PERMIT APPLICATION
lnspections: 726-3769
Office: 726-3759
LOCATION OF PROPOSED
ASSESSORS MAP:
FIELE,
LOT
-
BLOCK:
JOB NUMBER
225 Fif th Street
Spring f leld, Oregon g7 4Z?
a
TAX LO'I:
SUBDIVISION: -
/ka <-
'4ru
PHONE:
or?STATE:ZIP:
\4 I L)
,r/)A
fz L/ 7x
?./]J&4,6o J
/ l/i*o,
r
ADDRESS
CITY:
DESCRIBE WORK:4/a ao
NEW
-
REMODEL ADDITION DEMOLISH OTHER
I RES PHONE/"y,v c 1 S-zS- X ?r0-ot72
CONTRACTOR'S NAMESat
MECHANICAL:
ELECTRICAL:
CONST.
CONTRACTOR #ADDRESS
G, r.74< t-o.(GENERAL:
PLUMBING
RANGF-:
/ OF BDRMS
_ OFFICE USE _
WATER HEATER:
FLOOD PLAIN
SECONDARY HEAT: _
SOUARE FOOTAGE
OUAD AREA:
r OF BLDGS:
LAND USE:
OCCY GROUP:
r OF STORIES:
CONSTR. TYPE
HEAT SOURCE:
# OF UNITS: _--ZONING CODE:
To request an lnspectlon, you must call 726'3769. Thls ls a 24 hour recordlng. All lnspections requested before 7:00 a.m. wlll bemade the sanle worklng day, lnspections requested after 7:00 a.m. wlll be made the following work day.
REQUIRED INSPECTIONS
[--l Temporary Electrlc Rough Mechanical - Prior to
cover.tl Flnal Plumbing - When altplumblng worl< ls complete.
Slte lnspection - To be madc
after excavatlon, but prior to
setting forms.
Rough Electrical - Prior to Final Electrical - When all
electrical work is complete.cover.
Underslab Plumbing/ Electrical /
Mechanlcal - Prior to cover.Electrlcal Servlce - Must be
approved to obtaln permanent
electrlcal power.
Final Mechanical - When all
mechanical work is complete.
Footlng - After trenches are
excavated.Flreplace - Prlor to faclng
materlals and framing lnsp.
f/ rnat Buitdlns - When ail
-
required lnspectlons have been
approved and building is
completed.Masonry - Steel locatlon, bond
beams, groutlng,
l-Df Framlng - Prlor to cover.
fJWdttCelllng lnsutatlon - prtor tot-tLl cover.
Foundatlon - After forms are
erected but prlor to concrete
placement.
Other
Underground Plumblng - Prior
to filllng trench.Drywall - Prlor to taping
MOBILE HOME INSPE TIONSUnderlloor Plumblng/ Mechanlcal
- Prior to lnsulation or decklng.Wood Stove - After lnstallatlon.
Posl and Beam - Prlor to floor
insulatlon or decklng.lnsert - After flreplace approval
and lnstallatlon of unlt.
Blocking and Set.Up - When alt
blocklng is complete.
Floor lnsulallon - Prlor to
decking.Curbcut & A1:proach - After
forms are erected but prior to
placemcnt of concrete.
Plumbing Connections - When
home has been connected to
water and sewer.
Sanitary Sewer - Prior to f illing
trench.Electrical Connection - When
blocking, set-up, and plumbing
inspections have been approved
and the home is connected to
the service panel.
Storm Sewer - Prior to fllling
trench..
Water Llne - Prlor to filling
trench.
Streel Trees - When all requlred
trees are planted.
Final - After all required
inspections are approved and
porches, skirting, decks, and
ventln.g have been lnstalled.
Rough Plumbing - Prior to
cover.
.
i:
I 2OWNER:
E
E
tl
tl
tl
E
il
E
E
E
tl
E
tl
E[--l Sidewalk & Driveway - AftertJ excavation ls complete, forms
and sub-base materlal in place.
[--l Fence - lVhen completed.ll
GAR ACCPL.HSE
N
S
E
Lot faces
Lot sg. ftg.
