Loading...
HomeMy WebLinkAboutPacket, DRC PLANNER 6/2/2020AGENDA DEVELOPMENT REVIEW COMMITTEE DEVELOPMENTSER VICES DEPARTMENT 225 FIFTH STREET Staff Review: Tuesday, June 16, 2020 9:00 — 10:00 a.m. 1. Site Plan Review 811-20-000099-TYP2 811-19-000291 -PROJI Springfield Utility Board Assessor's Map: 18-02-03-10 TL: 100 Address: Jessica Dr. & S. 60" PI. Existing Use: vacant Applicant submitted plans to construct new water storage reservoir and site improvements Planner: Andy Limbird Meeting: Tuesday, June 16, 2020 9:00 — 10:00 virtual meeting via GoToMeeting 2. Tree Felling Permit 811-20-000100-TYP2 811-19-000291-PROJ Springfield Utility Board Assessor's Map: 18-02-03-10 TL: 100 Address: Jessica Dr. & S. 60" PI. Existing Use: vacant Applicant submitted plans to remove 237 trees to allow for construct new water storage reservoir and site improvements Planner: Andy Limbird Meeting: Tuesday, June 16, 2020 9:00 — 10:00 virtual meeting via GoToMeeting 3. Hillside Development Overlay 811-20-000101-TYP2 811-19-000291-PROJ Springfield Utility Board Assessor's Map: 18-02-03-10 TL: 100 Address: Jessica Dr. & S. 60" PI. Existing Use: vacant Applicant submitted plans to construct new water storage reservoir and site improvements Planner: Andy Limbird Meeting: Tuesday, June 16, 2020 9:00 — 10:00 virtual meeting via GoToMeeting The Complete DRC Packet for this meeting is available online for you to review or print out from the laserfiche website: httD://www.sprinafield-or.aov/weblink8/browse.ascx VICINITY MAP 811-20-000099-TYP2 Site Plan Review 18-02-03-10 TL 100 S. 66" Pl. & Jessica Dr. Springfield Utility Board City of Springfield Development Services Department 225 Fifth Street Springfield, OR 97477 Site Plan Review SPRINGFIELD WAV, Application Type (Applicant: check one) Site Plan Review Pre -Submittal: ❑ Major Site Plan Modification Pre -Submittal: ❑ Site Plan Review Submittal: Ma'or Site Plan Modification Submittal: LJ I Required Project Information (Applicant. complete this section) Applicant Name: Steven Wages Phone: (541) 726-2396 Company: Springfield Utility Board Email:stevenw@subutil.com Address: 202 South 18th Street, Springfield, OR 97477 Applicant's Rep.: Richard M. Satre, AICP, ASLA, CSI Phone: (541) 686-4540 Company: Schirmer Satre Group Email•rick@schirmersatre.com Address: 375W 4th Avenue, Suite 201, Eugene, OR 97401 Property Owner: Springfield Utility Board Phone: (541) 726-2396 Company: Springfield Utility Board Email•stevenw@subutil.com Address: 202 South 18th Street, Springfield, OR 97477 ASSESSOR'S MAP NO: 18-02-03-10 TAX LOT NOS : 00100 Property Address: No site addresses for the Tax Lot Size of Property: 11.02 Acres 0 Square Feet ❑ Proposed No. of . None Proposed Name of Project: SUB South Hills 4th Level Reservoir Description of If you are filing In this form by hand, please attach your proposal description to this application. Pro osal Construct a water storage reservoir and associated site improvements Existing Use: Vacant Tax Lot New Impervious Surface Coverage (Including Bldg. Gross Floor Area): sf Si natures: Please sign and Drint your name and date in the aggrogriate Required Project Information (City Intake Staff., Associated Applications: box on the nexta e. complete this section) Signs: Pre -Sub Case No.: Date: Reviewed by: Case No.: Date: Reviewed b 811-20-000099-TYP2 06/01/2020 Application Fee: $Technical Fee: $ 257.30 Postage Fee: $ 190 5146.00 5593.30 TOTAL FEES: $ PROJECT NUMBER: 811 -19 -000291 -PROD Revised 1/7/14 KL 101`11 May 5, 2020 SPRINGFIELD UTILITY BOARD SOUTH HILLS 4T" LEVEL RESERVOIR Site Plan Review Map 18-02-03-10, Lot 100 WRITTEN STATEMENT In accordance with Site Plan Review submittal requirements, this written statement describes the proposed development and demonstrates that the proposal complies with the standards and criteria contained in SDC 5.17-100 through 5.17-125. The proposal is submitted concurrently with a Hillside Development Overlay District application, and a Tree Felling Permit application. We request that these applications be processed concurrently. I. LAND USE REQUEST A. Development Objective The applicant's objective is to construct a newwater storage reservoir near its existing South Hills Reservoir Site to serve future single-family homes in the MountainGate subdivision and elsewhere. Subject Property RLIO Maps 2018 B. Land Use Request In accordance with the results of a Development Issues Meeting the applicant held with the City of Springfield on December 19, 2019 (See City of Springfield Jo. No. 811 -19 -000285 -PRE), accomplishing the development objective will require City of Springfield approval of three land use applications: Site Plan Review, Hillside Development Overlay District, and Tree Felling Permit. Although relating to the same project, each of these have been generated as a complete, stand-alone application including application form, city fee, written statement with findings demonstrating compliance with applicable criteria, exhibits and plans. While each of these is to receive its own decision, to ease the overall process, these three applications are being submitted for concurrent processing. It is intended that this will provide an opportunity for cross- referencing and parallel review and assist the city in rendering a decision. Additional details regarding this proposal are provided on the plans, the remainder of this written statement, and other materials enclosed and attached herewith. + snxoswn.wcxuscn + PLANNERS + LANDSCAPE ARCHITECTS i ENVIRONMENTAL SPECIALISTS 375 Wes_41h, Suite 201, Eugere, OR 9]401 Phone: 541.6861 www, satre®roup. comI I r Springfield Utility Board South Hills 4th Level Reservoir Site Plan Review Map 18-02-03-10, Lot 100 C. Project Directory Owner/Applicant Steven Wages, P.E. Springfield Utility Board 202 South 1 e Street Springfield, OR 97477 Phone: (541) 726-2396 Email: stevenw@subutil.com Planner/Lardscaoe Architect (arid Applicant's Representative) Richard M. Satre, AICP, ASLA, CSI The Satre Group 375 West 4' Avenue, Suite 201 Eugene, OR 97401 Phone: (541) 686-4540 Email: rickftsatregroup.com Sumevpr Dan Nelson, PLS Branch Engineering, Inc 310 5^ Street Springfield, OR 97477 Phone: (541) 746-0637 Email: dannftbranchengineering.com Civil Engineer Tom Boland, P.E. Murraysmith, Inc. 888 S/115^ Avenue, Suite 1170 Portland, OR 97204 Phone: (503) 225-9010 Email: Tom. Boland@murraysmith.us Page 2 of 13 THE SITE AND EXISTING CONDITIONS A. Development Site The 4' Level Reservoir site is located at South 65^ Place and Jessica Drive in the Thurston Hills of Springfield. Lot 100 was in the MountainGate Master Plan, however, Lot 100 was not included in prior MountainGate subdivisions. Lot 100 was in the MountainGate Master Plan a future phase. (The MountainGate Master Plan expired in 2004.) Although once planned for single family homesites, lot 100 is now owned by Springfield Utility Board and, as documented in this land use application, is now planned to be the location for a new reservoir. The reservoir site is forested and is approximately 11.02 acres in size. Access is by way of South 66a' Place. Abutting the site to the north and west is unimproved land which is planned and zoned for low density residential development. Abutting the site to south and east is public land owned by Wllamalane. The Sarre Group - 375 West 0 Avenue, Suile 201, Eugene, OR W401 - (541) 6964540 - ww.v.sarreereun.00m Springfield Utility Board South Hills 4th Level Reservoir Site Plan Review Map 18-02-03-10, Lot 100 B. Planning Context 1. Planning and Zoning Local long-range land use is governed by the Eugene -Springfield Metropolitan Area General Plan (Metro Plan), often supplemented with a more specific refinement plan and/or neighborhood plan, followed by site-specific zoning. Further, zoning can sometimes be comprised of base and overlay zoning. For the reservoir site, the Metro Plan designation is Low Density Residential, there is no applicable neighborhood plan, and the base zoning is Low Density Residential. The Tax Lots to the north were included in the 1995 MountainGate Master Plan. Lot 100 was in the MountainGate Master Plan as a future phase. Page 3 of 13 r_� Springfield Zoning Map September 2018 SUB South Hills 41e Level Reservoir Site Map and Tax Let Acreage Metro Man Oesigra8m Zoning 1602-03-10-00100 11.02 acres Lau Oensiy ResttlentialLau Oensiy Residential (LOR) 2. Transportation a. TransPlan. The metro area adopted transportation plan, The Eugene -Springfield Transportation System Plan (TransPlan), adopted in 2001 and amended in 2002, includes one project in the vicinity of the subject property— Project 36, a future collector connecting Straub Parkway to the west to the general vicinity of the south side of MountainGate Master Plan area. b. Springfield 2035 Transportation System Plan. The City of Springfield's Local Street Network 1 .. diagram shows proposed future streets within Springfield's