HomeMy WebLinkAboutPermit Building 1992-07-09SPR IE,LI)l
RESIDENTIAL
PERMIT APPLICATION
lnspections:726'3769
Office: 720'3759
/?
?fr,
JOB NUMBER
225 Fifth Street
Springf ield, Oregon 97477
LOCATION OF PROPOSED WORK:=,. -FcanrIs r-l
2&
ASSESSORS MAP .o1 ,a7'3 ,lEb TAX LOT:
BLOCK:SUBDIVISION
OWNER:(at
-tr q
&=.*612G,*3
"7
ADDRESS
;, zlPSrArE: --49= -CI]'Y:
_a?G;PHONE
W
/AfttNDESCNIBE WORK:
ADDITION DEMOLISH OTHERNEW -X,- REMoDEL --
- '
PLUMBING: -,,
MECHANICAL:
EXPIRES PHONEADDRESSCONTRACTOR'S NAME
ELECTRICAL:
CONST.
CONTRACTOR #
reil^__
n.or.or* ce, Er=r Lfu<
RANGE:
I
WATET1 HEATEFI
"'ff (T -
FLOOD PLAIN
ZONING CODE:
# OF BDRMS
OUAD AREA:
CONSTR. TYPE
* OF UNITS:
'LAND USE:
SECONDARY HEAT:
SQUARE FOOTAGE:
r OF BLDGS: -
OCCY GFIOUP:
I OF STOBIES:
To request an inspection, you must call 726-376g. This is a24nour recording. All inspections requested before 7:00 a.m. will be
macle the same worl<ing day, ilspections requested after 7:00 a.m. will be rnade the {ollowing work day'
REQU!RED INSPECTIONS
,("*'orgrY'.Electric
Vf Sitc lnsnection - To lrc matle
.6Lafter cxcavirtion, but prior tcr-sett
r n o {ornts. =,trAr@-S;
K:;Wl Mechanicar - Prior to
-F7f Rouoh Electrical - Prior tc)
,lA\.or.-r.
\M Electrical Service - Must tle
,/Aapproved to obtain Permanent
electrical Power.
Final Plumbing - When all
plurnbing worl( is comPlete.
Final Electrical - When ;rll
electrical work is cot-nPlete.
Final Mechanical - When all
mechanical worl( is complete.
Final Building - When all
required inspections have becn
approved an<i builcling is
completed.
E
X
X
,Kx
Vf Masonrv - Steel location, bondALb"u,rl", grouting. Ee nAxt.
Underslab Plumbing/ Electrical /
Mechanical - Prior to cover.
Footing - After trenches are
excavated.
Foundation - After forms are
erectecl but Prior to concrete
placement.
Underground Plumbing - Prior
to lillirrg trench.
Posl and Beam - Prior to floor
insulalion or dccl<itrg.
Xrramlng - Prior to cover.
XTwuttlceiling lnsulation - Prior to
Jacover.
ft"*dl - Prior to taoing'
Fireplace - Prior to facing
materials and framing lnsP.
Wood Slove - Aftcr ins;tall;ttion
lnsert - After f ireplace apl)roval
an(l installation c;f unit.
Curbcut & APProach - Af ter
forrns are erected but Prior to
placement of concrete.
Sidewalk & DrivewaY - Af ter
excavation is comPlete, fortns
and sub-base material in Place.
Fence - When comPleted
reet Trees - When all required
rees are planted.
V u,.,au.tt 4{r5Gi]E / M ec hanica I
;lr-4 - l)rior iii insttlatiotr or (lccl(lnU.
><
{::'."-l;;suration - Prior to
[Zsanitary Sewer - Prior to filling
,JA{ trench.
{::""'*.sewer
- Prior,to rirlins
]a/ wut", Line - Prior to filling
/A\rencn
i\7 nougt, Plumbing'- Prior to
F{ covet.
Other
MOBILE HOME INSPECTIONS
Blocking arrcl Sct-Up - Wltctl i.tll
blocl<ing is cornl)lcte.
Plumbing Contrectiorrs - Wlten
lrorne ltas been connectecl to
water and sewer.
Electrical Conneclion - When
blocking, set-uP, and Plurnbi ng
inspections have been aPProvcd
and the home is connected to
the service panel.
Final - After all required
inspections are approved and
porches, skirting, decks, and
venting have been installed.
LI
tl
rl
r r
Lot faccs
Lot sq. itg. "
Lot coverage
Topography
Total height
Lot Type
-E-frGrior
--- Corner
-
Panhandle
-
Cul-de-sac
Setbacks
4e4
46-?'
6az%
.ah-'t
S THE PROPOSED WORK IN THE
I-IISTORICAL DISTRICT, OR ON
I'FI E HISTORICAI. REGISTER? ---"...,
lf yes, this application rnust be signed
anrJ approved by tl-re H i storical
Coordinator prior to permit issuance.
