Loading...
HomeMy WebLinkAboutPermit Building 1996-03-28COMM ERCIAL/ I N DUSTRIAL PERMIT APPLICATION 225 Fitfi Street, Springfield, Oregon 97477 LOCATION OF PRO ASSESSOBS MAP: SPRINGFIELO h, JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 TAX LOT: lal IOWNER ADDRESS: CITY: PHONE STATE: 7 VALUE:NEW - FIEMODEL ADDITION DEMOLISH OTHER DESCRIPTION OF WORK: ot I tiratNte. N4ECHANICAL: ELECTRICAL: NAME ADDRESS PHONE ADDRESS EXPIRES PHONE ARCHITECT: CONTRACTOR'S NAME G ENERAL: CONST. CONTRACTOR # Dr,tn o -/ PLUMBING NO.FEE CHARGE Single Fixture Relocated Bldg. (new fix. addtl) Water Service ft. Sanitary Sewer ft. Storm Sewer ft. Backf low Device TOTAL PERMIT M EC HAN I CAL NO trFtr CHA RGF Furnace/burner & vent <100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - OFFICE USE _ LAND USE: ZONING* OF UNITS: HANDICAP ACCESS: FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER OCCY GROUP: * OF STORIEST QUAD AREA: * OF BLDGS: CONSTR. TYPEr HEAT SOURCE: SQ. FT. att a $/SQ. FT. r{6C sq7 t23 I TOTAL VALUE OF PROJ 30 VALUE X X X SQ. FTG MAIN SO. FTG ACCESS SO. FTG OTHER PLAN CHECK FEE RCPT#DATE BY BUILDING PERMIT \q(\td PLU M BI NG DEMOLITION 5% State Su rcharoe 5% State Su rcharge MECHANICAL u.a?FENCE VALUE $ 5% State Su rcharge SIDEWALK FT, SUBTOTAL PE RM ITS PAVING CURBCUT FT, SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL ( ztP, q? ?7 -7 V REQUIRED INSPECTTONS It is the responsibility of the permit holderto see that all inspections are made at the proper time. To request an inspection, call 726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SpEC1AL INSpECTIONS: ln accordance ELECTRTCAL & and approved. section 306 0f the State specialty code MECHANICAL: To be made a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor during CURTAIN WALLS construction of the following work. A FOOTINGS & FOUNDATIONS: copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division. excavated and forms are facing materials and before erected, ail steel in ptace, but framing inspection' srRUcruRAL CoNCRETE: ln prior to placing concrete. FRAMING: To be made after excess of 2500 P.S.l. (306 a.1) coNcRETE sLAB: To be the roof' all framing' fire made arter a, insrab buirding 3iff5l:.":ff 3l;:It"f,';;:r" EIRS'"Jyf3"t,H5tT',rrr, , service equipment, conduit, and vents are'complete and :#,Tg,i'"'.",:;il:? ?i:',""'5i n:';::Hlt"i;;,1'J#[?:l: Bl?,lfL?=o]?T*.?,o,"'I]X,oin place but before any tightening operations. (306 concrete is placed. INSULATION & VApOR a.6) BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are in place but FIREpROOFING: U.BC.storm sewer, water and before any lath or gypsum Standards 43-8. drainage lines. To be made board interior wall covering is prior to covering or filling applied. SPECIAL GRAD|NG,trenches. electrical, mechanical. To be according to plans. Chapter 29) made prior to installation of floor insulation, decking or LATH ANo/oR GYPSUM GLU'LAM BEAMS: lnspection f loor sheathing. BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency, furnished to the city's posT & BEAM: To be made interiol and exierior, is in Building Division before prior to installation of floor place but before any beams are placed' (2501 u'Bc' insulation, decking or floor plastering is applied or before STDS' 25-1011)' sheathing. gypsum board joints and fasteners are taped and STRUCTURAL MASONRY: (306 FLooR TNSULATIoN & finished' a'7\ VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or rticals in accordance with uBc 2415. ROOF SHEATHING ANO NAILING: Prior to installing any roof covering. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. *ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. ure By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springf ield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all -/, DateSi mes ring co n. RECEIVED BY: DATE PAID: \, VALI toN AMOUNT RECE RECEIPT *: FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL F]RE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot stri ping, etc. must be completed before requesting this i nspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE (