Pre -Submittal (Site Plan Review) #811 -20 -000158 -PRE PR316-00012 Willa nalane
Assessor's Map and TL: 17-02-35-00 3500, 3602 3604; 18021000 100;
18020200 100, 400, 401; 18-02-03-00 600, 602; 18-02-09-00 100
Address: 7575 McKenzie Hwy
Existing Use: THNA Trailhead
Applicant has submitted plans for 6.3 miles of new trails.
Planner: Andy Limbird
Meeting: Tuesday, September 22, 202011:00— 12:00 via GoToMeeting
VICINITY MAP
811 -20 -000158 -PRE PreSubmittal Meeting
17-02-35-00 3500, 3602 3604; 18021000 100; 18020200 100, 400, 401;
18-02-03-00 600,602; 18-02-09-00 100
7575 McKenzie Hwy
Willamalane Park & Recreation District
City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Site Plan Review
SPNINOFI�
Application Type (Applicant: check on
-
Site Plan Review Pre -Submittal: Ma"or Site Plan Modification Pre -Submittal:
❑
Site Plan Review Submittal: ❑ Ma"or Site Plan Modification Submittal:
Required Project Information (Applicant., complete t�L�
Applicant Name: willamalane Park and Recreation District Phone• 541-7364051
•fraserm@willamalane.org
❑
Company:
Email:
Address: 250 S. 32nd St., Springfield, OR 97478
Applicant's Rep.: .:
Phone:
Company:
Email:
Address:
Property Owner: Willamalane Park and Recreation District
Phone: 541-736-4051
Company:
Email: fraserm@willamalane.org
Address: 250 S 32nd St., Springfield, OR 97478
ASSESSOR'S MAP NO: See Attachment 1
TAX LOT NOS : See Attachment 1
Property Address: 7575 McKenzie Highway, Springfield, OR 97478
Size of Property: 665 Acres ® Square Feet ❑
Proposed No. of
I Dwelr aue: N/A
Proposed Name of Project: Thurston Hills Natural Area -Phase II trail project
Description of if you are filling in this form by hand, please attach your proposal description to this application.
Proposal: See Attachment 1
Existing Use: WiIlamalane Natural Area Park
New Impervious Surface Coverage (Including Bldg. Gross Floor Area): N/A
sf
Si natures: Please si nand riot our name and date in the appropriate
Required Project Information (City Intake Staff.
Associated Applications:
box on the next
complete this sectiox
Signs:
paqe.
/ ``
Pre -Sub Case No.:a11 )0_/ 1 J
V
/J �/ ,r
l �V
Reviewed by: lir lP l(t
C
Case No.:
Date:
Reviewed by:
{
Application Fee: l
Technical Fee: $ Posta a Fee: $
' l�l)�f JV)V
TOTALFEES:$ `�(f�``�" I PR03ECT NUMBER:
Revised 1/7/14 KL 1 of 11
Owner Signatures
This application form is used for both the required pre -submittal meeting and subsequent
complete application submittal. Owner signatures are required at both stages in the application
process.
An application without the Owner's original signature will not be accepted.
The undersigned acknowledges that the information in this application is correct and
accurate for scheduling of the Pre- Submittal Meeting. If the applicant is not the
owner, the owner hereby grants permission for the applicant to act in his/her behalf.
I/we do hereby acknowledge that I/we are legally responsible for all statutory
timelines, information, requests and requirements conveyed to my representative.
c�,aa-�-hww Date: 91112ce,
Signature
1 represent this application to be complete for submittal to the City. Consistent with the completeness check
performed on this application at the Pre -Submittal Meeting, I affirm the information identified by the City as
necessary for processing the application is provided herein or the information will not be provided if not otherwise
contained within the submittal, and the City may begin processing the application with the information as
submitted. This statement serves as written notice pursuant to the requirements of ORS 227.178 pertaining to a
complete application.
Date:
Revised 1/7/14 KL 2 of 11
Site Plan Review Application Process
1. Applicant Submits a Site Plan Review Application for Pre -Submittal
• The application must conform to the Site Plan Review Submittal Requirements
Checklist on pages 4-7 of this application packet.
• A pre -submittal meeting to discuss completeness is mandatory, and pre -submittal
meetings are conducted every Tuesday and Friday, from 10:00 am - noon.
• Planning Division staff strives to conduct pre -submittal meetings within five to seven
working days of receiving an application.
2. Applicant and the City Conduct the Pre -Submittal Meeting
• The applicant, owner, and design team are strongly encouraged to attend the pre -
submittal meeting.
• The meeting is held with representatives from Public Works Engineering and
Transportation, Community Services (Building), Fire Marshall's office, and the Planning
Division and is scheduled for 30 to 60 minutes.
• The Planner provides the applicant with a Pre -Submittal Checklist specifying the items
required to make the application complete if it is not already complete, and the
applicant has 180 days submit a complete application to the City.
3. Applicant Submits a Complete Application, City Staff Review the Application and
Issue a Decision
• A complete application must conform to the Site Plan Review Submittal Requirements
Checklist on pages 4-7 of this application packet.
• A Type II decision, made after public notice, but without a public hearing, unless
appealed, is issued within 120 days of submittal of a complete application.
• Mailed notice is provided to property owners and occupants within 300 feet of the
property being reviewed and to any applicable neighborhood association. In addition,
the applicant must post one sign, provided by the City, on the subject property.
• There is a 14 -day public comment period, starting on the date notice is mailed.