jurisdiction. The plan is illustrative only and is not parcel specific. Future local streets,their locations and connection points can be adjusted at (` tim a of specific developm ent proposals. -- , Local Street Network Map Except City of Springfield _ August 2018 c. Public Transit. There is no public transit service in the vicinity of the reservoir site. 3. Utilities a. Stormwater and Wastewater. The Springfield Stormwater Facilities MasterPlan shows the property as being within the Jasper-Natron Basin. The Master Plan identifies no capital improvement projects in the vicinity of the project. The site has both stormwater and sanitary infrastructure adjacent to the property in both South 66' Place and Jessica Drive. The Satre Group - 375 West 0 Avenue, Suie 201, Eugene, OR 6/401 - (541) 6864540 - www.setre�roup.00m Springfield Utility Board South Hills 4th Level Reservoir Site Plan Review Map 18-02-03-10, Lot 100 Stornwater Facilities Master Plan City of Spnngfield, October 20D8 Page 4 of 13 b. Wellhead Protection. _ The subject property is not within awellhead protection area, nor are there any protection areas near the subject property. Wellhead Protection Areas Map Excerpt City of Springfield and Spnngfield Utility Board January 2013 `•� c. Water and Electric. The site has both water and electric infrastructure adjacent to the property in both South 66h Place and Jessica Drive. Existing Water Infrastructure Springfield Utility Board, 2019 Existing Electric Infrastructure Springfield Utility Board, 2919 4. Natural Resources a. Springfield Natural Resources Study. The Springfield Natural Resource Study Report does not identify any resources on or near the site that would be impacted by the proposed development. The Satre Group - 375 West 0 Avenue, Suile 201, Eugene, OR 97401 - (541) 6864540 - www.satregreup.c xn Springfield Utility Board South Hills 4th Level Reservoir Site Plan Review Map 18-02-03-10, Lot 100 Page 5 of 13 b. Springfield Wetland Inventory / Water Quality Limited Watercourses (WQLW). Neither the National Wetlands Inventory nor the Local Wetlands Inventory document the presence of jurisdictional wetlands on or adjacent to the subject property. Springfield's Water Quality Limited Watercourses inventory also documents that there are no WQLW features on or adjacent to the subject property. c. Geotechnical Stability. A geotechnical evaluation has been performed forthe 4' Level Reservoir site. The report lists construction, site preparation, and foundation design recommendations. 5. Parks and Open Space a. Wllamalane Park and Recreation Comprehensive Plan. The VNllamalane Comprehensive Plan includes three projects within the vicinity. Project 3.8. Pursue acquisition and development of natural area parks and trail systems along the Thurston Hills ridgeline south of Potato Hill and towards the Jasper-Natron area. (Completed. See Project 4.10.) Project 3.10. Identified in the MountainGate Master Plan, develop a 90 -acre natural area park and trail system on top of Potato Hill. Project 4.10. Acquisition and development of a ridgeline trail in the south Thurston Hills area. (Property has since been acquired.) v; OI 0'i Park and Recreation Projects Map Excerpt Wllamalane Park and Recreation Oidnct October 2012 III. SITE PLAN REVIEW— APPROVAL CRITERIA AND FINDINGS This section is presented in the same order of applicable requirements found in Section 5.17-125, Site Plan Review Criteria of the Springfield Development Code. Applicable sections of the Code are in bold italics, followed by proposed findings in normal text. A. The zoning is consistent with the Illetro Plan diagram, and/or the applicable Reffcement Plan diagram, Plan District rrep, and Conceptual Development Plan. Response: There is no applicable Plan District Map, Conceptual Development Plan, or Refinement Plan for the subject property. The zoning is consistent with the Metro Plan Diagram. The subject property is zoned Low Density Residential and has a Metro Plan designation of Low Density Residential. Mel. Ran Oiagra. 2010 The Sar. Group - 375 Wed 4x Avenue, Suie 201, Eugene, OR 6/401 - (541) 8864540 - w.cw.ser.u.up.co. Springfield Utility Board South Hills 4th Level Reservoir Site Plan Review Map 18-02-03-10, Lot 100 Page 6 of 13 Regarding the Eugene -Springfield Public Facilities and Services Plan, the development proposal is consistent with the following Plan's policies: The Public Facilities and Services Plan notes that SUB will "add an upper level reservoir" on the 4m Level. Special Development Standards for High Impact Public Facilities (SDC 4.7-160 A.) indicates that Discretionary Use is not required if the facility is designated on the Public Facilities and Services Plan. The 4' Level Reservoir is considered a High Impact Public Facility per SDC 6.1-110 and is listed on the Public Facilities and Services Plan. Therefore it the reservoir is a permitted use and a Discretionary Use Permit is not required. Eugene -Springfield Public Facilities and SerNces Plan December 31, 2011 B. Capacity requirements of public and private facilities, including, but not limited to, water and electricity, sanitary sewer and stormwarter management facilities; and streets and trdflic safety controls shall not be exceeded and the public improvements shall be available to serve the site at the time of development, unless otherwise provided for by this Code and other applicable regulations. The Public Works Director or a utility provider shall determine capacity issues. Response: The site is a proposed public utility facility. It is not and will not be inhabited with any dwelling units, offices or other buildings regularly occupied by people. There is no need for the full suite of utility facilities. Nonetheless, public and private facilities are provided as follows: Storm: Public stormwater infrastructure exists in South 66m Place and Jessica Drive adjacent to the subject property. Sanitary: Sanitary infrastructure is adjacent to the site in South 66m Place and Jessica Drive. Water: Water infrastructure is adjacent to the site in South 66m Place and Jessica Drive. Electric: Electric infrastructure is adjacent to the site in South 66m Place and Jessica Drive. Streets: South 66m Place and Jessica Drive are local streets per the TSP. ROW has been dedicated to the Tax Lot. C. The proposed development shall comply with all applicable public and private design and construction standards contained in this Code and other applicable regulations. SDC CHAPTER 3 LAND USE DISTRICTS SDC 3.3-500 HILLSIDE DEVELOPMENT OVERLAY DISTRICT 1. SDC 3.3-510 Applicability The Satre Group - 375 West 0 Avenue, Sure 201, Eugene, OR W401 - (541) 8964540 - ww.v.setregreun.00m Springfield Utility Board South Hills 4th Level Reservoir Site Plan Review Map 18-02-03-10, Lot 100 Page 7 of 13 The HD Overlay District is applied in residential zoning districts above 670 feet elevation or to development areas below 670 feet in elevation where any portion of the development area exceeds 15 percent slope as determined using the slope calculation described in Subsection 3.3-520A. Response: Portions of the development site exceed 15 percent slopes. Therefore, the Hillside Development Overlay District applies. See Hillside Development Overlay District application submitted concurrently with this application. SDC CHAPTER 4 DEVELOPMENT STANDARDS SDC 4.2-120 Site Access and Driveways A. Site Access and Driveways — General. 1. All developed lots/parcels shall have an approved access provided by either direct access to a., a. Public street or alley along the frontage of the property, b. Private street that connects to the public street system; c. Public street by an irrevocable joint use/access easement serving the subject property that has been approved by the City Attorney, where., I. A private driveway is required in lieu of a panhandle driveway,, or ii. Combined access for 2 or more lots/parcels is required to reduce the number of driveways along a street. Response: The subject property receives direct access from South 66th Place (a public street). A gravel access road will extend from the terminus of South 66th Place to the 4th Level Reservoir. B. Driveway access to local streets is generally encouraged in preference to streets of higher classification. Response: The subject property fronts local streets South 66th Place and Jessica Drive. The proposed reservoir will take access from South 66th Place. C. Driveways shall be designed to allow safe and efficient vehicular ingress and egress as specified in Tables 4.2-2 through 4.2-4 and the City's Engineering Design Standards and Procedures Manual and the Public Works Standard Construction Specifications. SDC Table 4.2-2 Driveway Design Specifications 2 -Way Driveway Width — Industrial Required., 24 feet minimum, 35 feet maximum. Transition Width Required., 8 feet minimum, no maximum. Driveway Throat Depth Required., 18 feet Response: A gravel access road with a width of 15 feet will be installed southward into Tax Lot 100. The road will continue to the reservoir site area and provide a safe fire/service turn around area. SDC Table 4.2-3 Curb Return Driveway Design Specifications Response: The access road does not include a curb -return. Thus, this standard does not apply. The Satre Group • 375 West 4" Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 • w ,atreproup.com Springfield Utility Board South Hills 4th Level Reservoir Site Plan Review Map 18-02-03-10, Lot 100 Page 8 of 13 SDC Table 4.2-4 Minimum Separations between a Driveway and the Nearest Intersection Curb Return on the Same Side of the Street* Multifamily Residential Required., Local Street., 150 feet. Response: South 66'^ is a dead end street with its terminus at the subject property. The nearest curb return is at the intersection of South 66'^ and Jessica Drive. The project's access road does not create a driveway. 3. SDC 4.2-1251ntersections Intersections shall be designed and constructed as specified in the City's Engineering Design Standards and Procedures Manual and the following requirements. A. In order to minimize traffic conflicts and provide for efficient traffic signalization, intersections involving curb return driveways and streets, whether public or private, shall be directly opposed, unless a Traffic Impact Study indicates that an offset intersection benefits public safety to a greater degree. Response: The proposed development does not include a curb return driveway. B. Streets shall be laid out so as to intersect as nearly as possible at right angles. The angle of intersection between 2 intersecting streets shall be at least 80 degrees. At intersections, each local street shall be straight or have a radius greater than 400 feet for a distance of 100 feet from each intersection. At intersections, each collector or arterial street shall be straight or have a radius greater than 600 feet for a distance of 100 feet from each intersection. Response: The application does not propose any new streets. 4. SDC 4.2-130 Vision Clearance Response: The proposed development area is not on a corner lot/parcel. SDC 4.2-135 Sidewalks A. Sidewalks and planter strips abutting public streets shall be located wholly within the public street right-of-way, unless otherwise approved by the Public Works Director. B. Sidewalks shall be designed, constructed, replaced or repaired as specified in the City's Engineering Design Standards and Procedures Manual, the Public Works Standard Construction Specifications and the Springfield Municipal Code, 1997. New sidewalk design shall be consistent with existing sidewalk design in the same block in relation to width and type C. Planter strips may be required as part of sidewalk construction. Planter strips shall be at least 4.5 feet wide and long enough to allow the tree to survive. Maximum planter strip width is dependent upon the type of tree selected as specified in the City's Engineering Design Standards and Procedures Manual. Response: There are no existing sidewalks on South 66'^ Place or Jessica Drive. As this proposal does not extend a street or parallel a street, there is no applicable requirement for sidewalks. The Satre Group • 375 West 4" Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 • w ,atreproup.com Springfield Utility Board South Hills 4th Level Reservoir Site Plan Review Map 18-02-03-10, Lot 100 Page 9 of 13 6. SDC 4.2-140 Street Trees B. Existing street trees are to be retained. if removed, they must have a permit to do so and be replaced with a new tree. Response: There are no existing street trees along either South 66th Place or Jessica Drive. There are none to be removed. 7. SDC 4.2-145 Street Lighting Public street lighting design and placement is specified in the City's Engineering Design Standards and Procedures Manual and the Public Works Standard Construction Specifications and is approved by the Public Works Director. A. Street Lighting shall be included with all new developments or redevelopment. Existing street lights shall be upgraded to current lighting standards with all new developments or redevelopment as determined by the Public Works Director. The developer is responsible for street lighting installation costs. Response: The reservoir will take access from the existing end of South 66th Place. The project does not extend a street or parallel a street. The project does not generate a demand for street lights. 8. SDC 4.3105 SanitarySewers A. Sanitary sewers shall be installed to serve each new development within the city limits and to connect developments to existing mains... Response: Existing sanitary infrastructure exists in South 66th Place and Jessica Drive. Thus, sanitary sewer service is available to the subject property. (Although service is available, the proposed development does not need sanitary service and does not plan on extending service into the site.) SDC 4.3110 Stormwater Management B. The approval authority shall grant development approval only where adequate public and/or private stormwater management system provisions have been made as determined by the Public Works Director, consistent with the policies set forth in the Stormwater Management Plan and the Engineering Design Standards and Procedures Manual. The stormwater management system shall be separated from any sanitary sewer system. Surface water drainage patterns shall be addressed on every Preliminary Site Plan, Tentative Partition or Subdivision Plan. C. A stormwater management system shall accommodate potential run-off from its entire upstream drainage area, whether inside or outside the development The Public Works Director shall determine the necessary size of the facility, based on adopted Public Facility Plans and Stormwater Facility Master Plans. The developer shall pay a proportional share of the cost according to adopted City Council policy. D. Run-off from a development shall be directed to an approved stormwater management system with sufficient capacity to accept the discharge. Where the Public Works Director determines that additional run-off resulting from the development will overload an existing stormwater management system, the Approval Authority shall withhold Development Approval until provisions, consistent with the Engineering Design Standards and Procedures manual, have been made to correct or mitigate the condition. Response: There is existing stormwater infrastructure in South 66th Place and Jessica Drive. An on-site stormwater management system will be constructed. Any additional The Satre Group • 375 West 4" Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 • w ,atreproup.com Springfield Utility Board Page 10 of 13 South Hills 4th Level Reservoir Site Plan Review Map 18-02-03-10, Lot 100 May 5. 2020 stormwater runoff from the development site will not exceed the carrying capacity of the system. See accompanying Stormwater Management Plan and plan set for additional information. E. Any development with a stormwater threshold management requirement of 1,000 square feet of impervious surface area shall be required to employ stormwater management practices consistent with the Springfield Engineering Design Standards and Procedures Manual, which minimize the amount and rate of surface water runoff into receiving streams. Response: The onsite storm water system will include storm water management practices consistent with the Springf eld Engineering Design Standards and Procedures Manual. F. Identification of Water Quality Limited Watercourses. Response: There are no Water Quality Limited Watercourses on the development site. Therefore, this standard does not apply. G. Protection of Riparian Area Functions. Response: There are no Water Quality Limited Watercourses on the development site, therefore there are no riparian areas to protect. This standard does not apply. 10. SDC 4.3-125 Underground Placement of Utilities; and SDC 4.3-130 Water Service and Fire Protection Response: New utilities associated with the project will be placed underground. Water services is available from South 66" Place and Jessica Drive. An existing fire hydrant is located on the north side of Jessica near the southwest corner of Tax Lot 302. 11. SDC 4.3-140 Public Easements A. Utility Easements. The applicant shall make arrangements with the City and each utility provider for the dedication of utility easements necessary to fully service the development or land beyond the development area as necessary. The minimum width for public utility easements adjacent to street rights-of-way shall be 7 feet. The minimum width for all other public utility easements shall also be 7 feet. However, the utility provider or the Public Works Director may require a larger easement for major water mains, major electric power transmission lines... or in any other situation to allow maintenance vehicles to set up and perform the required maintenance or to accommodate multiple utility lines. Where feasible, utility easements shall be centered on a lot1parcel line. Response: A number of easements are already in existence related to adjacent property. Should additional easements be required, the applicant shall make arrangements as needed. 