Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Application APPLICANT 4/30/2020
City of Springfield Development & Public Works 225 Fifth Street Springfield, OR 97477 Land Division Tentative Plan Partition, Subdivision SPRINGFIEL/D� Application16, Type (Applicant: Partition Tentative Pre -Submittal: ❑ Subdivision Tentative Pre -Submittal: ❑ Partition Tentative Submittal: ❑ Subdivision Tentative Submittal: Required.. ete this section) cc,�I� Applicant Name:1A 1A a�tr R6� Phone: -,- 44-e o -072 . Company: Fax: Address: 1Sq5`i^ V Loo eVl� Or�- 617401 I' Applicant's Rep.: c-/(��(J+ "UN,VI �jt,l! eS A Phone: 54-1- 5- Company: P06IIVl CY VL. Fax: 541-4£15-5x1; k a5a 7 V) C- 74-02- Address:C 6a - Property Owner: (. V Phone: Company: Fax: Address: ASSESSOR'S MAP N0:J?)-0Z-C)5-l2- TAX LOT NOS : 2-100 Property Address: 4B3UV1kni.5 7 Size of Property: , q Acres Square Feet ❑ Proposed Name of Subdivision: (d � 6 lets Description of if you are filling in this form by hand, please attach your proposal description to this application. Proposal: Existing Use: # of Lots/Parcels: Total acreage of parcels/ allowable density: Proposed # Dwell units Si natures: Please si nand rint our name and date in the appropriate Required Project Information (City Intake Staff., Associated Applications: box on the next a e. complete this section) Signs: Pre -Sub Case No.: Date: Reviewed by: Case No.: Date: Reviewed b : Application Fee: Technical Fee: $ Posta a Fee: $ TOTAL FEES: PROJECT NUMBER: Revised 1/7/14 kl 1 of 10 Owner Signatures This application form is used for both the required pre -submittal meeting and subsequent complete application submittal. Owner signatures are required at both stages in the application process. An application without the Owner's original signature will not be accepted. Owner: ittal The undersigned acknowledges that the information in this application is correct and accurate for scheduling of the Pre- Submittal Meeting. If the applicant is not the owner, the owner hereby grants permission for the applicant to act in his/her behalf. I/we do hereby acknowledge that I/we are legally responsible for all statutory timelines, information, requests and requirements conveyed to my representative. Date: Signature I represent this application to be complete for submltnl to the City. Consistent with the completeness check performed on this application at the Pre -Submittal Meeting, I affirm the information identified by the City as necessary for processing the application is provided herein or the information will not be provided if not otherwise contained within the submittal, and the City may begin processing the application with the information as submitted. This statement serves as written notice pursuant to the requirements of ORS 227.178 pertaining to a complete application. "05 Date: Signature f nV -__Waj n leu Print Revised 1/7/14 kl 2 of 10 ENGINEERING& SURVEYING, INC. Tentative Subdivision Application for Goldfinch Glen NW '% Section 5, T 18 S, R 2 W W.M. Assessor's Map No. 18-02-05-12 TL No. 2100 Springfield, Lane County, Oregon April 24, 2020 Project Narrative The applicant is proposing an in -fill development creating 6 lots within the subjectproperty shown as Tax Lot No. 2100 on Lane County Assessor's Map No. 18-02-05-12 and being commonly known as 4683 Union Terrace in Springfield Oregon. The subject property is approximately 0.9 acres in size and is zoned LDR, low density residential. The applicant is proposing to create a potential for 7 dwelling units which translates to a density of 8 units per acre. Per 3.2-205(A)(1) the LDR has a density range of 6-14 units per acre. The proposed development is in compliance with the density requirements of the underlying LDR zone. The site has frontage on Union Ave. along its entire northern boundary and approximately 84 feet of frontage on Union Terrace at the northeast corner of the property. The applicant is proposing to create a total of six lots that will front onto Union Avenue. Lot 1 will have approximately 59.4 feet of frontage on Union Avenue. Lot 2 will have approximately 59.2 feet of frontage on Union Avenue and 84 feet of frontage on Union