• Applications are distributed to the Development Review Committee, and their
comments are incorporated into a decision that addresses all applicable approval
criteria and/or development standards, as well as any written comments from those
given notice.
• Applications may be approved, approved with conditions, or denied.
• At the applicant's request, the Planner can provide a copy of the draft land use decision
prior to issuing the final land use decision.
• The City mails the applicant and any party of standing a copy of the decision, which is
effective on the day it is mailed.
• The decision issued is the final decision of the City but may be appealed within 15
calendar days to the Planning Commission or Hearings Official.
Revised 1/7/14 KL 3 of 11
Site Plan Review Submittal Requirements Checklist
NOTE:
• ALL of the following items MUST be submitted for BOTH Pre -Submittal and Submittal.
• If you feel an item on the list below does not apply to your specific application, please
state the reason why and attach the explanation to this form.
❑ Application Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development & Public
Works Department. Any applicable application, technology, and postage fees are collected
at the pre -submittal and submittal stages.
❑ Site Plan Review Application Form
❑ Narrative explaining the purpose of the proposed development, the existing use of the
property, and any additional information that may have a bearing in determining the
action to be taken. The narrative should also include the proposed number of employees
and future expansion plans, if known. Density - if applicable, list the size of property
(acres), maximum allowable density and the density proposed.
❑ Copy of the Deed
❑ Copy of the Site Plan Reduced to 81/:"x 11", which will be mailed as part of the
required neighboring property notification packet.
❑ State or Federal Permits Required - The applicant must demonstrate that an
application has been submitted for any required federal or state permit and provide a copy
of the application upon request.
❑ Completed Attached Scoping Sheet
❑ Four (4) Copies of the Following Plan Sets for Pre -Submittal OR
Four (4) Copies of the Following Plan Sets for Submittal:
❑ All of the following plans must include the scale appropriate to the area involved and
sufficient to show detail of the plan and related data, north arrow, and date of
preparation.
❑ All plan sets must be folded to 81h" by 11" and bound by rubber bands.
Please Note:
• These plans must provide enough information to enable the City to
determine that the proposed development is feasible, but are not
necessarily required to be detailed construction level documents.
• The City's Engineering Design Standards Manual, while not land use
criteria, may be used in whole or n part, by the City Engineer to determine
the feasibility of a proposed plan.
• Nothing herein should be interpreted as implying any requirement in
contradiction of Oregon Statute or Oregon Administrative Regulation.
Revised 117114 KL 4 of 11
a. Site Assessment of Existing Conditions
❑ Prepared by an Oregon licensed Architect, Landscape Architect, Civil Engineer or
Surveyor
❑ Vicinity Map
❑ The name, location and dimensions of all existing site features including buildings, curb
cuts, trees and impervious surface areas, clearly indicating what is remaining and what
is being removed. For existing structures to remain, also indicate present use, size,
setbacks from property lines, and distance between buildings.
❑ The name, location, dimensions, direction of flow and top of bank of all watercourses
and required riparian setback that are shown on the Water Quality Limited Watercourse
Map on file in the Development & Public Works Department
❑ The 100 -year floodplain and floodway boundaries on the site, as specified in the latest
adopted FEMA Flood Insurance Rate Maps or FEMA approved Letter of Map Amendment
or Letter of Map Revision
❑ The Time of Travel Zones, as specified in SDC 3.3-200 and delineated on the Wellhead
Protection Areas Map on file in the Development & Public Works Department
❑ Physical features including, but not limited to trees 5" in diameter or greater when
measured 4 1/2 feet above the ground (stands of more than five (5) trees may be
shown as a cluster with mix of trees species noted), riparian areas, wetlands and rock
outcroppings
b. Site Plan
❑ Prepared by an Oregon licensed Architect, Landscape Architect, Civil Engineer or
Surveyor
❑ Proposed buildings: location, dimensions, size (gross floor area applicable to the
parking requirement for the proposed use(s)), setbacks from property lines, and
distance between buildings; measured setbacks shall be prepared by an Oregon
licensed Surveyor when minimum setbacks are shown.
❑ Location and height of existing or proposed fences, walls, outdoor equipment, storage,
trash receptacles, and signs
❑ Location, dimensions, and number of typical, compact and ADA parking spaces;
including aisles, wheel bumpers, directional signs, and striping. ADA routes from public
rights-of-way whall be designated including at grade connections
❑ Dimensions of the development area, as well as area and percentage of the site
proposed for buildings, structures, parking and vehicular areas, sidewalks, patios, and
other impervious surfaces
❑ Observance of solar access requirements as specified in the applicable zoning district
❑ On-site loading areas and vehicular and pedestrian circulation
❑ Access to streets, alleys, and properties to be served, including the location and
dimensions of existing and proposed curb cuts and curb cuts proposed to be closed
❑ Location, type, and number of bicycle parking spaces
❑ Note location of existing and planned Lane Transit District facilities (within 1/2 mile)
Revised 1/7/14 KL 5 of 11
❑ Area and dimensions of all property to be conveyed, dedicated, or reserved for
common open spaces, recreational areas, and other similar public and semi-public uses
❑ Phased Development Plan — where applicable, the Site Plan application must include a
phasing plan indicating any proposed phases for development, including the boundaries
and sequencing of each phase. Phasing must progress in a defined sequence
addressing street connectivity between the various phases and accommodating the
logical extension of other required public improvements, including but to limited to,
sanitary sewer, stormwater management, water and electricity. The applicant must
clearly indicate which phases are proposed for approval under the current Site Plan
application and which are deferred to future review procedures.
c. Existing Improvement and Public Utilities Plan
❑ Prepared by an Oregon licensed Architect, Landscape Architect, Civil Engineer or
Surveyor
❑ Location and width of all existing easements
❑ Location, widths (of paving and right-of-way), and names of all existing streets, alleys,
dedications or other right-of-ways within or adjacent to the proposed development,
including jurisdictional status other than City. Indicate connection points for roof
drainage.
