HomeMy WebLinkAboutApplication APPLICANT 9/28/2020City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Development Issues Meeting (DIM)
SPRINGFIELD
W 0#1
Required Project Information (Applicant: complete this section)
Prospective
Applicant Name: Steven Yett Phone: 541-344-6781
Company: Two Cent Piece, LLC Fax:
Address: PO Box 26125, Eugene, OR 97402
Prospective
Applicant's Rep.: James Robertson
Phone: 541-342-8077
Company: Robertson Sherwood Architects pc I
Fax:
Address: 132 East Broadway - Suite 540, Eugene, Oregon 97401
Property Owner: Two Cent Piece, LLC
Phone:
Company:
Fax:
Address: PO Box 26125, Eugene, OR 97402
ASSESSOR'S MAP NO: 17031533
TAX LOT NOS : 1100
Property Address: 3636 East Game Farm Rd, Springfield, Oregon
Size of Property: 0.54 Acres ❑X Square Feet ❑
Description of If you are filling in this form by hand, please attach your proposal description to this application.
Proposal: New 3,200 SF Restaurant with interior and outdoor seating; double drive-thru service
Existing Use: Drive-thru coffee store
# of Lots Parcels: 1
Avg. Lot Parcel Size: sf
Densit : du/acre
Prospective
Applicant: James M Robertsow-Ts—"= 9/10/2020
Date:
Signature
James Robertson
Print
Case No.: Date: Reviewed by:
Application Fee: $
Technical Fee: 0
Posta a Fee: 0
TOTAL FEES: $ PROJECT NUMBER:
Revised 5/21/13 KL 1 of 3
Development Issues Meeting Process
The purpose of a Development Issues Meeting is to give an applicant the opportunity to discuss
his/her development proposal with the development review staff of the City. The discussion can
be general or specific, depending on the details provided with the application. A Development
Issues Meeting provides information to an applicant related to the current development
conditions and standards of the City. The Development Issues Meeting is not a land use decision
and does not confer any development rights, establish any conditions, or bind the applicant or
the City to any course of action. The meeting conveys the status of known development
opportunities and constraints. The status may change over time as development conditions or
standards change.
1. Applicant Submits a Development Issues Meeting Application
• The application must conform to the Development Issues Meeting Submittal
Requirements Checklist on page 3 of this application packet.
• Development issues meetings are conducted every Thursday.
• We strive to conduct the development issues meetings within three to four weeks of
receiving the application.
• The applicant's proposal is circulated to the relevant staff in preparation for the
meeting.
2. Applicant and the City Conduct the Development Issues Meeting
• The applicant and any design team should attend the development issues meeting.
• The meeting is scheduled for one hour.
• Staff attending the meeting will be prepared to discuss the issues raised in the
submittal by the applicant. Other issues raised during the meeting may also be
discussed.
• The meeting is informal and the City will issue no staff report.
Revised 5/21/13 KL 2 of 3
Development Issues Meeting Submittal Requirements Checklist
® Application Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development & Public
Works Department. The applicable application, technology, and postage fees are collected
at the time of complete application submittal.
® Development Issues Meeting Application Form
❑X Five (5) Questions - list specific questions the applicant would like staff to answer
during the meeting. So that each question may be fully evaluated, the list is limited to five
questions.
❑X Four (4) Copies of the Proposed Plan - suggested information valuable for staff to
review the proposal is listed below. It is not necessary to include all of these items on
the site or plot plan. However, applicants are encouraged to address as many as possible
given that the level of information that will be derived from the meeting is commensurate
with the level of detail provided in the application.
Applicants are also encouraged to include additional information on the plan as listed in
the Springfield Development Code (SDC) 5.12-120, Land Divisions - Partitions &
Subdivisions - Tentative Plan Submittal Requirements or 5.17-120, Site Plan Review
Submittal Requirements.
