HomeMy WebLinkAboutPermit Building 1992-06-16COMMERCIAL/INDUSTRIAL -'
PERMIT APPLICATION
225 Fifth Street, Springfield, Orcgon 97477
SPRINGFIELD JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
LOCATION OF PROPOSED WORK:McKsuzt€,Mr+r.orr- t33'3 lJ. FIKJT- 5 772"9
ASSESSORS MAP:17o3 2 33 TAX LOT:OC
PHON
zlP
I I
OWNER (rr.ra?.'ur P
STATE:<1 R€e€lj
TLC.USA UMNA P*
17oo
ADDRESS
CITY:I%Zva>7n rrr
DESCRIPTION OF WORK
NEW- REMODEL VALUxADDITION DEMOLISH OTHER
NAME ADDRESS PHONE
IE
CONST.
CONTRACTOR'S NAME ADD RESS CONTRACTOR RES
GENERAL:
PLUM BI NG
ARCHITECT:
MECHANICAL:
ELECTRICAL:
PLUMBING
NO.FEE CHARGE
Single Fixture
Relocated Bld
(new fix. addtl s
)
Water Service
ft.
Sanitary Sewer
(+
Storm Sewer
ft
Backf low Device
TOTAL PERMIT
NO FEE CHA RGF
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
- OFFICE USE _
LAND USE:
ZONING* OF UNITS:
HANDICAP ACCESS:
FLOOD PLAIN
LIGHTING POWER BUDGET:
WATER HEATER:
OCCY GROUP:
# OF STORIES
QUAD AREA:
* OF BLDGS:
CONSTR. TYPE:
HEAT SOURCE:
SQ. FT.$/SQ. FT.VALUE
aaTOTAL VALUE OF PROJ
X
X
X
*
SQ. FTG MAIN
SQ. FTG ACCESS
SQ, FTG OTHER
4e!'PLAN CHECK FEE 5/)3RCPT#DATE BY
o3
65.{b
BUILDING PERMIT 39,50 PLUMBI NG DEMOLITION
5% State
Su rcharo e /,77 5% State
Surcharoe
MECHANICAL FENCE
VALUE $
5% State
Su rcharoe
SIDEWALK
FT.
SUBTOTAL
PEBM ITS
PAVING CURBCUT
FT.
SYSTEMS
DEVELOPMENT N/A
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
ozosy'-s
.(so! 646-5tBa
E
i
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:OO a.m. will be made
the following work day.
S|TE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in
made after excavation, but ELECTRICAL & place but prior to placing
prior to setup of forms. MECHANICAL: No work is to asphalt or concrete.
be covered until these
UNDERSLAB pLUMBING, inspections have been made SPECIAL INSPECTIONS: ln accordance
ELECTRICAL & and approved' section 306 0f the state specialty code
MECHANICAL: To be made a special inspector shall be employed
before any work is covered. ATTIC DRAFT STOPS & oy ine ownei/ Contractor during
CURTAIN WALLS construction of the following work. A
FOOTINGS & FOUNDATIONS: E'bE6r A^E. r copy of the special testing reports shall
To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division.
excavated and forms are facing materials and before
erected,allsteelinplace,but\rframinginspection'sTRUcTuRALCoNCRETE:ln
prior to pracing concrete. X FRAMTNG: To be made after excess of 2500 PS'l' (306 a'1)
coNcRErE SLAB: ro be ti:J;:l;ilJ'3il'Jlfli,tL? ," srRUcruRAL wELDS:
made after all inslab building place and all pipes, chimneys Performed on the iob. (2722 1\
service equipment, conduit, and vents are'complete andplping, accessories and other the rough electrical, plumbing HlcH STRENGTH BOLTING:
ancillary equipment items are and meihanical are approved. During all bolt installation and
in place but before any tightening operations. (306
concrete is placed. INSULATION & VApOR a.6)
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or f illing
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
f loor sheathing.
POST & BEAM: To be made
prior to installation of floor
insulation, decking or f loor
sheathing.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
SPRAYED ON
FIREPROOFING: U.BC.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU-LAM BEAMS: lnspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.BC.
sTDS. 25-10J1).
STRUCTURAL MASONRY: (306
a.7l
.ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
LATH AND/
BOARD: To be all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
f inished.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
GYPSU
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this proiect.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
'?
"--nature DateA
tontimes during c
Fos.<oVALIDATION:z
5/3 7
AMOUNT RECEIVED:
RECEIPT *:RECEIVED BY:
DATE PAID
FINAL ELECTRICAL
FINAL MECHANICAL
S]TE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking Iot stri ping, etc. must be completed before
requesting this inspection.
FINAL BUILDING: Requested after the flnal plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.x FINAL FIRE DEPARTMENT
A DDITION A L COIVI IVI FNTS
PLANS REVIEWED BY DATE
X
FINAL PLUMBING
x
COMM ERCIAL/ IN DUSTRIAL -
PERMIT APPLICATION
225 Fiftn Street, Springfield, Oregon 97477
LOCATION OF PROPOSED WORK:
ASSESSORS MAP:
SPFIINGFIELO -- JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
TAX LOT:
o^ E4s
S/-
-tqL- Lsg lPHONE:
ZIP:STATE:
C*-ut**
!f
Oyz-cl
CITY:
ADDRESS:
OWNER:
NEW
-
FIEMoDEL U( ADDtrloN DEMoLtsH orHEFl VALUE:
DESCRIPTION OF WORK:
ARCHITECT
ELECTRICAL:
PHONEADDRESSNAME
EXPI RESADD RESS
trhl inhrP
u
at,\t 6Lo i, Su
G E N ERAL:
CONTRACTOR'S NAME
MECHANICAL:
PLUMBING:
CONST.
CONTRACTOR #PHONE
UBL(-3737
PLUMBING
NO.FEE CHARG E>_ Single Fixture nD
Relocated Bld
(new fix. addtl s
)
Water Service
ft.
Sanitary Sewer
ft.
Storm Sewer
ft
Backf low Device
TOTAL PERMIT Z'2
MECHANICAL
NO trFF EHA FIGF
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or tloor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
ZONING:
_ OFFICE USE -
LAND USE:
HANDICAP ACCESS:
FLOOD PLAIN
LIGHTING POWER BUDGET:
WATER HEATER:
* OF UNITS:
OCCY GROUP:
* OF STORIES:
QUAD AREA:
* OF BLDGS:
CONSTR. TYPE:
HEAT SOURCE:
$/so. FT.VALUESQ. FT,
TOTAL VALUE OF PROJ
XSO. FTG MAIN
SO. FTG ACCESS
SQ. FTG OTHER
RCPT#PLAN CHECK FEE DATE BY
4/-oo
BUILDING PERMIT PLUMBI NG zo,eo DEMOLITION
5% State
Surcharge
5% State
Su rc haroe /n
MECHANICAL FENCE
VALUE $4aaP 2o.a
5% State
Su rch arge
SIDEWALK
FT.
SUBTOTAL
PERM ITS
PAVI NG CURBCUT
FT.
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
FOOTINGS & FOUN DATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or f illing
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
f loor insulation, decking or
floor sheathing.
POST & BEAMr To be made
prior to installation of floor
insulation, decking or f loor
sheathing.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or f loor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
uBc 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
ROUG
ELECT
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
f inished.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
PAVING: After gravel is in
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTU RAL CON CRETE: In
excess of 2500 P.S.l. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2722 t)
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AN D FILLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU.LAM BEAMS: lnspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B'c.
sTDS. 25-10,11).
STRUCTURAL MASONRY: (306
a.7l
*ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
x LUMBIN
By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCy
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
&,,:"7', _2_Date
aoVALIDATION 2zAMOUNT RECEIVED
RECEIPT #RECEIVED BY:
DATE PAID
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE OEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot stri ping, etc. must be completed before
requesting this inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
ADDITIONAL COMMENTS
PLANS REVIEWED BY DATE
-X-
C'TY OF
sl 'l llr.l(;r.lLLO
%
225 FIFTB STREET
SPRTNGFTELD, oREGoN 97477 ,
INsPEcf,roN REQUBST. 726-3709 fi0FFTCE: 726-3759
1 OF
ty Jo
FEECOHPI.^ETE
Ic
ONPERHIT APPLICATI
SCTTEDULE BELOU
b Nuurber
A Nev ReiidEntial-Single or
HuIti-FamiIy per dvelling unit.
Service fncluded:
Items Cost Sum
.4"d FTION
t f,s 1000 sq.ft. or less
Each additional 500
sq. ft or portion
thereo f
Each Manufrd Home or
-Hodular Dvelling
Service or Feeder
Services or FeedersInstallation, Alterations or
Relocation:
2. COMRACf,OR INSTALI.ATION ONLY
Electrical Contrac tor trtl'N f Lhnz .gauta
Address ILD lho r* Sf, 0.0.box 23q 2q
Phone ylq - 35b1
Supervisor License Ndmber 75ll - S
Expiration Date lO
Constr Contr. Number h cl 910
Expiration Dare q lS/q I
Signature of ing Electrician
Ovners Name
Address
Ci ty Phone
OIINER INSTALI^ATION
The installation is being made onproperty I ovn which is not intendedfor sale, Iease or rent.
ture:
RECEIPT
)lt s 8s.00
$ 1s.00
$ 40.00
Permits are non-transferable and expireif vork is not started vithin 180 daysof issuance or if work is suspended for
180 days.
B
c
200 amps or less
201 amps to 400 amps
-401 amps to 600 amps _601 amps to 1000 amps-
Over 1000 amps/volts
Reconnect Only
00
00
00
00
00
00
50
60
100
130
300
40
$
$
$
$
s
$
Temporary Services or FeedersInsta1lation, Alteration or Relocation
200 amps or less S 40.00
201 amps to 400 amps
-
g 55.00
0ver 401 to 600 amps S 80.00
Over 600 amps or 1000 voITs see ,rgr
"ffi1-
\ E1- Nev, Alteratlon or Extension Per Panel
onb circuit _l_ $ 35.00 _fi' Each Addi t ionalHt -totBt ::';::i.:'r:il1,'"'u"u I s 2. oo 4
E. I'liscellaneous (Service/feeder not included)
-Each installation
Prrmp or irrigation SSign/0utIine Lighting- $
Limi ted Energy/Res
-
SLimited Energy/Comm
5 SUBTOTAL OF ABOVE5f State Surcharge
TOTAL
00
00
00
00
40.
40.
20.
36.
0vn
e
DA
RECEIVED BY:EEsa2-{
rtre n*""Mrutr.-F-*
Plan Ck. Conm/lnd
55%/81do Per Fep ?<:D9 teris Derqe (1
Svs
cha
VE
57
opmentBUILDING PERIIIT
Charges anC
Surc ha rges
_38-*____Plan Ck. Res
30%/Bldq Per Fee
Fence
Dgmo
PLUI,IBING PERMIT
Charges and
Surcha rges
Sidewal k
A/C Paving {a./9
ELECTRICAL PERIlIT
Charges and
Surcha rges Total Comb. Permit
Curb Cut 6r, f6TOTAL
T,IECHANICAL PERMIT
Charges and
Surc harges
TOTAL VALUATION
(
city fi^ffu, ?k1lvo"
fnhdi$u'rcuits
Flood Plain Slories ,/ }ccy Group_Q, __Sq. Ftg.