❑ Location and type of existing street lighting
❑ Location of existing and required traffic control devices, fire hydrants, power poles,
transformers, neighborhood mailbox units, waterline backflow preventers and similar
public facilities
❑ Location, width, and construction material of all existing and proposed sidewalks,
sidewalk ramps, pedestrian access ways, and trails
❑ Location and size of existing utilities on and adjacent to the site including sanitary
sewer mains, stormwater management systems, water mains, power, gas, telephone,
and cable N. Indicate the proposed connection points. Detail must be proportionate
to the complexity of the proposed project.
❑ Show existing and proposed spot elevations or contours, and direction of drainage
patterns.
d. Proposed Grading, Paving, & Utilities Plan
❑ Prepared by an Oregon licensed Civil Engineer, except where noted below
❑ The approximate size and location of storm water management systems components
❑ Location, widths (of paving and right-of-way), and names of proposed streets, alleys,
dedications or other rights -of -ways within or adjacent to the proposed development
❑ Location and width of all proposed easements
❑ Location and type of proposed street lighting
❑ Information on existing slopes over 5% shall be prepared by an Oregon licensed
surveyor and be drawn with one foot contour interval lines; land with a slope over 10
percent shall be shown with 5 foot contour interval lines
Revised 1/7/14 KL 6 of 11
e. Landscape Plan
❑ Prepared by an Architect, Landscape Architect, or other Landscape Professional
approved by the Director
❑ Location and dimensions of landscaping and open space areas to include calculation of
landscape coverage
❑ Where applicable, screening in accordance with SDC 4.4-110
❑ Location of existing and proposed street trees
f. Architectural Plans
❑ Where abutting residentially zoned properties, exterior elevations of all proposed
structures over 140 square feet for the development site, including height, shall be
shown
g. On -Site Lighting Plan
❑ Location, orientation, and maximum height of exterior light fixtures, both free standing
and attached
❑ Type and extent of shielding, including cut-off angles, and type of illumination,
wattage, and luminous area
Additional Materials That May be Deferred at the discretion of the applicant until
Final Site Plan or Building Permit Submittal:
❑ List in chart form the proposed types of landscape materials (trees, shrubs, ground
cover). Include in the chart genus, species, common name, quantity, size and spacing
❑ Where plants are proposed as part of the stormwater management system, a planting
plan shall be provided.
❑ Irrigation Plan showing of irrigation lines, required backflow preventers and above
ground utilities.
❑ Photometric test report for each light source.
❑ An applicant may submit conceptual floor plans in order to have staff address
Resolution of potential nuisance conflicts
Additional Materials That May be Required by the Director:
IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL
STANDARDS/APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE
APPLICANT SHOULD CONSIDER UTILIZING PRE -DEVELOPMENT MEETINGS AS
DISCUSSED IN SDC 5.1-120:
❑ Copy of a Preliminary Title Report issued within the past 30 days documenting
ownership and listing all encumbrances.
❑ A developer may be required to prepare a Traffic Impact Study (TIS) to identify
potential traffic impacts from proposed development and needed mitigation
measures.
Revised 1/7/14 KL 7 of 11
❑ Where a multi -family development is proposed, any additional materials to
demonstrate compliance with SDC 3.2-240
❑ Riparian Area Protection Report for properties located within 150 feet of the top of
bank of any Water Quality Limited Watercourses (WQLW) or within 100 feet of the
top of bank of any direct tributaries of WQLW
❑ A Geotechnical Report prepared by an engineer must be submitted concurrently if
the Soils Survey indicates the proposed development area has unstable soils and/or
a high water table, or if required by the City Engineer
❑ Where the development area is within an overlay district, address the additional
standards of the overlay district on plans and narratives
❑ Where physical aspects of a proposed development, including but not limited to
scale, odor noise, glare or vibration, will impact less intensive surrounding uses,
the Director may request submittal of conceptual floor plans or other information
necessary to determine compliance with applicable standards.
❑ If five or more trees are proposed to be removed, a Tree Felling Permit as specified
in SDC 5.19-100
❑ A wetland delineation approved by the Oregon Division of State Lands must be
submitted concurrently where there is a wetland on the property
❑ The applicant must demonstrate that an application has been submitted for any
required federal or state permit and provide a copy of the application upon request
❑ Where any grading, filling or excavating is proposed with the development, a Land
and Drainage Alteration permit must be submitted prior to development
❑ Where applicable, any Discretionary Use or Variance as specified in SDC 5.9-100
and 5.21-100
❑ An Annexation shall be submitted prior to submission of application, as specified
In SDC 5.7-100, where a development is proposed outside of the city limits but
within the City's urban service area and can be served by sanitary sewer
Revised 1/7/14 KL 8 of 11
SPRINGFIELD
225 FIFTH STREET
DEVELOPMENT AND PUBLIC WORKS GON SPRINGFIELD, OR 97477
PHONE. 541.726.3753
FAX: 547.736.1021
www.springffeld-or.gov
December 6, 2013
REQUIRED STORMWATER SCOPING SHEET USE POLICY:
In October 2003, Springfield Public Works released a trial "stormwater scoping sheet," provided to help
engineers and developers meet stormwater requirements in the Springfield Development Code (SDC) and
Engineering Design Standards and Procedures Manual (EDSPM). After a five month trial period, it became
apparent that users of the scoping sheet submitted much more complete applications than non-users. An added
bonus was a decrease in the overall review time spent on the applications, resulting in quicker notice of
decisions.