Terrace. Lots 3-6 will access Union Avenue via a 20' paved private access drive. In accordance with SDC 3.2-220(3)(2), the access drive will be contained within a private 30.0 foot joint access and utility easement that will provide pedestrian and vehicular ingress and egress to and from the aforementioned lots, as well as providing for the orderly extension of private utilities to serve the aforementioned lots. These lot frontages either meet or exceed the lot frontage standards for LDR zoned property listed in SDC 3.2-215. Lot 1 fronts on an east/west street and contains 4,787 sq. feet which exceeds the minimum lot area requirement of 4500 sq. ft. for lots fronting on an east/west street as listed in SDC 3.2-215. Lot 2 is a corner lot with 59 feet of frontage on Union Avenue, an east/west street, and 84 feet of frontage on Union Terrace, a north/south street. Lot 2 will contain 6220 sq. ft. which exceeds the minimum lot area required for lots that front on either an east/west street or a north/south street shown in SDC 3.2-215. Lot 2 is a comer lot and also exceeds the minimum lot size needed to be classified as a duplex lot under SDC 3.2-215. The private access drive could be considered a north/south street. Lots 3-6 are all in excess of 6000 sq. ft., which exceeds the minimum lot area requirement of 5000 sq. ft. for lots fronting on a north/south street specified in SDC 3.2-215. C[M 1AV 0A%=ALEIMMERING SURVEYING P.O. BOX 2527 EUGENE, OR 974020152 990 OBE ST. 541/485-4505 FAX 541/485-5624 WWW.POAG&.NET arw�TYPE II TENTATIVE LAND DIVISION, � PRE -SUBMITTAL CHECKLIST Project Name: Goldfinch Glen Project Proposal: 6 -lot Residential Subdivision Case Number: 811 -20 -00039 -PRE Project Address: 4683 Union Terrace Assessors Map and Tax Lot Number(s): Map 18-02-05-12, Tax Lot 2100 Zoning: Low Density Residential (LDR) Metro Plan Designation: Low Density Residential (LDR) Overlay District(s): N/A Applicable Refinement Plan: East Main Refinement Plan Pre -Submittal Meeting Date: February 25, 2020 Application Submittal Deadline:.1=,('2020 Associated Applications: N/A Refinement Plan Designation: LDR R6DJoEv`E POSITION REVIEW OF NAME -;:.,,,, PHONE Project Planner Land Use Planning Melissa Carino 541.744.4068 Transportation Planning Engineer Transportation Michael Liebler 541.736.1034 Public Works Civil Engineer Utilities Clayton McEachern '541.736.1036 Public Works Civil Engineer Sanitary/Storm Sewer Clayton McEachern 541.736.1036 Deputy Fire Marshal Fire and Life Safety Eric Phillips -Meadow 541.682.5741 Building Official Building Robert Castile 541.726.3666 Applicant Tanager Properties, LLC 1593 Larkspur Loop Eugene, OR 97401 541.520.0725 Revised 10/22/18 Applicant's Representative Jonathon Oakes, Poage Engineering PO Box 2527 Eugene, OR 97402 TENTATIVE LAND DIVISION APPLICATION PRE -SUBMITTAL CHECKLIST PLANNING o Application Fee discuss the applicable fees - Subdivision (LDR) Tentative Plan= ($6,726 + ($289/1ot x 6 lots) app fee) + (5% tech fee) + ($190 postage fee) = $9,073.00 - Subdivision (LDR) Plat= $930+ ($580/lot x 6lots) + (5% tech fee) = $4,630.50 - Tre_,&1MA o One additional copy of the Land Division Plan reduced to 8%"x 11" Complete Incomplete See Planning��) RR�� Note(s) to El 8 W' x 11" Copy of Land Division Plan o Copy of the deed and a preliminary title report issued within the past 60 days documenting ownership and listing all encumbrances. If the applicant is not the property owner, written permission from the property owner is required. Complete Incomplete See Planning Note(s) 1 Deed and Preliminary Title Report o Tentative Land Division Plan Complete Incomplete See Planning FJ Note(s) Prepared by an Oregon Licensed Land Surveyor in accordance with ORS 92 El 0 1 All existing and proposed easements El M 3 Dimensions and size of each parcel and the approximate dimensions of each building site indicating the top and toe of cut and fill slopes to scale 4 Location, widths and names of all existing and proposed streetsalleys, dedications or other right- of-ways within or adjacent to the proposed land division F 5 Location of existing and required traffic control devices fire hydrants, power