Loading...
HomeMy WebLinkAboutPermit Mechanical 1998-06-01SPRINGFIELDRESIDENTIAL PERMIT APPLICATION JOB NUMBERUsk Inspections: 726.m3769 � 225 Fifth Street Office: 726.3759 � Springfield, Oregon 97477 LOCATION OF PROPOSED WORK:...� ASSESSORS MAP: '� ` � �oe3 _ TAX LOT: � ?Osorv�"'� LOT' BLOCK: IN-OWANI_ ME&ENEENEI SUBDIVISION: 4EMPEI OWNER: C �P�fa-.. PH NE: ���DCt O dF ADDRESS: CITY: S D S-� STAT E ZIP: DESCRIBE WORK:....07VI^��� � � a���' � amp., C � rt_ D�C � i�wtc f� � Y�'d� C C em'TC � NEW REMODEL ADDITION DEMOLISH l� qt,s Ile CONST. CONTRACTOR'S NAME ADDRESS CONTRACTOR # EXPIRES PHONE GENERAL: - —-- N C W V� S PLUMBING: MECHANICAL: �a« k4 \� -H' Ltl � . T _ t PA C S (Irl �) C ELECTRICAL: W4 zS0I7t(?SEEN � i —OFFICE USE — QUAD AREA,* LAND USE: _. FLOOD PLAIN., x OF BLDGS. # OF UNITS: _ ZONING CODE: _ OCCY GROUP: _ CONSTR. TYPE: # OF BDRMS: # OF STORIES:- HEAT SOURCE; _ SECONDARY HEAT: WATER HEATER; _ RANGE: SQUARE FOOTAGE' To request an inspection; 41 ��ou must cal! 726-3769. T,�.'%!Is Is a 2.4 howv- recordl��g. All 'nspe�tions requested before 7:00 a.m, will be made the same working day, Inspections requested after 7,-00 a.m. will be made the following work day. REQUIRED INSPECTIONS Temporary Electric � Rough Mechanical —Prior to � Final Plumbing When all e��-+� Plumbing work is complete. Site Inspection — To be made � Rough Electrical — Prior to a Final Electrical —When all fter excavation a, but prior to cover., electrical work is complete. setting forms. p Underslab Plumbing/ Electrical/ � Electrical Service —Must be � Final Mechanical —When all Mechanical —Prior to cover.hanicalapproved to obta(n permanent work Is complete. electrical power. Footing —After trenches are � Final Building When all excavated. � Fireplace —Prior to facing required Inspections have been materials and framing Insp. approved and building is Masonry �- Steel location, bond completed, beams, grouting. El Framing —Prior to cover. Foundation —After forms are � OtherEl. erected-but prior to concrete Wall/Ceiling Insulation —Prior to �/WPM ��placement., � cover. Underground Plumbing —Prior Drywall —Prior to taping. to filling trench. MOBILE HOME INSPECTIONS Underfloor Plumbing/ Mechanical Wood Stove —After installation. — Prior to insulation or decking. Post and Beam —Prior to floor D Blocking and Set-UpWhen all insulation or decking. � Insert —After fireplace approval blocking Is complete. and Installation of unit. WWI Lot faces Lot Type _ Setbacks ;HE PROPOSED WORK tN THE _ Lot sq. ftg. Interior P.L. HSE �R ACC HISTORICAL DISTRICT, OR ON � THE HISTORICAL REGISTER'? Lot coverage C orner N If yes, this application must be signed To pography Panhandle S and approved by the Historical Coordinator prior to permit issuance. Total height Cul-de-sac W E APPROVED: BUILDING PERMIT � BUILDING VALUE, PLAN CHECK ITEM SQ. FT., X $/SQ. FT. = VALUE AND BUILDING PERMIT Main This permit is granted on the express -condition that the said construction shall, in all respects, conform to the Ordinance Garage ' adopted by the City of Springfield, including the Development Code, regulating the construction and use of Carport _ _ buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plan Check Fee: Date Paid: Total Value Receipt Number. _ Building Permit Fee _ Received By: State Surcharge _ Total Fee (A) _ _ Plans Reviewed By � Date SYSTEMS DEVELOPMENT CHARGE (SDC) Systems Development Charge is due on all undeveloped (B) properties within the City limits whicr are being improved. PLUMBING PERMIT ADDITIONAL COMMENTS ITEM FEE Fixtures Residential Bath(s) N' Sanitary Sewer - FT. Water FT. Storm Sewer FT. WEI Mobile Home EI Plumbing Permit State Surcharge Total Charge (G) MECHANICAL PERMIT Furnace Exhaust Hood By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify iMee�-8t6v'T/Insert/Fireplace Unit 4� � that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws dryer Vent — of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. Mechanical Permit t:9 I further certify that only contractors and employees who Issuance ^_�Q. are in compliance with ORS 701.055 will be used on this .�OState Surcharge �"'� project. Total Permit (p) . tr= dt;o I further agree to ensure that all required inspections are requested at the proper time ', that each address is readable MISCELLANEOUS PERMITS from the street, that the permit card Is located at the front Mobile Home of the properly, and the approved set of plans will remain State Issuance on the site at all mes during construction. � t State Surcharge Signature f�iAA.JI