As a result of the benefits of the scoping sheets, the City has decided to make their use a mandatory process.
Current city policy is that the use of stormwater scoping sheets is required for all applications which require
development review. All applications submitted to the City shall provide a copy of a completed stormwater
seeping sheet with the application packet. Attached with this letter is the latest version of the scoping sheet,
which reflects changes requested by the development community.
PLEASE NOTE: SUBMITTED APPLICATIONS WILL NOW BE REQUIRED TO SUBMIT A
COMPLETED STORMWATER SCOPING SHEET, STORMWATER STUDY AND PLANS IN
CONFORMANCE WITH THE SCOPE REQUIREMENTS
DIRECTIONS FOR USING STORMWATER SCOPING SHEETS ARE AS FOLLOWS:
1.) Obtain scoping sheet from application packet, city website, or other location.
2.) Fill out project information (top half of front sheet) prior to commencement of work on stormwater study.
(Note: Do not sign scoping sheet until it is received from the City with requirements checked.)
3.) Mail, fax, or email all pages to: City of Springfield, Development and Public Works Dept., Atm: Clayton
McEachem.
4.) Receive completed scoping sheet (filled out by the City) indicating minimum requirements for a complete
stormwater study.
5.) Include four (4) copies of complete scoping sheet (signed by engineer at the bottom of page 2), stormwater
study and plans that comply with the minimum required scope with submittal of application packet. The
scoping sheet shall be included as an attachment, inside the front cover of the stormwater study.
Siormwater scoping sheets can be found with all application packets (City website and the DPW front counter)
as well as on the Engineering and Construction Resources webpage located at: http://www.springfield-
or.eov/DPW/EneineerineandComtructionResources.htm under the Public Improvement Permit Projects Forms
section. Thank you in advance for working with the City of Springfield with this new process.
Sincerely,
Clayton McEachem, PE
City of Springfield, Development and Public Works
Email: cmceachem@springfield-or.gov
Phone: (541) 736 —1036
Fax: (541) 736— 1021
DEVELOPMENT AND PUBLIC WORKS
225 FIFTH STREET
SPRINGFIELD, OR 97477
PHONE: 541.726.3753
FAX 541.726.1021
www.springfield-or.gov
STORMWATER MANAGEMENT SYSTEM SCOPE OF WORK
------------------------------------- (Area below this line filled out by Applicano ------------------------
(Please rehu'n to Clayton McEechera @ City o(SpringReld Development and Public fvorkya hter # 736-1021 Phone M 736-/036),
email: cmceachernq.sprin,T7eld-or.gov
Project Name:
Applicant:
Assessors Parcel #:
Date:
Land Use(s):
Phone #:
Project Size (Acres):
Fax #:
Approx. Impervious Area:
Email:
Project Description (Include a copy of Assessor's map):
Drainage Proposal (Public connection(s), discharge location(s), etc. Attach additional sheet(s) if necessary:
Proposed Stormwater Best Management Practices:
------!Area below this line filled out by the City and Returned to the Applicant! --------------
(At a minimum, 011 bases checked by the City on the fi'onl and back ofthis sheet shall be submitted
or an application to be complete or submittal, although other requirements may be necessary.)
Drainage Study Type (EDSPM Section 4.03.2): (Note, UH may be substituted for Rational Method)
❑ Small Site Study — (use Rational Method for calculations)
❑ Mid -Level Development Study—(use Unit Hydmgraph Method for calculations)
❑ Full Drainage Development Study — (use Unit Hydrograph Method for calculations)
Environmental Considerations:
❑ Wellhead Zone: ❑ Hillside Development:
❑ Wetland/Riparian: ❑ Floodway/Floodplain:
❑ Soil Type: ❑ Other Jurisdictions
Downstream Analysis:
❑ N/A
❑ Flow line for starting water surface elevation:
❑ Design HOE to use for starting water surface elevation:
❑ Manhole/Junction to take analysis to:
Return to Clayton McEachern @ City of Springfield, email: cmceachem@spnngfield-or,gov, FAX: (541) 736-1021
COMPLETE STUDY ITEMS aro ciatoseomy.
"Based upon the information provided on the front orate, sheet, the following represents a minimum ofwhat is needed for an
application to be complete, for submittal with respect to drainage; however, this list shouldnot be used in lieu ofthe Sprinifield
Development Code (SDC) or the City's Fngineering Design Manual Compliance with these requirements does not constitute site
approval; Additional site specific information maybe required. Note: Upon scoping sheet submittal, ensure completed form has been
signed in the space provided below:
Interim Design Standards/Water Quality EDSPM Chapter 3
Req'd N/A
❑ ❑ All non -building rooftop (NBR) impervious surfaces shall be pre-treated (e.g. multi-chambered catchbasin w/oil filtration
media) for stormwater quality. Additionally, a minimum of 50% of the NBR impervious surface shall be treated by
vegetated methods.