12. SDC 4.4-105 Landscaping A. Three types of landscaping may be required., 1. Landscaping standards for private property as specified in this Section and other Sections of this Code. 2. Street trees in the public right-of-way as specified in Section 4.2-140. 3. Curbside planter strips in the public right-of-way as specified in 4.2-135. B. Unless otherwise specified in this Code all required setback areas and parking lot planting areas shall be landscaped. The Satre Group • 375 West 4" Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 • w ,atreproup.com Springfield Utility Board South Hills 4th Level Reservoir Site Plan Review Map 18-02-03-10, Lot 100 Page 11 of 13 Response: Interior to the reservoir site, there will be some disturbed areas as the reservoir, staging area, access road, and utility infrastructure is constructed. These areas will be landscaped with a grass that is drought resistant and doesn't need irrigation. A minimum of 65% of required planting areas will be covered with living plant material within 5 years of installation. There will be some areas of tree removal. See Tree Felling Plan and the Tree Felling Permit. These will be interior to the site, where the reservoir, access road, and staging area will be constructed. These areas will be visible to adjacent properties or the street and no new trees will be installed. 13. SDC 4.4-110 Screening; and SDC 4.4-115 Fencing A. Screening shall be required 1. Where commercial and industrial districts abut residential districts and no approved screening exists; 2. For outdoor mechanical devices and minor and major public facilities; 3. For outdoor storage areas abutting residential districts; 4. For trash receptacles. Response: The development is in a residential district. There are no proposed outdoor mechanical devices. There are no outdoor storage yards or areas. There are no trash receptacles proposed. However, the substation is a major public facility and screening is required. Screening, in this instance, will be provided by the existing dense wooded forest located between the reservoir site and adjacent properties. B. Screening shall be vegetative, earthen and/or structural and be designed to minimize visual and audible incompatible uses from adjacent properties... 1. Structural screening shall be a fence or masonry wall constructed to provide a uniform sight -obscuring screen. Response: A 8' tall chain link fence with 3 strands of barbed wire will surround the perimeter of the reservoir site proper. The existing dense wooded nature of the site will provide screening. 14. SDC 4.5-100 On -Site Lighting Standards; and SDC 4.5-110111umination and Height A. On-site lighting shall be the minimum illumination necessary for a given application including parking areas and vehicle sales areas. All exterior light fixtures shall be shielded or recessed so that direct glare and reflection are contained within the boundaries of the property, and directed downward and away from abutting properties; public rights-of-way; and riparian, wetlands and other protected areas identified in this Code on the same property. B. Height. 1. The height of a free standing exterior light fixture shall not exceed 25 feet or the height of the principal permitted structure, whichever is less. In this case, height is measured as the vertical distance between the paved surface and the bottom of the light fixture. Response: Lighting is limited to wall mounted lights on the reservoir's telemetry building. See plans. 