Lot coverage
Topography
Total height
Lot Type -
-
lnterior
-
Corner
-
Panhandle
-
Cul-de-sac
I-TS THE PROPOSED WORK iN.IHE
HISTORICAL DISTRICT, OR ON
THE HISTORICAL REGISTER?
-
lf yes, this application must be signed
and approved by the Historical
Coordinator prior to permit issuance.
APPROVED:
BUTLDING VALUE, PLAN CHECK
AND BUILDING PERMIT
This permit is granted on the cxpress condition that the said
construction shall, in all respects, conform to the Ordinance
adopted by the City of Springfield, including the
Development Code, regulating the construction and use of
buildings, and may be suspended or revoked at any time
upon violation of any provisions of said ordinances.
Plans Roviewcd t3y Date
Receipt Numbe
Plan Check Fee:
Date Paid
Fleceived By:
VALUE
(A)
X $/SQ. FT.
Total Value
Building Permit Fee
State Surcharge
Total Fec
BUILDING PERMIT
ITEM SO. FT,
Main
Garage
Carport
SYSTEMS DEVELOPMENT CHARGE (SDC)
(B)
Systems Development Charge is due on all undeveloped
properties within tlre City linrits which are being improved.
ITEM
Fixtures
Residential Bath(s)
Sanitary Sewer
Water
Storm Sewer
Mobile Home
(c)
FEE
N0
FT.
FT.
FT.
PLUMBING PERMIT
Plumblng Permit
State Surcharge
Total Charge
ADDITIONAL COMMENTS
Wood Stove/ lnsert/ Fl replace Unit
Dryer Vent
(D)
NoVent Fan
Mechanical Permit
lssuance
State Surcharge
Total Permit
MECHANICAL PERMIT
Furnace
Exhaust Hood By slgnature, I state and agree, that I have caref ully examined
the completed application and do hereby certify that all
information hereon is true and correct, and I f urther certify
that any and all work performed shall be done in accordance
with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described
herein, and that NO OCCUPANCY will be made of any
structure without permission of the Building Safety Division.
I further certify that only contractors and employees who
are in compliance with OFIS 701.055 will be used on this
proiect.
I f urther agree to ensure that all required inspections are
requested at the proper time, that each address is readable
from the street, that the permit card is located at the front
of the property, and the approved set of plans will remain
I,lkure
on the s times during constructlon.
MISCELLANEOUS PERMITS
Mobile Home
State lssuance
State Surcharge
Sidewalk _-.- ft
Curbcut
-_-_
ft
Demolition
State Surcharge
Total Miscellaneous Pennits (E)
TOTAL AMOUNT DUE (excluding electrical)
(A, B, C, D, and E Combined)
Am\q
BY
ECEIV
VALIDATION:
RECEIPT NUMBER
DATE P,AID
AMOUNT R
FIECEIVED
_3\_9
Permit #:
Address
ou,",4'\ 'QtoIssued
Statemert: lnformation Notice to Property Owners
About Construction Responsibilities
Note: Oregon Law, ORS 701-055(4), requires residential construction permit appli-
cants who are not registered with the Construction Contractors Board to sign the
following statement before a building permit can be issued. This statement is required
for residential building, electrical, mechanical, and plumbing permits. Licensed
architect and engineer applicants, exempt from registration under ORS 701.010(7),
need not submit this statement. This statement will be filed with the permit.
Fill in the appropriate blanks and initial boxes I andZ, and either box 3A or 3B:
1. I own, reside in, or will reside in the completed structure. i
2. I understand that I must register as a construction contractor if the structure is sold or offered for sale
before or upon completion
5!5 343,A.. My general contractor is
I will instruct my general contractor that all
Contractor regis. #
who work on the structure must be
registered with the Construction Contractors Board.
OR
38. I will be my own general contractor
If I hire subcontractors, I will hire only subcontractors registered with the Construction Contractors
Board. If I change my mind and hire a general contractor, I will contract with a contractor who is
registered with the CCB and will immediately noti$ the office issuing this building permit of the
name of the contractor.
I hereby certify that the above information is correct and that I have read and do understand the Information
Owners about Construction Responsibilities on the reverse side of this form.
,ak s
ignature of permit applicant)