Where required, vegetative stormwater design shall be consistent with design standards (EDSPM Section 3.02), set forth
in Chapter 2 of the Eugene Stormwater Management Manual.
❑ ❑ For new NBR impervious area less than 15,000 square feet, a simplified design approach may be followed as specified
by the Eugene Stormwater Mariagement Manual (Sec2.4.1).
❑ ❑ if a stormwater treatment swale is proposed, submit calculations/specificationsfor sizing, velocity, flow, side slopes,
bottom slope, and seed mix consistent with City of Springfield or Eugene's Stormwater Management Manual.
❑ ❑ Water Quality calculations as required in Section 3.011 of the EDSPM.
❑ ❑ All building rooftop mounted equipment, or other fluid containing equipment located outside of the building, shall
U
U
Drainage study prepared by a Professional Civil Engineer licensed in the state of Oregon.
❑
F-1
A complete drainage study, as required in EDSPM Section 4.03.1, including a hydrological study map.
❑
F-1
Calculations showing system capacity for a2 -year storm event and overflow effects of a 25-yearstorm event.
❑
E]
The time of concentration (Tc) shall be determined using a 10 minute stmt time for developed basins.
Review of Downstream System ( EDSPM Section 4.03.4.0
❑
❑
A downstream drainage analysis as described in EDSPM Section 4.03A.C. On-site drainage shall be governed by the
Oregon Plumbing Specialty Code (OPSC).
Elevations of the HOT, and flow lines for both city and private systems where applicable.
❑
Design of Storm Systems (EDSPM Section 4.04).
❑
❑
Flow lines, slopes, rim elevations, pipe type and sizes clearly indicated on the platy set.
Minimum pipe cover shall be 18 inches for reinforced pipe and 36 inches for plain concrete and plastic pipe materials, or
proper engineering calculations shall be provided when less. The cover shall be sufficient to support an 80,000 lb load
without failure of the pipe structure.
Manning's "n" values for pipes shall be consistent with Table 4-1 of the EDSP. All storm pipes shall be designed to
achicvc a minimum velocity of three (3) feet Der second at 0.5 woe full based on Table 4-1 as well.
U U Existing and proposed contours, located at one foot interval. Include spot elevations and site grades showing how site
drains.
❑ n Private stormwater easements shall be clearly depicted on plans when private stormwater flows from one property to
another.
Drywells shall not receive runoff from any surface w/o being treated by one or more BMPs, with the exception of
residential building roofs (EDSP Section 3.03.4.A). Additional provisions apply to this as required by the DEQ. Refer to
the website: http9/www.dea.state.ocus/wu/uic/uiahtm for more information.
Detention ponds shall be designed to limit runoff to pre -development rates for the 2 through 25 -year storm events.
"This form shall be included as an attachment, inside the front cover, of the stormwater study.
"IMPORTANT: ENGINEER PLEASERE4D BELOlPAND SIGN.'
As the engineer of record, l hereby certify the above required items are complete and included with the submitted stormwater study
and plan set. Signature Date
Tom Version 5: June 2015
riv wiandllatmialane
Memo
Willamalane Center for Sports and Recreation 1250 S. 32nd St, Springfield OR 97478-6302
541-736-4544 1 willamalane.org
TO: City of Springfield
FROM: Fraser MacDonald, Natural Resource Planner
DATE: September 1st, 2020
SUBJECT: Site Plan Review Application for Thurston Hills Natural Area, Attachment 1
PARCELS: 1802100000100,1802020000400,1802020000401,1802030000600,
1802020000100,1702350003604,1802090000100,1802030000602,
1702350003500,1702350003602
This memo (Attachment 1) includes information supporting the Site Plan Review Application
for Thurston Hills Natural Area Park (THNA), dated September 1", 2020. It includes a
description of proposed improvements, a proposed project timeline, and all of the submittal
requirements for Site Plan Review.
DESCRIPTION OF PROPOSAL
In 2017, Willamalane Park and Recreation District (District) developed the North
Trailhead and associated trails (Lower & Upper Mossy Maple, Acer Spades and Yew
Haw) to provide the public with access to the recently acquired Thurston Hills Natural
Area. The trailhead located at 7575 McKenzie Highway is intended to support motorized
(i.e, vehicles) access to the site with vehicle parking for up to 49 cars. Development of
the site and public access were identified as priorities in the Willamalane Park and
Recreation District Comprehensive Plan (2012) as well as the Rivers to Ridges Vision
Plan (2003). The North Trailhead will also provide future motorized access for the public
to Bureau of Land Management (BLM) Property adjacent to Thurston Hills Natural Area
that will be developed with a complimentary and connected multi -use trail system. With
initial site development and access complete, there are now additional opportunities to
continue recreational development.
The District is proposing to start development of Phase Two in the spring of 2020, which
includes approximately 6.3 miles of new trails that will provide close -to -home access to
the site (EXHIBIT A). Additionally, this next phase of development will provide non -
motorized connections to the site from the greater Springfield- Eugene area by connecting
the trails to the former Weyerhaeuser Haul Road, which provides connectivity to the
Millrace Path and Middle Fork Path.
Trails will be constructed using International Mountain Biking Association (IMBA) trail
guidelines and standards in addition to best -practices identified through the American
Trails Organization. Design and construction of these trails will be conducted by a private
contractor in addition to volunteer crews managed by District staff (See EXIBIT A) for
location of Phase Two trail development). The District will ensure high quality trails
through its procurement process, by requiring the contractor to have constructed similar
trails in the past, be a member of the Professional Trail Builders Association and have a
list of references and past examples of similar work for the District to review. See
EXHIBIT B for details on trail construction specifications. Final details regarding trail
alignments will be submitted to the City prior to construction as part of obtaining a Land
Development and Alteration Permit and a Tree Felling Permit for trail construction.
