HomeMy WebLinkAboutApplication APPLICANT 9/22/2020City of Springfield SPRINGFIELD
Development & Public Works
225 Fifth Street L
Springfield, OR 97477
Accessory Dwelling Unit (ADU) - Type I
Project Information
ApplicantName: UV —J '04 -Z
(Applicant., complete this section)
. r Phone: 5(% -.5 6 -VI )
Company if applicable):
Email: Lf ftr-)PY J {"1w,
Mailing Address:
I '
J ,'jugs(
Applicant's Rep.:
Phone: J Z 1
Company:p
Email:
Mailing Address:
Pro a Owner: .Cao 'e- a_.0
"a4d-
Phone: SC_ �
Com an
Email:
Address:
ASSESSOR'S MAP NO: O
TAX LOT NO S : 600
Property Address:`N" a.Jy
' o
_ ®e -
Size of Property:
.13 Acres square Feet ❑
Type of ADU: Xconversion of part of house (describe existing use) '}fit .`gym 200
(check one) _Conversion of accessory structure (describe existing use)
Addition to house _New detached dwelling
Zoning of Property: _Low Density Medium Density _High Density Residential
Si natures: Please sin and print your name and date in thea QrWriate box on the next nAnp.
Required Property Information (City Intake Staff., complete this section)
Associated Cases:
/� �1
Case No.: l 1 _) 1 l ry� /
Date: 1�7 l
Reviewed b: I,,
Application Fee: 1 G
TechnicalLN3
osta a Fee: O
TOTAL FEES: v O ._�0
PROJECT NUMBER:
Revised April 3, 2018 Sandy Belson page 1 of
Signatures
The dildersigned acknowledges that the information in this application is correct and accurate.
Date:
Signat
LarsaL T +z l e r
Print
If the applicant is not the owner, the owner hereby grants permission for the applicant to act in his/her behalf.
Owner:
Date:
Signature
Print
Revised April 3, 2018 Sandy Belson page 2 of 4
Accessory Dwelling Unit Application Process
1. Applicant Submits an Accessory Dwelling Unit Application to the Development
Services Department
The application must conform to the Accessory Dwelling Unit Submittal
Requirements Checklist on page 4 of this application packet.
Planning Division staff screen the submittal at the front counter to determine
whether all required items listed in the Accessory Dwelling Unit Submittal
Requirements Checklist have been submitted.
Applications missing required items will not be accepted for submittal
2. City Staff Conduct Detailed Completeness Check
Planning Division staff conducts a detailed completeness check within 30 days of
submittal.
The assigned Planner notifies the applicant in writing regarding the completeness of
the application.
An application is not be deemed technically complete until all information necessary
to evaluate the proposed development, its impacts, and its compliance with the
provisions of the Springfield Development Code and other applicable codes and
statutes have been provided.
Incomplete applications, as well as insufficient or unclear data, will delay the
application review process and may result in denial.
3. City Staff Review the Application and Issue a Decision
This is a Type I decision and thus is made without public notice and without a public
hearing since there are clear and objective approval criteria and/or development
standards that do not require the use of discretion.
Decisions address all the applicable approval criteria and/or development standards.
Applications may be approved, approved with conditions, or denied.
The City mails the applicant and property owner the decision, which is effective on
the day it is mailed.
The decision issued is the final decision of the City and may not be appealed.
Revised April 3, 2018 Sandy Belson page of
Accessory Dwelling Unit Submittal Requirements Checklist
NOTES ffyou-feel-arn'tem does not apply, please state the reason why and attach the
explanation to this form.
❑ Application Fee - refer to the Development Code Fee Schedule for the appropriate
fee calculation formula. A copy of the fee schedule is available at the Development
& Public Works Department. The applicable application, technology, and postage
fees are collected at the time of complete application submittal.
❑ Accessory Dwelling Unit Application Form
❑ Narrative explaining the proposal and any additional information that may have a bearing
in determining the action to be taken, including findings demonstrating compliance with
the Accessory Dwelling Unit Development and Design Standards described in SDC 5.5-125
and 5.5-130.
❑ Three (3) Copies of a Plot Plan Including the Following:
The scale appropriate to the area involved and sufficient to show detail of the plan and
related data, such as 1" = 30', 1" = 50' or 1" = 100', north arrow, and date of
preparation
�f Property lines including dimensions and size of the property
Name and location of abutting street(s) and alley(s)
Proposed accessory dwelling unit and its relation to the primary dwelling, showing
location, dimensions, height, setbacks from property lines, and entrance locations
Existing and proposed structures, fences, walls, including required outdoor storage and
garbage areas; showing location, dimensions, and setbacks from property lines
Percentage of the lot covered by existing and proposed structures
fr
Location of utilities and meters etr�cr_d �'��
- k6t-w as
Location of existing driveways, curb -cuts and required ff-street parking areas
Location of existing sidewalks and walkways and required pedestrian wa way
'( Existing and proposed trees and landscaping
❑ Three (3) Copies of a Detailed Floor Plan of the ADU, drawn to scale with labels on
rooms indicating proposed uses
❑ Three (3) Copies of an Elevation Drawing of the ADU Including the Following:
[� Exterior finish materials
Roof pitch
Window placement and sizes
[ Window and door trim
pr] Dimensions of eaves
f Height of accessory dwelling
Revised April 3, 2018 Sandy Belson page 4 of 4