❑X Drawn in ink on quality paper no smaller than 11" x 17"
X❑ Scale appropriate to the area involved and sufficient to show detail of the plan and
related data, such as 1" = 30', 1" = 50' or 1" = 100'
® North arrow
X1 Date of preparation
❑X Street address and assessor's map and tax lot number
❑X Dimensions (in feet) and size (either square feet or acres) of the development area
❑ Location and size of existing and proposed utilities, including connection points
❑ On-site drainage collection system and flow patterns, the size and location of drain
lines and catch basins, dry wells, and natural drainageways to be retained
❑ Area and dimensions of all property to be conveyed, dedicated, or reserved for
common open spaces
DIMs Related to Land Divisions
❑ Approximate location, number and dimensions of proposed lots
❑ How streets in the proposal area connect with existing streets
DIMs Related to Site Plan Review
❑ Proposed and existing buildings: location, dimensions, size (gross floor area),
setbacks from property lines, distance between buildings, and height
❑ Area and percentage of the site proposed for buildings, structures, driveways,
sidewalks, patios and other impervious surfaces
❑ Parking and circulation plan
Revised 5/21/13 KL 3 of 3
Development Issues Meeting for:
Toxic Wings
3636 East Game Farm Road
Springfield, Oregon 97477
24 September 2020
Applicant/Property Owner Applicant's Rep/Architect
Two Cent Piece, LLC Robertson/Sherwood/Architects pc
P.O. Box 26125 132 E. Broadway, Suite 540
Eugene, Oregon 97402 Eugene, OR 97401
Attn: Steven Ye@ Attn: James Robertson, FAIA
Phone: 541-344-6781 Phone: 541-342-8077
Assessor's Map No: 170315sc3300800.
Tax Lot No: 800.
Property Address: 1075 International Way, Springfield, Oregon 97477.
Size of Property: 1.96+/- acre
Description of Proposal:
This proposal is for construction of a one story, 3,284 SF double-drive-thru food service building to be
located at 3636 East Game Farm Road. The project includes two drive-thru service lanes, outdoor
seating and limited indoor seating. Site improvements include modifications to existing drive-thru lanes,
existing parking spaces, and associated planters and storm treatment areas. See attached Proposed Site
Plan which includes the preliminary floor plan.
Existing Use:
The site has most recently had a double drive-thru coffee kiosk. The site already has parking areas and
access drives. There are several easements and joint use agreements associated with the site and
adjacent development.
Easements:
See the attached Special Exception Map, prepared by Goebel Engineering & Surveying, attached to this
application.
Proposed Development Site Data:
Total Site Area: 23,471 SF
Imoervious Area
Building Footprint 3,284 SF (Enclosed plus 650 SF of covered outdoor seating)
Hardscape 17.777 SF
Total Impervious Area 21,061 SF
Pervious Area
Total Pervious Area 2,410 SF (Planters/Storm Water Management)
Questions:
—For the double drive-thru with limited indoor seating, the code requires 1 space for each 100 SF
of gross area. The proposed enclosed building is 2,634 SF and there is an additional 650 SF of
unenclosed outdoor seating. Using the enclosed area only, the required parking would be 27
spaces. If the covered seating is included the requirement would be 33 spaces total. We are
proposing to provide 29 spaces, a reduction of 4 spaces using the code provisions of SDC
Section 4.6-100, H. to reduce required parking by providing additional bike parking. The code
Toxic Wings Page 1
Development Issues Meeting Robertson/Sherwood/Architects pc
allows reduction of 1 car space per two additional bike spaces. The required number of bike
spaces is 3,284 / 600 = 6 spaces. We will provide 8 additional bike spaces which reduces the
parking by 4 spaces. The resulting minimum vehicle parking is 33 —4 = 29 spaces. Bike parking =
6 (code minimum) + 8 additional = 14 total. The reduction is 14 percent of the required amount
which is within the 20 percent allowable reduction.
There is an existing access easement with the adjacent bank property. According to tax records,
the bank is 6,422 SF and has 31 parking spaces on site. With the agreement they also have
access to the existing 17 spaces along the adjoining property line. Combined the bank has
access to 48 spaces. Code requires a bank to have a minimum of 1 space for each 300 SF or 22
spaces total.
Please confirm that the planned 29 vehicle parking spaces and 14 bike parking spaces meet the
minimum code requirements for the proposed development.
2. Identify any storm drainage issues related to this site. There would be approximately 10.3 percent
of the site devoted to panting and storm water management.
3. Identify any issues related to site access to Game Farm Road and/or Gateway Street.
4. Please clarify the DWP requirements applicable to this site.
5. Please confirm if a 50 -foot -tall sign is permitted to be installed onsite with appropriate sign
permits.
Toxic Wings Page 2
Development Issues Meeting Robertson/Sherwood/Architects pc