Loading...
HomeMy WebLinkAboutStudies APPLICANT 12/13/2020B E JOHNSON BRODERICK ENGINEERING Memorandum Clayton McEachern, City of To. Springfield From: Mikael Shields, P.E. Subject _ Stormwater System Design 325 West 13' Avenue Eugene, Oregon 97481 541-338-9488 (office) .JBEus.com Date: November 5, 2020 Project Name: North Lake Storage Facility JBE Project Number 20031.03 This memo describes the design intent of the stormwater system for the referenced project for Zachary Reeves located at 4155 E Street, Springfield. The total site area is approximately 22,650 SY of which 13,892 S.F., or 61% is impervious surface (buildings and pavement) which includes the Phase 1 and Phase 2 buildings. The remaining 8759 S.F. of the site is composed of landscaped areas including the stormwater treatmentjnfiltration area. There is no public piped stormwater system available adjacent to the property, therefore all runoff from the site will be treated and infiltrated on-site in a stormwater planter facility designed in accordance with the City of Eugene Stormwater Design Manual (ESDM). The adjacent paved parking and driveway areas are graded to sheet drain directly to the stormwater planter while the building roof drains will be piped and outfall along the perimeter as shown on the Site Plan Sheet C2.1. The stormwater planter surface area is 1232 S.F. and has an allowable ponding depth of 12 inches. The facility was sized using the stormwater Surface Filtration/Infiltration Facility Sizing Spreadsheet found in the ESDM which is attached for reference. Infiltration testing performed on the site revealed a high infiltration rate of 44 inches per hour, however in accordance with the facility sizing spreadsheet instructions a conservative value of 2.5 inches per hour was used to size the facility. During the flow control storm event the facility reaches a maximum ponding depth of 10.8 inches which is contained within the footprint of the infiltration area. m -mi Nnvamhor[ 9mn Stormwater Surface Filtration9nfiltration Facility Sizing Spreadsheet 24 Hour Storm, NRCS Type 1A Rainfall Distribution City of Eugene North Lake P.M. Storage Facility Date: a1T, 4155 E Street Permit Number.';NFA, Springfield OR Catchword ID: Site MDS Johnson Broderick Engineers Complete this fame for each drainage catchment in the project site Thal is to be sized per the Presumptive Approach. Provide s distinctive Catchment ID for each facility cowdim itcd with the site basin map to comelate the appropriate calculations with the facility. The maximum drainage ca chmew to he modeled per the Presumptive Approach is 1 acre (43,580 SF) For infilimticn facilities in Class A or 6 soils whore no infiltration testing has been perFmmed use an infiltration rate of 0.5'nihr. For all feelibes use a maximum soil mliliration note of 2.5 in/hr for topsoil/growing medium_ loose "Yes" from ghe dmpdown boxes below next to the design standards sequimmente, for this facility. Pollution Reduction (PR) Yes Flow Control (FC) No Destination (DT) r_Y-;­IAI lMltrobn faulty must se chosen as the ra,eny Ewe to meet m:r apn Mqueereents Total Square Footage Impeorious Area- 13892 scift Impervious Area CN -1 98 Total Square Footage of Pre -Development Total Square Footage Pervious Area= 8759 salt Pervious Area cN=J 85 Time of Concentration Post Developmon O- min Time Tested Soil Infiltration Rate=®inlhr(am Note 4) Destination Design=inMr Design Soil Infiltration Rate= 2 5 Whir Soil Infiltration Rate [Raqui.nt Rainfall Depth Desi n Storm Pollution Raductinn 14 inches Water Quar Flow Con[rol 36 inches Flootl Control Destination 1 3 6 inches IFIcind Control Surface Widl Surface Lengl Facility Side Slope Max. Ponding Depth in Storm eater Facility= Depth of Growing Medium (Sol 101612020-9'.33 AM Facility Surface Facility Bottom P Basin Ratio of Facility Area Peak Flow Rate to Stounwater Facility= 0.10Y ets Peak Facility Overflow Rate-F-0 000 cfs Total Runoff Volume [o S[onnwater� =Of Faulity 1464 cf Total Overflew Volume=cf Max. Depth of starmwater, in Facility- 03 in Drawdown Timms 0 2 hours Yes Facility Sizing Meets Pollution Reduction Standards? YES Meets Requlmment of No Facility Flooding? VES Meets Requiramentfor Maximum of 18 Hour Drawdown Time? Flow Contml alculation Results Peak Flow Rate m Stormwamr, Facility= 0.423 cls Peak Facility Overflow Rate- 0.000 cfs Total Runoff Volume to slormwate Facility= 5327 ff Total Overflew Velums= 0 of Peak OR fte Flow Ra Max. Depth of Stormwaterin Facility= 70.8 in Filtration Facility Undardrafn= NV,cfs Drawtlawn Tim¢- 0.8 hours Pre-Developmeyd Runoff Data Peak Flow Rate - 0.271 cls Total R ... ffV.1u..=l 3971 cf NW Facility Sizing Meets Flow Control Standards? NV. Meets Requimmentfor Post D¢velnpment offsite Flow less or equal to Pre-Development Flow? NV. Meets Requirement for Maximum of 18 Hour Drawdown Time? estmahon- alcula0on Results Peak Flow Rabe to Stormwater Facility = 0.423 cfe Peak Facility Overflow Rale- 0.000 cis Total Runoff Volume to Stormwater Fadlity=Acf Total Overflow Voluma= 0 ct Max. Depth of Stormwater In Facility=in Dmwtlown Time=hours Yes Facility Sizing Meets Destination Standards? YES Meets Requimmmd of Ne Facility Flooding? VES ifileets, Requirement for Maximum of30 hour Dsmadawn Time? 101612020-933 AM