APPROVED:
P.L.HSE ffi 'ACc
N //G,
S S'
E,
BUILDING VALUE, PLAN CHECK
AND BUILDING PERMIT
This permit is granted on the express conditiorr that the said
construction shall, in all respects, conform to the Ordinance
aclopted by the City of Springfield, irrcluding the
Developmerrt Codc, regltrlating thc construction and r,rse of
buildings, and may bc suspended or revoked at arry time
upon violation of arry provisions of said orclinatrt:cs.
Z_
/€
/z 77
P
Plan Clreck l=ee:
Rccei vcd
Rt-.vi
Date Paicj
Rcceipt Nutrtbet':
BUILDING PERMIT
VALUE
prut"s
(A)
,/o
€aZ,
,*J..f
fu,Za-
?/22_
/6,%A
SO. FT. X $/SO, FT.
li#- *^zq-
38-z
7za/aa
Total Value
tsuildirrg Pcrtrtit [-cc
State Surcharge
Total Fcc
'1sr,CP@
ITEM
Main
Garage
//:fo,?:
Systems Developtnerrt Ctlarge is due on all undevelopcd
properties within the City limits which are being improved.
SYSTEMS DEVELOPMENT CHARGE (SDC)
(B) 468-
ADDITIONAL COMMENTS
htz b,/b@
ITEM
Fix t u res
Residential Bath(s)
Sanitary Sewer
Water
Storm Sewer
Mobile Home
FEE
/5*
/Q?"
2/7,e?
9oNo?
FT.
FT.
(c)
2o a.;o
Fr. /eo
PLUMBING PERMIT
Plumbing Permit
State SurcharSle
Total Clt:rrge
Wood Stove/ lnsert / Fi replace Unit
Dryer Vent
MECHANICAL PERMIT
3,e?_
/5:e
/o eo
7s
25.75
€ro3
(D)
4E:
Mechanical Permit
lssuance
State Surcharge
Total Permit
Fu rnace
Exhaust Hoocj
Vent Fan No/
By signature, I state arrd agree, that I have caref ully examined
the completed application and do hereby certify that all
information hereon is true and correct, and I f urthe r certif y
that any and all work per{ormed shall be done in accordance
with the Orcjinances of the City of Springf ield, and the Laws
of the State of Oregon perlaining to the worl< described.
lrerein, ar.rd that'NO OCQUPANCY will be rnade of .any
structure without pernlission of the Building Safety Division'
I {urther certify that only contractors and enrployees who
are in compliance wittl ORS 701.O55 will be used on this
project.
I further agree to ensure that all required inspections are
requested at the proper tinre, that
Signatu re
Date
IS ocatcrJ at the f rontfrom the street, that tlte rmit
ti sdu
address is readable
d tlreof the prope
co orlon the site
plan s vu il I re rriai nMISCELLAN EOUS PERMITS
Mobile Home
State lssuance
State Surcharge
Sidewalk --------- ft
Curbcut --- ft
Demolition
State Surcharg;e
Total Miscellancous Permits (E)
a7
DATE PAID
VALIDATION:
RECEIPT NUMBEI.I .,
AMOUNT RECEIVED
RECEIVED BY -- -
TOTAL AMOUNT DUE (exclucling electrical)
(A, B, C, D, and E Combined)
Mt,tJ,
*=
C'TY OFEGO'U
st.tilNGFrEL()
0fr
1 ON
Permits are non-transferable and expireif vork is not started within 180 daysof issuance or if vork is suspended for
180 days.
2. Co!{I"+ACf,oR INSTALLATToN oNLY
PERHIT APPLICATION
PEE SCEEDULE BBLOV
Residential-Single or
dvelling unit.
Service fncluded:
I tems .Cos t
I
1000 sq.ft. or less I $ 85.00
nach additional 500
sq. ft or portion nthereof cr $ 15.00
Each Manuf'd Home or
Modular DweIIing
Service or Feeder $ 40.00
Services or Feeders
Installation, Alterations or
Relocation:
225 FIFTB STRBEf,
SPRINGFIEI.D, OREGON
INSPBCf,ION REQTIEST:
0FPICE: 726-3759
ci Sot^t r{\
Supervisor
974
72
-l-, ,\ 11,.,i,:r,ri, UiOlfa
i-:z,e$.i,ind 6ross i5i
ELECTRICAL
si Submi(tnci has lhe tollowlng
roquire rpooifio Hnt{$ey Job Number qa w
Sum
3D
B
O+SElectrical Contractor
Address
Y;;. Ndmber t(frtps
200 amps or less
201 amps to 400 amps
-401 amps to 600 amps _601 amps to 1000 amps_
0ver 1000 amps/volts
Reconnect Only
Phone
s s0.00
$ 60.00
$100.00
$130. 00
$300.00
$ 40.00
Expiration Date O,t,qA
Constr Contr. Number D3%q
Expiration Date 4.\q
Signature of Supervising Blectrician
Ovners Name
Address
Ci ty F,ra( nO pr,on#
()
OITNER INSTALI,ATION
The installation is being made on
property I ovn vhich is not intended
for sale, lease or rent.
