HomeMy WebLinkAboutPermit Building 2002-07-18SPRIiIGFIELD
Job# 02-00753-01
RESIDENTIAL PERMIT
Gity Of Springfield
Gommunity Services Division
Building Safety
Page 1 of 3
Job Number: 02-00753-01
Office: 726-3759
lnspection Line: 726-3769
Tax Lot#: 00800
Subdivision:
&225 Fifth Street
Springfield, OR97477
Location Of Proposed Site: 1225 Water St Spr
AssessorsMap#: 17032744
Lot: BIock: Addition
crTY oF SPRINGFIELD, OREGOTV
Owner: Greg Shaver
Address: 1225Waler Street
Scope Of Work: Garage
Garage/Shop
Contractor Type
GeneralContr
Phone Number:
City/State/Zip:
New
\o
541-726-1410
Springfield, OR97477
Value: $18,816
Date
ly Dwelling # Of s
ElectricalContr
Plumbing Contr
Quad Area:
# Of Units:
Constr. Type:
Water Heater:
1 RNW
(VN) Wood Frame
Contractor
Greg Shaver
1225 \N aler Street, Springfield, OR
Greg Shaver
1225V,,later Street,
Greg Shaver
1225\Nater Street,
Phone
541-726-1410
541-726-1410
541-726-1410
p Private Garage/CrZoning
Bedrooms:
Range:
working day
To request an inspection call the 24 hour recording at 726-3769. All 7:00
a.m. will be made the same working day, inspections req uested after 7:00 following
Required
Building
-lnstall ground rod at footing, and
-After trenches are excavated.
call for inspection uction with footing and/or foundation ir
-After forms are erected but prior to concrete placement.
-To be made after all inslab building service equipment, conduit piping, and other equipment iten
-Before covering sheathing with finish materials.
-Prior to cover.
-when all required inspections have been approved and the building is complete.
Electrical
Verify Ground Rod
Footing
Foundation
Slab
Shear Wall Naiting
Framing
Hold Downs lnstalled
FinalBuilding
Rough Electrical - Prior to cover,
Job#53-01
Page 2 of 3
Land Use: Single Family Dwelling
Pave Driveway? E
Panel 1142of2975
Required lnsPections
Final Electrical
Underground Plumbing
Rough Plumbing
Sanitary Sewer Line
Storm Sewer Line
Drywell
FinalPlumbing
-When all electrical work is complete.
Plumbi
-Prior to filling the trench.
-Prior to cover.
-Prior to filling trench.
-Prior to filling trench.
-Engineered Drywell is required.
-When all plumbing work is complete
Zoning: LDR
FloodPlain? [ Wetlands? [
Journal numbers
1: 2:
Comments:
Overlay District:
# of Street Trees:
3
Planner:
Urban Growth Boundary?! Gtenwood Area? [
Quantity Of Fill:
Supplier:
Drainage:
Floodway FEMA: Zone X White
Additional Requirements:
Required Attachments:
Source Locn:
Material:
Flood Plain FEMA:
Construction Types(VN) Wood Frame
Occupancy Groups: Private Garage/Carp/Stor
# Of Buildings: 1 # Of Stories: 1
# Of Bedrooms:
Handicap Access?
Area (Sq.
Main:Accessory960 Total360
Current Units:
Census Code: Does not apply
Height (feet): 16
Proposed Units:
Fee Paid On Receipt# Value/Quantity Fee Amount
Plan Check
Residential Plan Check
Total Plan Check
06t24t2002 9697 18,816 $115.44
$115./14
Building
Garage/Carport
State Surcharge For Building Permit
8% Building Administrative Fee
Total Building
07t08t2002
07t08t2002
07108t2002
9853
9853
9853
18,816 $177.60
$12.43
$14.21
$204.24
Electrical
Minimum Electrical Permit Fee
Permanent: 200 Amps or Less
Branch Circuits With Feeder or Service
State Surcharge - Electrical
8% Admin Fee - Electrical
Tota! Electrica!
07t08t2002
07t08t2002
07t08t2002
07t08t2002
07t08t2002
9853
9853
9853
9853
9853
1
$.00
$63.00
$30.00
$6.51
$7.44
$106.95
10
Job# 02-00753-01 Page 3 of 3
Fee Paid On Receipt# Value/Quantity Fee Amount
Plumbin
Minimum Plumbing Permit Fee
Minimum Plumbing Permit Fee
Number of Fixtures
State Surcharge - Plumbing
State Surcharge - Plumbing
Sanitary Sewer Footage
Storm Sewer Footage
8% Administrative Fee - Plumbing
8% Administrative Fee - Plumbing
Total Plumbing
07t08t2002
07t18t2002
07t18t2002
07t08t2002
07118t2002
07118t2002
07t08t2002
07t0812002
07t18t2002
9853
9980
9980
9853
9980
9980
9853
9853
9980
2
$.00
$.00
$28.00
$3.1 5
$5.11
$45.00
$45.00
$3.60
$5.84
$135.70
26
'15
System Development
Residential - Single Family - Storm
SDC Administrative Fee
Total System Development
07t08t2002
07t08t2002
9853
9853
400 $109.20
$5.46
$114.66
Planning
07t08t2002 9853Planning Plan Review
Total Planning
$55.00
$ss.00
Grand Total
Plan Check Type
lnitial Review-Res
Engineering-Res
Planning-Res
Structural-Res
$731.99
Checked By Date Completed Gomment
Lisa Hopper 0612512002
Denny Wright 0710312002
Liz Miller 0612812002
Bob Barnhart 0710812002
By signature, I state and agree that I have carefully examined the completed application and do
hereby certify that all information herein is true and correct, and I further certify that any and all work
performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of
the State of Oregon. I further state that only contractors and employees who are in compliance with
ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are
requested at the proper time, that the project address is readable from the street, that the permit card
is located at the front of the property, and the approved set of plans will remain on the site at all times
during con
Date
1
7-8-o>
t\-
lsPRINGFIELD
Job# 02-00753-0{
RESIDENTIAL PERMIT
City Of Springfield
Community Seryices Division
Building Safety
Page 1 of 3
Job Number: 02-00753-01
Office:726-3759
Inspection Line: 726-3769
Tax Lot#: 00800
Subdivision:
225 Fifth Street
Springfield, OR97477
Location Of Proposed Site: 1225 Water St Spr
AssessorsMap#: 17032744
Lot: Block: Addition
crrY oF SPRTNGFTELD, OREGOTV
Owner: Greg Shaver
Address: 1225Water Street
Scope Of Work: Garage
Garage/Shop
Phone Number:
City/State/Zip:
New
541-726-1410
Springfield, OR97477
Value: $18,816
Contractor Type
GeneralContr
ElectricalContr
Contractor
Greg Shaver
1225 W ater Street, Springfield, OR 97 477
Greg Shavet
1225 W ater Street, Springfield, OR 97 477
Greg Shaver
1225 W aler Street, Springfield, OR 97 477
Registration #Expiration Date Phone
541-726-1410
541-726-1410*po
Plumbing Contr
Quad Area:
# Of Units:
Constr. Type:
Water Heater:
1 RNW
(VN)Wood Frame
Office Use
-
Land Use: Single Family Dwelling
Zoning Gode: LDR
Bedrooms:
Range:
1410
up: Private Garage/C:
#
To request an inspection call the 24 hour recording at 726-3769. All
a.m. will be made the same working day, inspections requested after
working day.