The District has not identified any potential trailhead possibilities on the site plan map
(EXHBIT A). The District is proposing that this next phase and the increased access that
it will provide for the public is focused on non -motorized access to the site. Development
of a trailhead is considerably more difficult on the west side of the property. The District
will continue to investigate options for development of a trailhead that could serve patrons
wanting to park their vehicles to access the west side of the property and will do a site
plan modification when that location is identified. To that end we are focused to
providing non -motorized access to the site via the former Weyerhaeuser Haul Road,
recently renamed the Thurston Hills Path, as part of the phase two development. There
will be no signage that designates any place other than the trailhead at 7575 McKenzie
Highway as a trailhead. Any signage on the site or leading the public to the improved
access points from the west will be identified as non -motorized access points. Any
information regarding the location of access points on the west side of the site will remain
as non -motorized access points.
The main purpose in developing trails on the west side of the property as part of this
Phase Two trail development is to provide improved close -to -home recreational
opportunities in the public. The current designated trail on the west side of the property is
a steep gravel access road that does not provide a high quality user experience. Phase Two
trail development will provide a better uphill and downhill trail experience at a more
moderate grade (average 8%) than the existing Camas Crest Trail (i.e., main access road
on the west side of the property).
EXHIBIT B provides examples of the trail specifications that will be included in the
request for quotes for the development of the next phase of trails in Phase Two. The trails
will be constructed in such a way as to minimize erosion on the trail as well as one the
site. Features such as grade reversals and out -sloping will be used throughout the trails to
get water off of the trail tread thereby limiting possible erosion. Trails will be constructed
during the dry season to minimize any likelihood of erosion or impacts off site.
Contractors constructing the trail will use erosion control devices, such as waddles, if rain
is forecast during the construction period. Areas disturbed by construction and adjacent to
the constructed trails will be seeded with native (orbs and grasses to stabilize the soil,
improve the user experience as well as limit any possible erosion. The District will
provide the City with a detailed plan as part of its Land Development and Alteration
Permit (LDAP) for trail construction. Additionally, in the event of tree removal being
necessary for trail development and construction, the District will obtain a Tree Felling
Permit from the City of Springfield.
Physical Features: The site is a diverse 665 -acre natural area park with a variety of
different habitats. From the trailhead at 7575 McKenzie highway the vegetation is mixed
conifer/hardwood forest running along the north facing slope of the ridge. The majority of
the north facing slopes contain similar vegetation. The south facing slopes of the property
are comprised of oak woodlands, savannas and prairie EXHIBIT C (Vegetation Map).
There are some areas of mixed conifer and hardwood forest, but primarily on the north
facing slopes. Much of the oak habitat in this portion of the natural area has been
encroached with conifers due to fire suppression and will require restoration work in the
future. Much of the understory throughout the site is comprised of a mix of invasive and
native vegetation.
The site's topography can be described as having rolling to steep topography. The
elevation ranges from about 600 feet at the southern edge of the property (low point) and
about 940 feet at the northern edge, to 1,625 feet at the eastern edge about halfway
between the north and south boundaries (EXHIBIT D). The topography of the site is
divided between two watersheds; the McKenzie River to the north and the Middle Fork of
the Willamette River to the south and west. On the far western side of the natural area the
slopes vary from 0-20%, to 30-40%. As elevation increases towards the east, the slopes
begin to get steeper, varying from 40-60% to as high as 60-80% and 90-120% at the
highpoints. The trail design siting criteria being used for this project call for trails to be
sited away from steep slopes to avoid potential erosion issues or to create full -bench trails
with erosion control features, such as grade reversals, throughout. The north side of the
natural area is primarily composed of a mix of landslide deposits. A major topographical
feature of the site is a rock cl iff ridgelme located in the north central portion of the site.
Hydrology: The site does not contain any permanent water bodies. The hydrology of the
site mainly consists of seasonal streams and drainage ways. The seasonal streams appear
mid -slope, below steeper sloped areas. There is one small mapped wetland on the site in
the south-central portion of the site that is listed as PFOA wetland (Palustrine, Forested,
A—temporary flooded- and/or saturated). There are no plans to construct trails within the
mapped wetland on the property (EXHBIT E).
Development Standards:
3.2-710 Schedule of Use Categories —Public Land and Open Space Zoning District
Parks and Open Spaces
Regional Parks S
Response: Regional Parks are permitted in the Public Land and Open Space Zoning
District, subject to review for consistency with standards from Section 4.7-100, as
well as Section 3.2-715. Findings in response to these criteria are presented below.
3.2-715 Base Zone Development Standards
Development Standard
I PLO Zoning District Requirement
Minimum Lot/parcel Size
I None
Lot/parcel Coverage and
I Parking, driveways and structures shall not exceed 65 percent of
Planting Standard
the development area. At least 25 percent of the development area
shall be landscaped. EXCEPTION: In the Downtown Exception
Area, there shall be no minimum lot coverage standards and no
minimum planted area, except for parking lots (6).