Ovners Signature:
DATE:
C. Temporary Serviees or Feeders
Installation, Alteration or Relocation
200 amps or less I S 40.00
201 amps to 4oo amps
.-- $ 55.00
over 401 to 6oo amps
-
g 8o.oo
Over 600 amps or 1000 volts see fiBrl above
D. Branch Circuits
Nev, Alteratlon or Extension Per Pane1
One Circuit $ 35.00
Each Additional
Circuit or vith Service
or Feeder Permit S 2.00
E. Miscellaneous (Service/feeder not included)
-Each installation
Pump or irrigation
Sign/0utline Lighting-
Limited Energy/Res
Limited Energy/Comm
-5. STETOTAL OP ABOVB
5Z State Surcharge
TOTAL
$ 40.00
s 40.00
s 20.00
s 36.00
RECEIVED BY:
SPrlINGFIELC'
RESIDENTIAL
PERMIT APPLICATION
lnspections: 726'3769
Olfice: 726-3759
LOCATION OF PROPOSED WORK:Zzl
JOB NUMBER
225 Flfth Street
Spri ngfield, Oregon 97 477
TAX LOT:Za-?9 D
Zfr,
I
l*OZD
LOT:BLOCK SUBDIVISION
PHO NE:4as 265\OWNER:
ADDRESS
CONTRACTOR'S NAME
@w17- 0"16
,'X ZIP:CITY:STATE:
DESCRIBE WORK:
NEW - L--REMoDEL ADDtrtoN DEMoLlsl-l orHER
ADDRESS
CONST.
CONTBACTOR #EXPIRES PHONE
G F.N ERAI-:
PLUMBING:
MECFIANICAI.
ELECTRICAL
OUAD AREA:
_ OFFICE USE _
Rough Electrical * Prior to
COVCT,
Electrical Service - Must be
approved to obtain permane
electrical power.
Firepl to
no N
FLOOD PLA|N
ZONING CODE:
# OF BDRMS
Final Electrical - When all
electrical is complete.
.- When all
complete.
Site lnspection - To be made
af ter excavation, but prior to
setting forms.
Underslab Plumbing/ Eleclrical /
Mechanical - Prior to cover.
Footing - After trenches are
excavated.
Masonry - Steel location, bond
beams, grouting.
Foundation - After
ere6ted but prior
placement.
Underground Plumbing - Prior
to filling trench.
Underf loor Plumbing / Mechanical
- Prior to insulation or decking.
Post and Beam - Prior to floor
insulation or decki ng.
Floor lnsulation - Prior to
decki ng.
Sanitary Sewer - Prior to fiiling
trench.
Storm Sewer - Prior to fiiling
trench.
Waler Line - Prior to filling
trench.
LAND USE
# OF BLDGS Y OF UNITS:
OCCY GROUP:
S OF STORIES:
CONSTR. TYPE:
HEAT SOURCE:
WATE,q HEATF:R:RANGE
SECONDABY HEAT:
SQUARE FOOTAGE:
To request an inspection, you must call 726-3769. This is a 24 hour recorCing. All inspections requested before 7:00 a.m' will be
made the same working day. !nspections requested after 7:00 a.m. will be maCe the following work day.
REOUIRED INSPECTIONS
Temporary Electric Rough Mechanical - Prior to
cover.
Final Plumbing - When all
plumbing work is complete.
c
iling lnsulation - Prior to
cover.
Drywall - Prior to taping
Wood Stove - After installation
lnsert - After firepiace approval
and installation of !init.
Curbcut & Approach - After
forms are erected but prior to
placement or concrete.
Sidewalk & Driveway - After
excavation is complete, fornrs
and sub-base nr.lt,)rial in place.
Fence - When cornpleled.
Slreet Trees - When all required
trees a!'e planted.
Building - When all
required inspections have been
approved and building is
completed.
Other
MOBILE HOME INSPE TIONS
Blocking and Set-Up - When all
blocking is complete.
Plumbing Connections - When
home has been connected to
water and sewer.
Electrical Connection - When
blocking, set-up, and plumbing
inspections have been approved
and the home is connected to
the service panel.
Final - After all required
inspections are approved andporches, skirting, decks, and
venting have been installed.
r.
Rough Plumbing - Prior to
cover.
ASSESSORS MAP:
E
E
tl
r
E
n
E
E
E
E
E
tl
tl
r
()/'P
t
tf
Lot faces
Lot sq. ftg.
Lot coverage
Topography
Total height
Lot Type
-
lnterior
-
Corner
-
Panhandle
-
Cul-de-sac
Set bacl<s
HSE GAR ACC
lS r r;e PROPOSED WOFIK lN THE
}IiSTOHICAL DISTRICT, OR ON
THE HISTORICAL REGISTER?
-
lf ycs, this application must be signed
and approved by the Historical
Coordinator prior to permit issuance.
APPROVEDE
P.L.
N
S
VALUE
(A)
X $/SQ. FT.
Total Value
Building Permit Fee
State Surcharge
Total Fee
BUILDING PERMIT
ITEM SQ. FT.
Main
Garage
Carport
BUILDING VALUE, PLAN CHECK
AND BUILDING PERMIT
This permil is granted on the express condition that the said
construction shall, in all respects, conform to the Ordinance
adopted by the City of Springfield, including the
Development Code, regulating the construction and use of
buildings, and may be suspended or revoked at any time
upon violation of any provisions of.said ordinances.
Pran check r.., -/LK-L e62D : &€) e
2-26,-7 3
Pla iewed B Date
Date Paid
Rcceipt Numbcr: -
Received
SYSTEMS DEVELOPMENT CHARGE (SDC)
(B)
Systems Developrnent Charge is due on all undeveloped
properties within the City limits which are being improved.
ADDITIONAL COMMENTS
ITEM
Fixtures
Residential Bath(s)
Sanitary Sewer
Water
Storm Sewer
Mobile Home
FEE
(c)
FT.
No
FT.
FT.
PLUMBING PERMIT
Plumbing Permit
State Surcharge
Total Charge
Wood Stove/ lnsert/ Fireplace Unit
Dryer Vent
(D)
N0Vent Fan
Mechanical Permit
lssuance
State Surcharge
Total Permit
MECHANICAL PERMIT
Furnace
Exhaust Hood By signature, I state and agree, that I have caref ully examined
the completed application and do hereby certify that all
information hereon is true and correct, and I further certify
that any and all work performed shall be done in accordance
with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described
herein, and that NO OCCUPANCY will be made of any
structure without permission of the Building Safety Division.
I further certity that only contractors and employees who
are in compliance with ORS 701.055 will be used on this
proiect.
I f urther agree to ensure that all required inspections are
\
Date 5
requested at the proper time,at each address is readable
f rom the 51 et, that e per
,andt app
ri
Kisnutu,.u
is located at the f ront
of the p
on the sit I times
set of plans will remain
nstruction.
MISCELLANEOUS PERMITS
Mobile Home
State lssuance
State Surcharge
Sidewalk
-
ft
Curbcut
-
ft
Demolition
State Surcharge
Total Miscellaneous Permits (E)
@?o ?3se
3lv )., t4 8oo
RECEIVED BY
i
tr)B
AMOUNT RECEIVED.
DATE PAID
-,.
VALI DATION:
RECEIPT NUMBER
TOTAL AMOUNT DUE (excluding electrical)
(A, B, q D, and E Combined)
EEE
___J
Address:
Permit No:Qto )qq
nd
>L!%
WHITE COPY TO ISSUING AGENCY PERMIT FILE
PINK COPY TO APPLICANT
1
2
lssued by IDR
OR OFFICE USE ONLY
STATEMENT:
TNFORMATION NOTICE TO PROPERTY OWNERS
ABOUT CONSTRUCTION RESPONSIBILITIES
Note: Oregon Law, ORS701.055(4), requires residential construction permit
applicants who are not registered with the Construction Contractors Board to
sign the following statement before the building permit can be issued. This state-
ment is required for residential building, electrical, mechanical, and plumbing
permits. Licensed Architect and Engineer applicants, exempt from registration
underORS 701.010(7), need not submit this statement. This statement will be
filed with the permit.
Fill in the applicable blanks, and initial boxes 1 and 2, and either box 3A or 38:
I own, reside in, or will reside in the completed structure.
I understand that I must register as a construction contractor if the structure is sold
or offered for sale before or upon completion.
Contractor registration num
I will instruct my general contractor that all subcontractors who work on the struc-
ture must be registered with the Construction Contractors Board.
OR
3. B.l X I I will be my own general contractor.
lf I hire subcontractors, I will hire only subcontractors registered with the Construc-
tion Contractors Board. lf I change my mind and do hire a general contractor, I will
contract with a contractor who is registered with the Construction Contractors Board
and I will immediately notify the office lssuing this building permit of the name of
the contractor.
! hereby certily that o ation is correct and that I have read and understand
the ln N to ners about Construction Responsibilities on the
reverse this
3l u,l* t
natu of mit lican Date
CONSTRUCTION CONTRACTORS BOARD
0244J 8191
Date: