPMENT
TOTAL PERMIT FEES EXCI,I'DING ELECTRICAL
5 , L6L .42
5, 158.55
REQUIRED INSPECTIONS
It is Lhe responsibility of the permit holder to see that all inspections are
made at the proper time. To request an inspection, call- 726-3759
(recorder), sEaEe your City designated job number, job address, type of
inspection requesEed and when you will- be ready for inspection. Requests
received before 7:00 a.m. will be made the same working day, requests made after
7:00 a.m will be made Ehe following work day.
Special Inspections: In accordance with Section 305 of the State Specialty Code
a special inspector shal-l- be employed by the owner/Contractor during
construction of any following "*" work. A copy of the special testing reports
shall be furnished to Building Safety.
In addition t'o the inspecEions specified, Lhe Building Official may make or
require other inspections of any construction work to ensure compliance wiEh
the Building, City or Development Code.
TEUPORARY POWER
IrIIDERGROITND PLUIIBING - Prior to filling trench.
I,}TDERGROI,ND ELECTRICAI, - PriOr IO COVET.
FOOTING - After trenches are excavated.
SLAB - To be made after al-l inslab building service equipment, conduit
piping, and other eguipment iEems are in place but prior to concrete
ROUGH PLITMBING - Prior to cover.
ROUGH DIECIIAIiIICAt - Prior to cover.
ROUGH ELECTRICAL - Prior to cover.
ELECTRICAL SERVICE - Must be approved to obtain permanent power.
FRAI{ING - Prior to cover.
INSULATION - Floor; prior to decking Wa1l/Ceiling; Prior to cover
DRYWALL - Prior to taping.
WATER IJINE - Prior to filling trench.
SAI{ITARY SEWER LINE - Prior to filling trench.
STORM SEWER LINE - Prior to filling trench.
BACKFLOW DEVICE - After device is j-nsta1led but before backfilling
trench.
ROUGH GRADING - Aft.er gravel is in place but prior to placing concrete
FINAL PLITMBING - When all plumbing work is complete.
FINAL MECIIATiIICAL - When all- mechanicaL work is complete.
FINAIJ ELECTRICAL - When aff electrical- work j-s complete.
HIGH STRENGTH BOLTING - To be done during constr by State Certified
Special Inspector. Results provided Eo City Building Division.
STRUCTITRAL WELDS - To be done during constr by State Cert Special
Inspector. Results of inspection/test to City Building Inspector.
FINAL SITE PLNiI - After all requirements have been met for Minimum
Development Standards or from t.he Development Agreement.
FINAL FIRE - When all Fire Department reguirements have been met.
been met.
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
coNc sr.ABlsus: PRroR TolFoLLOwTNG POI,R
rNsur.-v.8./suB: To BE CALLED FOR AT SAME TrME AS SUB FRAMTNG TNSPECT
FINAL/SUB
ADDITIONAL COMMENTS
SPRINGF!ELD
Job Number: 951850
CITY OF SPruNGFIELT', OREGON
Page 3
DRC #95-09-L75, PLANNER IS LAUREN LEZELL
..]OURNAL #95-09-175, LAUREN LF.ZELL
P1ans Reviewed By: LORNE PLEGER
Building SiEe Reviewed By: LISA HOPPER
Date: oL/L2/96
By signature, I state and agree, that I have carefully examined the compleEed
application and do hereby certify that all information hereon is true and
correct, and I further certify that any and all work performed sha1l be done
in accordance with the Ordinances of tshe CiUy of Springfield, and the Laws
of the StaEe of Oregon pertaining to Ehe work described herein, and that
NO OCCUPANCY will be made of any structure without permission of Ehe
Community Services Division, Building Safety. I further certify that only
contractors and employees who are in compliance with ORS 701.055 will- be
used on this project.
I further agree to ensure that aLL reguired inspections are reguested at the
proper Eime, that project address is readable from the street, that the
permit, card is located at the front of the property, and the approved set
of plans will remain on the site aE aII times during construction.
Ml? rJ a - 6-?6
Signature Date
--- VAI,IDATION ---
24aAReceipt Number:
Date Paid:
Amount Received:
Received By:
6 -<,4
,4zA-2=-
7-6-26
SPFINGFIELD
Page 1
CITY OF SPRINGFIEI.D SYSTEMS DEVETOPMENT CHARGE
(COMMERCIAT / ITTDUSTRIAI,)
OTT OF SPruNGFIEID, ONEGON
Name or Company: SELCO CREDIT IINION
Location: 201,1 N 19TH ST
Developement T)pe: C Building Size
Job No.: 951850
LoE Size Sq Ft
1. STORM DRATNAGE
Impervious Sq Ft 1.0 X 5864
2. SAIiIITARY SEWER - CITY
Number Of PFUS 1.0 X 5
(see Page 2)
X 0.210 Per Sq Ft =
X 43.43 Per PFU =
CosE Per Trip
437.93
3. TRNiISPORTATION
Number Of Units
1.0 x .384 X
X Trip Rate
20.000 x $3,363.30
#L ,23t .44
$2L7 .Ls
$3,353.30
$103.7s
$0.00
$103.7s
$4 ,9L5 .64
$24s.78
Transportation Tot,al
4. SAI{ITARY SEWER - MW}IC
Number Of PFUs
5
5. ADMINTSTR.ATIVE FEES
Base Charge (Subtotal Above)
x
Per PFU +
18.750 +
MWMC Admin Fee
10.00
MWMC CREDTT If Applicable (see Page 2)
TOTAL - MWMC SDC
SUBTOTAL - (Add Itema 1, 2, 3 & 4)
x 0.50
TOTAI. SDC $5 ,L6L.42
Reviewed By: TROY MCALLISTER Date: a2/|e/95
SPRINGFIELD
'fob Number: 951860 Page 2
FIXTURE I'NIT CAI,CUI,ATION TABI.E
OTT OF SPruNGFIELD, ONEGON
Fixture Tlpe
Number of
New FixLure
Unit
Equivalent
Fixture
Units
Bathtub
Drinking Fountain
Floor Drain
Interceptors For Grease/Oi1/Solids/Utc
Inteceptors For Sand/Auto Wash/Et.c
Laundry Tub/CloEheswasher
Cl-otheswasher - 3 Or More
Reeeptor For Refrigerator/Water Station,/utc
Receptor for Commercial- Sink/Dishwasher/Etc
Shower, Single Stall
Shower, Gang
Sink, Bar, Commercial, ResidenEial Kj-tchen
Urinal, StalI/WalI
Wash Basin/LavaLory, Single
Water Closet, Public Installation
WaLer Closet, Private
Miscel-l-aneous
TOTAL FIXTURE UNITS =
CREDIT CALCTLATfON TABLE: Based on assessed vaLue. If improvements occured
after annexaLion date, credits are cal-culated separately.
(calculations are by $1-000)
Year Annexed: L959
Credit For Parce1 or Land only If Applicable: 0 x 0.00 = 0.00
Improvement (if after annexation date): 0 x 0.00 = 0.00
CREDfT TOTAIJ = $0.00
(If land val-ue is multiplied by 1 then the parcel-/land credit is not accurate.)
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
1
0
0
0
0
0
0
0
0
n
0
0
0
1
0
5
2
1
2
3
5
a
A
1
3
a
z
1
6
4