Landscaped Setbacks 1 , 2 , 3 and 4)
Street Setback
15 fee[
Residential Property Line
20 fee[
Puking and Driveway
5 feet
Maximum Building
None, unless abutting a residential district
Height(5)
PLO District abuts
When a PLO District abuts a residential district, the maximum
Residential District
building height shall be defined as the height standard of the
applicable residential district for a distance of 50 feet measured
from the boundary of the adjacent residential zoning district.
Beyond the 50 -foot measurement, there is no building height
limitation.
(1) Where an easement is larger than the required setback standard, no building or above
grade structure, except a fence, shall be built upon or over that easement.
(2) When additional right-of-way is required, whether by City Engineering standards, the
Metro Plan (including TransPlan), or the City's Conceptual Street Plan, setbacks are based on
future right-of-way locations. Dedication of needed right-of-way shall be required prior to the
issuance of any building permit that increases parking or gross floor area.
(3) Structural extensions may extend into any 5 -foot or larger setback area by not more
than 2 feet.
(4) In the Downtown Exception Area, there are no minimum setbacks for administrative
offices and other public uses listed under Section 3.2-710.
(5) Incidental equipment may exceed the height standards.
(6) In the Downtown Exception Area, there shall be no minimum planted area except for
parking lots as specified elsewhere in this Code.(6238)
Response:
Lot/parcel Coverage and Planting Standard: No parking, driveways and structures we
proposed as parts of Phase Two trail development at Thurston Hills Natural Area.
Landscaped Setbacks (1),(2),(3) and (4): No landscaping is being proposed in the Phase
Two Trail Development at Thurston Hills Natural Area.
Street Setback: All trail development will be setback at least 15fl. from any street
Residential Property Line: All trail development will be setback at least 20 feet from
any residential property line.
Parking and Driveway: No parking or driveways are proposed as part of Phase Two trail
development
Maximum Building Height: No buildings or structures are proposed as part of the Phase
Two trail development proposed in this application.
PIA District abuts Residential District: No buildings or structures are proposed as part
of Phase Two trail development adjacent to any residential zoning district.
4.7-200 Public and Private Parks
Public parks shall be designated in the Metro Plan including the Willamalane Park and
Recreation District Comprehensive Plan or be approved in accordance with a Discretionary Use
application as specified in Section 5.9-100.
Response: Thurston Hills Natural Area is identified in the Metro Plan and the Willamalane
Park and Recreation District Comprehensive Plan.
A. Standards for Public and Private Parks in the BKMU District
1. Community Parks shall be designated on a Park Facilities Plan adopted by the
City, or be approved in accordance with Type til review procedure (Discretionary
Use).
Response: The identified second phase of trail development at Thurston Hills Natural
Area will be outside of the Booth Kelly Mixed Use District.
2. A Traffic Impact Study shall be prepared by a Traffic Engineer and approved
by the City Engineer.
Response: The identified second phase of trail development at Thurston Hills Natural
Area will be outside of the Booth Kelly Mixed Use District.
B. Standards for Public and Private Parks in the PLO District.
1. Primary access shall be on arterial or collector streets unless specified or
exempted elsewhere in this Section.
Response: Primary access to the site is from the trailhead located at 7575 McKenzie
Highway. This location provides primary access to the site from the state highway.
There are no primary access points being proposed as part of Phase Two trail
development.
2. Stadiums, swimming pools and other major noise generators within parks shall
be located at least 30 feet from residential property lines and screened by a noise
attenuating barrier.
Response: There are no stadiums, swimming pools and other major noise generators
being proposed as part of Phase Two trail development.
3. Community and regional parks shall be designated on a Park Facilities Plan
adopted by the City, or be approved in accordance with Type III review procedure
(Discretionary Use).
Response: Thurston Hills Natural Area is designated in the Willamalane Park and
Recreation District Comprehensive Plan that has been approved and adopted as part of
the Metro Plan.
4. A traffic impact and parking study shall be prepared by a Traffic Engineer and
approved by the City Engineer.
Response: No parking or traffic impacts are anticipated or expected as a result of the
Phase Two trail proposal that is being proposed in this application, based on direction
from staff given during the development Issues Meeting (Case # 811 -19 -000218 -PRE,
October We, 2019)
C. Standards for the Urbanizable Fringe Overlay District. Neighborhood Parks shall be
shown on the Metro Plan or an adopted refinement plan, or shall be reviewed under Type III
Discretionary Use procedures.
Response: Thurston Hills Natural Area is designated in the Willamalane Park and
Recreation District Comprehensive Plan that has been approved and adopted as part of
the Metro Plan.
Site Plan Criteria 5.17-125
The Director shall approve or approve with conditions: a Type II Site Plan Review application
upon determining that approval criteria in Subsections A. through E, below have been
satisfied. If conditions cannot be attached to satisfy the approval criteria, the Director shall
deny the application.
A. The zoning is consistent with the Metro Plan diagram, and/or the applicable Refinement
Plan diagram, Plan District map, and Conceptual Development Plan.
Response: The zoning is consistent with the Metro Plan diagram, and/or the applicable
Refinement Plan diagram, Plan District map and Conceptual Development Plan. This proposal
for a second phase of trail development is consistent with the Metra Plan designation for the
site, establishing the site as a natural area park within the PLO zone
B. Capacity requirements of public and private facilities, including, but not limited to,
water and electricity; sanitary sewer and storrnwater management facilities; and streets and
.traffic safety controls shall not be exceeded and the public improvements shall be available to
serve the site at the time of development, unless otherwise provided for by this Code and other
applicable regulations. The Public Works Director or a utility provider shall determine capacity
issues.