poles, transformers, neighborhood mailbox units and similar public facilities p 6 Location and width of all existing and proposed FJ sidewalks sidewalk ramps, pedestrian access ways and bike trails 7 Location, size and type of plantings and street trees in any required planter strip s Location and size of existing and proposed utilities on and adjacent to the site including sanitary sewer mains, stormwater management systems, water mains, power, gas, telephone, and cable N. Indicate the proposed connection points. o Phased Development Plan required if redivision is proposed. The plan must include the boundaries and sequencing of each proposed redivision. Any redivision must progress in a sequence promoting street connectivity between the various phases of the development and accommodating other required public improvements. Complete Incomplete See Planning Notes) E N/A Phased Development Plan Planning Notes: 1. At submittal, be sure to include a title report dated within 30 days of application submittal. 2. The existing easement listed on the title report is not shown on plans. Please also mark public utility easements (PUE) that is at least 7' wide along street frontages: 3. Dimensions are provided for each lot both on the plans and in the narrative. However, the approximate dimensions of each building site indicating the top and toe of cut and fill slopes to scale are not shown. 4. Please show the location of existing and required traffic control devices (e.g. no parking signs for shared driveway), and neighborhood mailbox units and similar public facilities. 5. Show location and width of all existing and proposed sidewalks. ZA Show location, size and type of plantings and street trees in any required planter strip along fL( Union Street and Union Terrace. 7. All proposed utility connections and one stormwater facility are shown. Other stormwater facilities? Has applicant been in touch with SUB Water & Electric already? All overhead lines will need to be undergrounded as per SDC standards. Additional comments not related to the completeness of the application: • Confirmation: Is the plan to construct a duplex on Lot 2 to meet density? (gross density= 6lots, 7 dwelling units = 8 units/acre) o x-1,14 ftj4ind • Transportation: are there too many driveways close to intersections? • All utilities provided to serve the subdivision will need to be placed underground. • It would be wise to include sample plot plans for streetside and panhandle lots to explore to provision of all public infrastructure. TENTATIVE LAND DIVISION APPLICATION PRE -SUBMITTAL CHECKLIST Date: February 25, 2020 File Number: 20 -000039 -PRE / 20-000041-PRO3 Address: 4683 Union Terrace Proposal: 6 -lot Subdivision Planner: Melissa Carin"o Deputy Fire Marshal: Eric Phillips -Meadow FIRE COMMENTS o Tentative Land Division Plan Complete Incomplete See Fire Note(s) El 0 1, 2, 3, Location, widths and names of all existing and 4 proposed streets, alleys, dedications or other right-of- ways within or adjacent to the proposed land division E ❑ Location of existing and required fire hydrants Fire Notes: 1. The proposed plans indicate a 16' radius connecting Union Ave. with the proposed subdivision access road. Minimum turning radii for fire apparatus access roads are 30' (inside) and 50' (outside). 2. A fire apparatus access road shall extend to within 150 feet of all ,portions of the exterior walls of the first story of future buildings, as measured by an approved route around the exterior of the building facility. If the access road is a dead end and greater than 150 feet long, an approved fire apparatus turn around is required. The proposed subdivision access road is greater than 150' from the Union Ave. In order to not need a fire apparatus turn around on this road, the future houses on lots 5 and 6 will need to be located such that their most remote corners are not greater than 150 feet (as measured around the house) to a point on the new access road 150 feet from Union Ave. 3. Fire access roads shall be capable of supporting and imposed load of fire apparatus weighing at least 80,000 pounds. SFC D102.1 and Springfield Fire Code Amendments 4. "NO PARKING -FIRE LANE" signage shall be posted on both sides of the proposed 20' wide road. SFC D103.6 Additional comments not related to the completeness of the application: Fire Hydrant 766 is shown on the site plan. A fire flow of 1,000 gallons per minute (at a residual pressure of 20 psi) is required for new houses. Verify the existing fire hydrant will provide this minimum required fire flow. LAND DIVISION TENTATIVE PLAN APPLICATION PRE -SUBMITTAL CHECKLIST Engineer: Clayton McEachern Case#:20-39-PRE PUBLIC WORKS ENGINEERING o Site Assessment of Existing Conditions Complete Incomplete See PW Note(s) E ❑ El 0 n/a n n/a [] ❑ n/a El ►/ ■ Revised 10/25/07 Prepared by an Oregon licensed Landscape Architect or Engineer Vicinity Map The name, location, and dimensions of all existing site features including buildings, curb cuts, trees, and impervious surface areas, clearly indicating what is remaining and what is being removed. For existing structures to remain, also indicate present use and required setbacks from proposed property lines The name, location, dimensions, direction of flow and top of bank of all watercourses and required riparian setback that are shown on the Water Quality Limited Watercourse Map on file in the Development Services Department The 100 -year floodplain and floodway boundaries on the site, as specified in the latest adopted FEMA Flood Insurance Rate Maps or FEMA approved Letter of Map Amendment or Letter of Map Revision The Time of Travel Zones, as specified in SDC 3.3-200 and delineated on the Wellhead Protection Areas Map on file in the Development Services Department Physical features including, but not limited to trees 5" in diameter or greater when measured 4 yz feet above the ground, significant clusters of trees and shrubs, riparian areas, wetlands and rock outcroppings Soil types and water table information as mapped and specified in the Soils Survey of Lane County. A Geotechnical Report prepared by an Engineer must be submitted concurrently if the Soils Survey indicates the proposed development area has unstable soils and/or a high water table o Land Division Tentative Plan Complete Incomplete See PW El 0 2 Location of existing and required power poles, transformers, neighborhood mailbox units, and similar public facilities �] 3 Location and size of existing and proposed utilities on and adjacent to the site including sanitary sewer mains, stormwater management systems, water mains, power, gas, telephone, and cable TV. Indicate the proposed connection points o Stormwater Management Plan Complete Incomplete See PW 13 Note(s) Q ❑ n/a i 0 Prepared by an Oregon licensed Civil Engineer Planting plan prepared by an Oregon licensed Landscape Architect where plants are proposed as part of the stormwater management system Roof drainage patterns and discharge locations Pervious and impervious area drainage patterns The size and location of stormwater management systems components, including but not limited to: drain lines, catch basins, dry wells and/or detention ponds; stormwater quality measures; and natural drainageways to be retained Existing and proposed spot elevations and contours lines drawn at 1 foot intervals (for land with a slope over 10 percent, the contour lines may be at 5 foot intervals) Amount of proposed cut and fill o Stormwater Management System Study - provide four (4) copies of the study with the completed StormwaterScoping Sheet attached. The plan, calculations, and Revised 10/25/07 Note(s) Q Prepared by an Oregon licensed Land Surveyor in accordance with ORS 92 Q 1 Location and width of all existing and proposed easements on and abutting the property 0 ❑ Boundaries of the entire area owned by the property owner, of which the proposed land division is a part, as well as dimensions and size of each parcel and the approximate dimensions of each building site indicating the top and toe of cut and fill slopes to scale El 0 2 Location of existing and required power poles, transformers, neighborhood mailbox units, and similar public facilities �] 3 Location and size of existing and proposed utilities on and adjacent to the site including sanitary sewer mains, stormwater