before 7:00
Verify Ground Rod
Footing
Foundation
Slab
Shear Wall Nailing
Framing
Hold Downs lnstalled
FinalBuilding
. will be made the following
Required lnspections
Building
-lnstall ground rod at footing, and call for inspection in conjuction with footing and/or foundation ir
-After trenches are excavated.
-After forms are erected but prior to concrete placement.
-To be made after all inslab building service equipment, conduit piping, and other equipment iten
-Before covering sheathing with finish materials.
-Prior to cover.
-When all required inspections have been approved and the building is complete
Electrical
Rough Electrical -Prior to cover
Final Electrical
Storm Sewer Line
Drywell
Final Plumbing
Zoning: LDR
FloodPlain? ! Weflands? [
Journalnumbers
1: 2:
Comments:
Planner:
Urban Growth Boundary?
Quantity Of Fiil:
Supplier:
Drainage:
Job# 02-00753-01
Required lnsPections
Electrical
-When all electricalwork is complete.
Plumbing
-Prior to filling trench.
- Engineered Drywell is required.
-When all plumbing work is complete.
Page 2 of 3
Overlay District:
# of Street Trees:
Land Use: Single Family Dwelling
Pave Driveway?,a
3:
l] Glenwood Area? I---
Additional Requirements:
Required Attachments:
Source Locn:
Material:
Floodway FEMA: Zone X White
Gonstruction Types(VN) Wood Frame
Occupancy Groups: private Garage/Carp/Stor
# Of Buitdings:
Flood Ptain FEMA:Panel 1 142 of 2975
Height (feet): 16
Proposed Units:
# Of Stories: 1
Current Units:
Gensus Code: Does not apply
Totalg60
1
# Of Bedrooms:
Handicap Access?
Area (Sq.
Main:
Fee
Accessoryg60
Residential plan Check
Total Plan Check
06t24t2002 9697
Paid On
07t08t2002
07t08t2002
07t08t2002
07t08t2002
07t08t2002
07t08t2002
07t08t2002
07t08t2002
07t08t2002
07t08t2002
07t08t2002
Receipt# Valu
9853
9853
9853
Fee Amount
$11s.44
$115.,14
$177.60
$12.43
$14.21
$204.24
$.00
$63.00
$30.00
$6.51
$7.44
$106.9s
$.00
$3.1 5
$45.00
18,816
18,816
Garage/Carport
!l3tg S_urcnarge For Buitding permit
8% Buitding Administrative Fee
Total Buitding
Minimum Electrical permit Fee
Permanent: 200 Amps or Less
tsranch Circuits With Feeder or ServiceState Surcharge - Electrical
8% Admin Fee - Electrical
Total Electricat
98s3
9853
9853
9853
9853
9853
9853
9853
1
10
Plan Check
B
PlumbinMinimum plumbing permit Fee
State Surcharge - plumbing
Storm Sewer Footage
15
Job# 02-00753-01 Page 3 of 3
Fee Paid On Receipt# Value/Quantity Fee Amount
Plum
8% Administrative Fee - Plumbing
Total Plumbing
07t08t2002 9853 $3.60
$51.75
System Development
Residential- Single Family - Storm
SDC Administrative Fee
Total System Development
07t08t2002
0710812002
9853
9853
400 $109.20
$5.46
$114.66
Planning
07t08t2002 9853 1Planning Plan Review
Total Planning
$55.00
$55.00
Grand Total
Plan Check Type Checked By Date Completed Comment
lnitialReview-Res Lisa Hopper 0612512002
Engineering-Res Denny Wright 0710312002
Planning-Res Liz Miller 0612812002
Structural-Res Bob Barnhart 0710812002
By signature, I state and agree that I have carefully examined the completed application and do
hereby certify that all information herein is true and correct, and I further certify that any and all work
performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of
the State of Oregon. I further state that only contractors and employees who are in compliance with
ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are
requested at the proper time, that the project address is readable from the street, that the permit card
is located at the front of the property, and the approved set of plans will remain on the site at all times
during construction
$648.04
7 a
S