Response: Phase Two trail development at the Thurston Hills Natural Area will not require the
development of public or private facilities for water, electricity, sanitary sewer or stormwater
management facilities. There are no additional street or traffic safety controls that will be
required for this level of development.
C. The proposed development shall comply with all applicable public and private design
and construction standards contained in this Code and other applicable regulations.
Response: The Phase Two trail proposal will comply with all applicable public and
private design and construction standards. There were no identified public or private
designs standards that will be invoked by this project.
D. Parking areas and ingress -egress points have been designed to: facilitate vehicular
traffic, bicycle and pedestrian safety to avoid congestion; provide connectivity within the
development area and to adjacent residential areas, transit stops, neighborhood activity centers,
and commercial, industrial and public areas; minimize driveways on arterial and collector
streets as specified in this Code or other applicable regulations and comply with the ODOT
access management standards for State highways.
Response: There are no identified parking areas, trailheads associated with the proposed Phase
Two trail development at Thurston Hills. Access from the west side of the property will be for
non -motorized users including pedestrians and bicyclists.
E. Physical features, including, but not limited to: steep slopes with unstable soil or
geologic conditions; areas with susceptibility of flooding; significant clusters of trees and
shrubs; watercourses shown on the WQLW Map and their associated riparian areas; other
riparian areas and wetlands specified in Section 4.3-117; rock outcroppings; open spaces; and
areas of historic and/or archaeological significance, as may be specified in Section 3.3-900 or
ORS 97.740-760, 358.905-955 and 390.235-240, shall be protected as specified in this Code or
in State or Federal law.
Response: Physical features including but not limited to: steep slopes with unstable soil,
or geologic conditions; areas with susceptibility of flooding; significant clusters of trees
and shrubs; watercourses shown on the WQWL Map and their associated riparian areas;
other riparian areas and wetlands specified in Section 4.3-117; rock outcroppings; open
spaces; and areas of historic and/or archaeological significance, as specified in Section
3.3-900 or ORS 97.740-760, 358.905-955 and 390.235-240, shall be protected as
specified in this Cade or in State and Federal Law. Willamalane will be protecting and
preserving the natural features of the site and all of the above identified physical features
will be preserved and protected as part of Phase Two trail development. The physical
features of the site are extremely important for providing both habitat for wildlife as well
as the setting for the public to recreate in and will not be compromised as pan of this
development. The identified wetland on the site will be avoided during trail construction
and we do not anticipate any negative impacts to other physical features of the site or any
archaeological or historic resources on the site.
!
!
}
: }
/
/
�
-
Q
\
\\\
�
E\
!
!
Eshbit B
Proposed Trail Cross section
iSide slope
Critical Point
(Rounded) \\
Back slope f
(gently blended)
Tread base: 3" of Y." minus /
topped with 1" of %"minus
Trail Tread
(outsioped 5%)
OUTSLOPED CLIMBING TURN
NOT To WKE
+A
mlN,h
1
i%
Wkla emelanl yrotla Seetfon
4
f7
jl
upas°'—�-
-A
Evn WYne a4 4knbipq lum
vE beMOUN a StAKm
ON THE gtWN0.
PLAN VIEW
mrw9L wle are '
prmlttM IMwgk
NmhigLL twnv
Inelopv JC..�
Mdepv � X
SECTION A -A
486 912-10
INSLOPED CLIMBING TURN
NOT To uxa
A
1 eam �%i
#lanlah canxtanS giatle 1 goatmn
1 f/
//i
Ind-
Ind1 I
UMto
um.dol yM.bW. mTimuia
/�l�/
�o�I
—A
C .lwa of dleod" wm
e41 be FU4GM m STAM
W THE *R*JN Y.
PLAN VIEW
m.eayx wt, a,a
parnnittl ffirauph
dcabg x�a.
t
SECTION A—A
[f
4/88
OUTSLOPED CLIMBING TURN
NOT To �. ,.
,,A
is
unml� � Blo." W. I Se�v.
� /ff
u--
r A
C.Wn. of .fmb'.q Wo
.at e. rzacM a Wr
ca Tx: Glimmm
PLAN VIEW
mrw9u w"a ue '
prnrltGtl tlrwgM1
eENnbhq tans
fnalap.
ata o. 5
SECTION.. A-A
Afts 4i9710
GRADE DIP
NOT TO SCAa
q.
CL's—
_ Y«Y GntMLu shift os
wrY to aayr¢t
ayllrvoK
nau,tda autdag,
ma twnew wart.
PLAN VIEW
Wlaval Gomel,
-- _
mTum�
ac mNiMNT m•rahinw
a/as 912-4
OUTSLOPED CLIMBING TURN
NOT To Kf
A
ts
II ��
i
noncan 000ato�t woad � sa�� ii
—
i
E
r/i
uff^ /
;7,77'
J�rJJrJ/J�' l7/r/J J/JrJ
A
tartan. a a b" Wm
w e: RMa srrzao
P AN VI W
Thtau9M1 a.0 a
grmitta lirvuyk
uiAzdtgr Wnv
Invltq JY
SECTION A—A
4/96 912^10
ROLLING DIP
NOT 70 $CAE
dMt.1 p4
If\ 1 we ett�dla led W,,
R. dap m6 ✓�)
NAT. of 40
wftw fart,b fl -lm
PLAN VIEW
�m m--- _
-------- — t
PHQFjLE
Ons 912-5
e