management systems, water mains, power, gas, telephone, and cable TV. Indicate the proposed connection points o Stormwater Management Plan Complete Incomplete See PW 13 Note(s) Q ❑ n/a i 0 Prepared by an Oregon licensed Civil Engineer Planting plan prepared by an Oregon licensed Landscape Architect where plants are proposed as part of the stormwater management system Roof drainage patterns and discharge locations Pervious and impervious area drainage patterns The size and location of stormwater management systems components, including but not limited to: drain lines, catch basins, dry wells and/or detention ponds; stormwater quality measures; and natural drainageways to be retained Existing and proposed spot elevations and contours lines drawn at 1 foot intervals (for land with a slope over 10 percent, the contour lines may be at 5 foot intervals) Amount of proposed cut and fill o Stormwater Management System Study - provide four (4) copies of the study with the completed StormwaterScoping Sheet attached. The plan, calculations, and Revised 10/25/07 documentation must be consistent with the Engineering Design Standards and Procedures Manual. Complete Incomplete See PW Note(s) _�_ ❑ 5 Scoping Sheet and attached Stormwater Management System Study PIN Notes; 1. a 7' PUE will be required along both frontages of Union Terrace 2. a location for the transformer and mailbox will need to be determined and included in easement if not already. 3. To install the sewer service as shown will require a PIP for the sewer 4. A stormwater report for the sizing of the infiltration planter will be required and sizing for each lot with a maximum impervious area listed and drywell size included. At least two infiltration test required, one for the driveway treatment area and at least one on a lot area some distance away from the first test. each lot will need to have a footprint of the proposed maximum impervious area and a drywell area shown that meets all setback requirements. 5. Scoping sheet filled out and returned with this response Additional comments not related to the completeness of the application; • it may be desirable to move the Infiltration planter for the driveway and house runoff from that lot may be combined as it will be a private facility. • A sidewalk and roadside swale will be required for union terrace. This will require the complete removal of the existing hedge • A new light will be required to be install on the existing pole at the corner of 4645 Union Terrace and this lot. • The driveway(s) for Lot 2 will need to go either to the panhandle driveway or the short leg of Union Terrace to the East • The radius on the panhandle driveway does not appear to be sufficient for FD access from Union Terrace • An overflow is shown on the infiltration planter, not sure whre this will be going as there is no public system here. Revised 10/25/07 1. Y LAND DIVISION TENTATIVE PLAN APPLICATION PRE -SUBMITTAL CHET Transportation Engineer/ Planner: Michael LiebJ r C e#: 20-000039 Applicant: Tanger TRANSPORTATION Right -of -Way Approach Permit application must be provided where the property has frontage on a Lane County or an Oregon Department of Transportation (ODOT) facility. Complete Incomplete See Transportation Note(s) NA Copy of ROW Approach Permit Application Traffic Impact Study - four (4) copies of a study prepared by a Traffic Engineer in accordance with SDC 4.2-105 A.4. Traffic Impact Studies (TIS) allow the City to analyze and evaluatethetraffic impacts and mitigation of a development on the City's transportation system. In general, a TIS must explain how the traffic from a given development affects the transportation system in terms of safety, traffic operations, access and mobility, and immediate and adjoining street systems. A TIS must also address, if needed, City, Metro Plan and state land use and transportation policies and objectives. Complete Incomplete See Transportation Note(s) NA Traffic Impact Study o Land Division Tentative Plan Complete Incomplete See Transportation Revised 10/25/07 Note(s) El E Location of existing and proposed street lighting, including type, height, and area of illumination ❑ Location of existing and proposed transit facilities _ Location and dimensions of existing and proposed driveways 0 ❑ Location and width of all existing and proposed sidewalks, sidewalk ramps, pedestrian access ways, and bike trails Location, widths, conditions, and names of all existing and proposedstreets, alleys, dedications, access easements or other right-of-ways within or adjacent to the proposed land division. Proposed streets should also include approximate radius of Revised 10/25/07 curves and grades and relationship to any projected streets as shown on the Metro Plan, TransPlan, Conceptual Development Plan, or Conceptual Local Street Map E] z Location of existing and required traffic control devices Transportation Notes: Additional comments not related to the completeness of the application: Revised 10/25/07 ANY REQUIRED ADDITIONAL MATERIALS, APPLICATIONS OR PERMITS IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL STANDARDS OR APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE APPLICANT SHOULD CONSIDER UTILIZING EITHER THE DEVELOPMENT ISSUES MEETING OR THE PRE -APPLICATION REPORT FOR MORE DETAILED INFORMATION: Applicable Not Applicable Proposed deed restrictions and a draftof any Homeowner's Association Agreement rYynybe, "�f S{"rryW�vu-1c.. 111t�0-c�"' �] Additional plans and documentation for submittal of a Cluster Subdivision proposal as specified in SDC 3.2-230 Riparian Area Protection Report For properties located within 150 feet of the top of bank of any Water Quality Limited Watercourses (WQLW) or within 100 feet of the top of bank of any direct tributaries of WQLW U A Geotechnical Report prepared by an engineer must be submitted concurrently if there are unstable soils and/or a high water table present 0 E Where the development area is within an overlay district applicable, address the additional standards of the overlay district pIf five or more trees are proposed to be removed, a Tree Felling Permit as specified in SDC 5.19-100 A wetland delineation approved by the Oregon Division of State Lands must be submitted concurrently where there is a wetland on the property Any required federal or state permit must be submitted concurrently or evidence the permit application has been submitted for review rl Where any grading, filling or excavating is proposed with the development, a Land and Drainage Alteration permit must be submitted prior to development Where applicable, any Discretionary Use or Variance as specified in SDC 5.9-100 and 5.21-100 THIS APPLICATION IS: ❑ COMPLETE FOR PROCESSING ® INCOMPLETE AND NEEDS MISSING INFORMATION NOTED ABOVE This is not a decision on your application. Springfield Development Code Section 5.4-105 and Oregon Revised Statutes 227.178 require the City take final action on a limited land use decision within 120'days after the application is deemed complete. The 120 -day processing period for this application begins when all the missing information is submitted or when you request that the City proceed without the information. You must indicate by either signing this form or by submitting a written response to the City within seven days of the date of this form asserting your intentions regarding the provision of the missing information. If you indicate herein or in your written response that the missing information will be submitted, then you have 180 days from the date the application was submitted for Pre -Submittal Review to provide the City with the missing information. If you refuse to submit the missing information, then upon receipt of the full application packet and processing fee, the City will deem the application complete for purposes of starting the 120 -day clock and begin processing the application. No new information may be submitted after the start of the 120 -day period unless accompanied by a request for an extension of the 120 -day processing time. Upon receipt of a request for extension, the City may extend the 120 -day period for a reasonable period of time. The City may also require additional fees if the new information is submitted after the Notification to Surrounding Property Owners is sent out and a second notification is required or if the new information substantially affects the application proposal and additional review is required. I, the owner/applicant, intend to submit all missing items indicated herein to the City within the 180 - day timeline. DEVELOPMENT AND PUBLIC WORKS SPRINGFIELD 225 FIFTH STREET OREGON SPRINGFIELD, OR 97477 PHONE: 541.726.3753 FAX 541.726.1021 www.smmgfield-orgov STORMWATER MANAGEMENT SYSTEM SCOPE OF WORK --- --- ------ (Area below this line filled out by Applicant) ------------------ ------ -... ------------------ --- (Please return to Clayton McEachern @ City of Springfield Development and Public Works; Fax # 736-1021, Phone # 736-1036), email,emceachern@springfield-or.gov Project Name: r`�pCp4=114 eF 4t-znt Applicant: JeµA'•IsrA,-t ()Au. , Assessors Parcel 4: 122 0?. -o5 -M T( -* Elea Dater- iii zc ze; Land Use(s): IZ�SID€F1'r1,kC_ Phone#: 5A( -4 -es 45as Project Size (Acres): p.`i'3. Ar., Fax#: 54A-A-E—s- Stp + Approx. Impervious Area: O. �k''a ,4�. Email: oAI-.F-,, a,POAcae✓ to Project Description (Include a copy of Assessor's map): ZvJSAIV 16 Me -l' -( i�4- L$-2;T7o-t I-1 Frzt>Pie-T-( stow r`1,:-- lt.-.�ZI c)O �)`4 h -`f z ol�S AA AP alb-oz-oS-IZ INTU v TS *;NZ_ 1 br--14T I As— ❑ Hillside Development: Drainage Proposal (Public connection(s), discharge location(s), etc. Attach additional sheet(s) if necessary: TK -v-, "PLI eA. LT- is P"v-` l" -r*t% r sTtxeaA vla- 2 au. opF +=aOAA Rt -i2- CUZ4= k(2k,i—,Wltl l,,g70 Et -51T= D2Y1cfLLS0N 71,'@.1"t,(Mt(:�VAI- LOT15, PJJIJO'FF- F&,O 1 7* -F- +'A-Q�rz)1 - E '-5S D21�tE l4lU.. F E-uIL�G't�.fl 1f1 -h- µ. i,µ .M1t-t, Pz5,rO — DtSGt4P-fL[�Itttj-tU �`�' �11-aill IF1 tLTPw4T 1oP1, c*1 ff GR— N "(Li- 3v- DI qgr= an D iT S ❑ Soil Type: Proposed Stormwater Best Management Practices: (lf7� 67F-D2Y UELL,`z A-mb tµtLL.'Tn -TIOwl PI.�tNTfiif - N)f} _ - --_�__s� (Area below this line filled out by the City and Returned to the Applicant) -------- ------- ---- (At a minimum, all boxes checked by the City on the front and back of this sheet shall be submitted or an a lication to be com lete or submittal, although other requirements maybe necessary.) Drainage Study Type (EDSPM Section 4.03.2): (Note UH may be substituted for Rational Method) N Small Site Study - (use Rational Method for calculations) - C4e OSL ❑ Mid -Level Development Study - (use Unit Hydrograph Method for calculations) ❑ Full Drainage Development Study - (use Unit Hydrograph Method for calculations) Environmental Considerations: ❑ Wellhead Zone: Nj 4 ❑ Hillside Development: N)A ❑ Wetland/Riparian: /✓J l- ❑ Floodway/Floodplain: PIA ❑ Soil Type: s's n A shu+3 ❑ Other Jurisdictions N)f} Downstream Analysis: N/A --al) on 5oc -6rr4are -ern u5L 5P—PVA-144 Me4lwel. izr etall sum- Flow line for starting water surface elevation:" - Design HGL to use for starting water surface elevation: Manhole/Junction to take analysis to: Return to Clayton McEachern @ City of Springfield, email: cmceachern@springfield-orgov, FAX: (541) 736.1021 COMPLETE STUDY ITEMS For Official Use Only: * Based upon the information provided on the front of this sheet, the following represents a minimum of what is neededfor an application to be complete for submittal with respect to drainage; however, this list should not be used in lieu of the Springfield Development Cade (SDC) or the City's Engineering Design Manual. Compliance with these requirements does not constitute site approval; Additional site speck information may be required. Note: Upon scoping sheet submittal, ensure completed form has been signed in the space provided below: Interim Design Standards/Water Quality (EDSPM Chapter 3 Req'd N/A ® All non -building rooftop (NBR) impervious surfaces shall be pre-treated (e.g. multi-chambered catchbasin w/oil filtration media) for stormwater quality. Additionally, a minimum of 50% of the NBR impervious surface shall be treated by vegetated methods. Where required, vegetative stonnwater design shall be consistent with design standards (EDSPM Section 3.02), set forth in Chapter 2 of the Eugene Stomiwater Management Manual. For new NBR impervious area less than 15,000 square feet, a simplified design approach may be followed as specified by the Eugene Stormwater Management Manual (Sec2.4.1). ® If a stormwater treatment swale is proposed, submit calculations/specifications for sizing, velocity, flow, side slopes, bottom slope, and seed mix consistent with City of Springfield or Eugene's Stormson/or management Manual. E] ©Water Quality calculations as required in Section 3.03.1 ofthe EDSPM.