15. SDC 4.6-100 Vehicle Parking, Loading and Bicycle Standards. The Satre Group • 375 West 4" Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 • w ,atreproup.com Springfield Utility Board South Hills 4th Level Reservoir Site Plan Review Map 1602-03-10, Lot 100 Page 12 of 13 Response: • Vehicle Parking —This is a major public utility facility. It is not open to the public. There are no customers or visitors. The only vehicles that will be accessing the site will be maintenance and repair vehicles from the utility facility owner. There is no parking needed. Thus, this standard does not apply. • Loading Areas —The need isn't so much for loading areas as it is for staging areas for on-site work activity. In this regard, a gravel surface area is provided around the perimeter of the reservoir. These areas meet or exceed the minimum width of 10 feet, minimum length of 25 feet and minimum clear vertical height of 14 feet. In this regard, this standard is met. • Bicycle Parking —This facility is not open to the public. Individuals accessing the site will be utility employees in maintenance and repair vehicles. Thus, this standard does not apply. D. Parking areas and ingress -egress points have been designed to., facilitate vehicular traffic, bicycle and pedestrian safety to avoid congestion; provide connectivity within the development area and to adjacent residential areas, transit stops, neighborhood activity centers, and commercial, industrial and public areas,, minimize driveways on arterial and collector streets as specified in this Code or other applicable regulations and comply with the ODOT access management standards for State highways. Response: The facility does not front on or take access from an ODOT facility or a collector or arterial street (South 66' Place and Jessica Drive are local streets). The proposed access road meets intersection standards. Bicycle and transit facilities do not exist in the immediate neighborhood and no demand for such will be generated by this development. E. Physical features, including, but not limited to: steep slopes with unstable soil or geologic conditions; areas with susceptibility of flooding, signiticant clusters of trees and shrubs; watercourses shown on the WQLW Map and their associated riparian areas; other riparian areas and wetlands specified in Section 4.3-117, rock outcroppings; open spaces; and areas of historic and/or archaeological significance, as may be specitred in Section 3.3-900 or ORS 97.740-760, 358.905-955 and 390.235-240, shall be protected as specified in this Code or in State or Federal law. Response: Of the physical features listed in this criterion, the following features and how the proposal addresses those is as follows: • Steep Slopes with unstable soil orgeologic conditions. There are steep slopes on the site. A copy of the geotechnical report is included in the application packet. • Areas with susceptibility of flooding. There are no areas susceptible to flooding. • Significant clusters of trees and shrubs. There are trees on the property. Trees that have been surveyed are shown on the plan set. Trees to be removed are shown on the plan set. A significant portion of the subject property will not be disturbed. Of the disturbed interior of the site, native grasses will be planted. The site has an existing densely wooded area and has a'community forest' (owned by Wllamalane) to its south and east. This natural area will also act as a vegetative screen for the property. See plan set. • Watercourses shown on the WQLW Map and their associates riparian areas. There are no watercourses on the site. • Other riparian areas and wetlands. There are no riparian areas or wetlands. • Rock outcroppings. There are no areas of rock outcroppings • Open spaces. As it is defined in the Springfield Development Code, there are no open spaces on the site. The Sarre Group - 375 West 0 Avenue, Suie 201, Eugene, OR W401 - (541) 6964540 - ww.v.serreereun.00m Springfield Utility Board South Hills 4th Level Reservoir Site Plan Review Map 18-02-03-10, Lot 100 Page 13 of 13 • Areas of historic and/or archeological significance. There are no known historic or archeological areas on the site. IV. Conclusion The above information represents known applicable planning, zoning and site development requirements for the contemplated project. It presents known physical conditions and contexts. It captures the project's primary development objective. Based on the information and findings contained in this written statement, associated exhibits and plan set the proposed SUB 4' Level Reservoir project meets the criteria of approval contained in the Springfield Development Code. Therefore, the applicant requests that the City of Springfield approve the proposal. If you have any questions about the above application, please do not hesitate to contact Rick Satre at The Satre Group, 541-686-4540, or rickasatreoroup.com. Sincerely, Rech wdlM. Satre. Richard M. Satre, AICP, ASLA, CSI President The Satre Group The Salre Group - 375 West 0 Avenue, Suie 201, Eugene, OR W/ l - (541) 6964540 - ww.v.salreereue.00m