—.�wp )n}i�}py�Lq -/pia 1r+' All building rooftop mounted equipment, or other fluid containing equipment located outside of the building, shall © ❑ Drainage study prepared by a Professional Civil Engineer licensed in the state of Oregon. ® ❑ A complete drainage study, as required in EDSPM Section 4.03.1, including a hydrological study map. S❑ ® Calculations showing system capacity for a 2 -year storm event and overflow effects of a25 -year storm event. The time of concentration (TO shall be determined usine a 10 minute start time for developed basins. U Existing and proposed contours, located at one foot interval. Include spot elevations and site grades showing how site drains. ® F_� Private stormwater easements shall be clearly depicted on plans when private stormwater flows from one property to another. ® ❑ Drywells shall not receive runoff firom any surface w/o being treated by one or more BMPs, with the exception of residential building roofs (EDSP Section 3.03.4.A). Additional provisions apply to this as required by the DEQ. Refer to � the website: http://www deo state or us/wc/uic/uic htm for more information. F-1in Der lieu ponds shall be designed to limit runoff to pre -development rates for the 2 through 25 -year storm events. N)( pry 5;' jn#.rrr4�1✓bN *This form shall be included as an attachment, Inside the front cover, ofthe stormwater study. 'IMPORTANT: ENGINEER PLEASE READ BELOWAND SIGNt As the engineer of record, I hereby certify the above required items are complete and included with the submitted stormwater study and plan set. Signature Date Form Version 5: June 2015 ® A downstream drainage analysis as described in EDSPM Section 4.03A.C. On-site drainage shall be governed by the Oregon Plumbing Specialty Code (OPSC). ® Elevations of the HOL and flow lines for both city and private systems where applicable. ❑ M Design of Storm Systems (EDSPM Section 4.04). ❑ ® Flow lines, slopes, rim elevations, pipe type and sizes clearly indicated on the plan set. ❑ ® Minimum pipe cover shall be 18 inches for reinforced pipe and 36 inches for plain concrete and plastic pipe materials, or proper engineering calculations shall be provided when less. The cover shall be sufficient to support an 80,000 lb load without failure of the pipe structure. ❑ ® Manning's "n" values for pipes shall be consistent with Table 4-1 of the EDSP. All storm pipes shall be designed to ' achieve a minimum velocity of three (3) feet per second at 0.5 nine full based on Table 44 as well. U Existing and proposed contours, located at one foot interval. Include spot elevations and site grades showing how site drains. ® F_� Private stormwater easements shall be clearly depicted on plans when private stormwater flows from one property to another. ® ❑ Drywells shall not receive runoff firom any surface w/o being treated by one or more BMPs, with the exception of residential building roofs (EDSP Section 3.03.4.A). Additional provisions apply to this as required by the DEQ. Refer to � the website: http://www deo state or us/wc/uic/uic htm for more information. F-1in Der lieu ponds shall be designed to limit runoff to pre -development rates for the 2 through 25 -year storm events. N)( pry 5;' jn#.rrr4�1✓bN *This form shall be included as an attachment, Inside the front cover, ofthe stormwater study. 'IMPORTANT: ENGINEER PLEASE READ BELOWAND SIGNt As the engineer of record, I hereby certify the above required items are complete and included with the submitted stormwater study and plan set. Signature Date Form Version 5: June 2015 : !! ~{ - ?j ( m \ � �� . '^a � piypA3P 5�5n 'S=¢hnSbSSY'.n SYS'a Oki RYPkii :�ji�tl®k$k%333 i��e gg k"� Bxxp 5 yy g. pyS�5�S3 ?A �'ei 3Sy Ras $ole {.lei.... IHOONH® o i€3;€:rtze�3€10 0 a�m��'a .F•. p0 axx x 3 p p..i Z2C S a h Y 8e mm � xo iv � xn e x ��'