HomeMy WebLinkAboutPermit Building 1990-02-08t#..REslDr- lTlAL..
APPLICATlUN/PERT4TT
225 North |th Street
SprLngfield, )r'egon 97477
Butlding Diuision
7 26-37 53
l.lechanical
Supe Electrician
FIIE INSPECTI)N: ?o be rrude aftet,er;A;ion;61 priar tc set ip of
fonns.
ANDERSLAB PLUMBING. ELECTRICAL &
WCHA.IIICAL: To be made before any
tlotk is cooeyed.
POOTING & FOUNDA?TCN: lo be ImCe
after trenchee a?e eaecoated and.
foltns ate erected, but prior to
pourirq ccncrete.
SPF|INGHEI.D
INSULAIr2N/V4?OR BASRTE!? rlt€Ptcll1N :
?o be made after aLL insulaticn ard
required oapor bawiet s @e in place
but before ory Lath, Wpsun bcarC or
tnLL cooeting is applied, and. before
ary insulation is concealed.
DRWALL filSPEC?I)N: Ic be nade
after. aLL C,tyuaLL is in place,
but prior to ang taping.
\IAS1NRI: Steel Loeation, bond
beons, grouting ot, uerticals in
accotdotce LlLth U,B.C. Section
24L5.
WOODSTO'IE:
ccmpT;TA.
After installati.on is
CURB & APPROACI] APPON:After fornsee erected but prior to pouring
cotlcrete.
SfDEWALK & DRfT,EWAY: Fot aLL eon-
crete pat;ing rrtthin stteet fight-
of-uny, to be nade after aLL ecca-
Dating camplete & font uork & sub-
base matet*ial in place.
OR
Sarilary setser eapsped at properfil Lhce
Septic totk y.atped and. filled vith gra;sel
Final - h4ten aboue itens are cctnpleted
and uhen Csnolitior is conplete o? stt'Lic-
tut,e moued and. prenrLses cleaneC up.
Hcmes
It ie the teepoaaibility oi tle permtt holter to aee that aLL inspectiow are nad,e at the prope? tine, that ecch a,l,lnees is readabie
fnan the atreet, and tlnt the penrtt eatd, ie Lxated at the frcnt of the propettu.*Suilding Nuieiot approted pl.an shcll remain on tlp Building Site'at aLL' tihes.'
726-3769(yeeordet) state yout, Citg designated job nmber,,job aCiress, type
Requests reeeixed
of inspec2i,cn
befcra 7:00 o:tuhen you ready for inspection, Contyactot,s ot, Asners rame and pTnne numbcr.
L ttude the eane dcg, ?equests nade aft* ?:00 on utill be rm.de the nettlnz'king dag.
Iottt, City Desigr,ated Job Nunber fs:q
POST AND BEAI|: To be nade pt4ot to
GiaTGlGToT floor insulation ot
deckittg.
ROUGH PLAEIIIG. ELECTRTCAL & I,IECE:
ANICAL: No uork ie to be cotez,edffiiT-these irnpectiozis lnue been
nade and. approoed..
EIPEPTACE: Pz.tor to pkeirq faeingma-tez,ials and. before froning inepeb-
tion.
FRAIIING: l,tust be requested after
approoal of rough plwrbing, electr-i-
u,L & neclnnical. ALL roofing
bracirq & chinmeys, etc. mtst be
completed, lto ucrk ie to be eon-
cealed until this inspectton ltas
been nad.e anC approted.
UNDERGROUIID PLUMBING, SE'IEP, I,I.4TER,
DRAIIIAGE: To be naCe prLor to fil-Tfr-iencnes.
ANDEPFLOOR PLUI,EING & IiECIIANICAL:
of
flooz, ineulction or decking.
PTilAL PLUI4BI]IC
FINAL I,ITCHANICAL
FIIVAL ETECTRICAT
hthen conplate -- ProuiCe
or nouable seetions through
P-WIE:
gates
P, U.E.
ALL project conditions, such as the i.nstallation of slreet trees, eonpletion of the
required Landsccptng, etc.' tmtst be sati,sfied before the BUfLDfNG FINAL ean be requested,
EINAL BUILDING: The Einal Building Inspeetion mtst be t,equested after the li.nal PlumbittS
\--/ Electrical, and Meclwrical fnspections laoe been nade atd approoeC.I
I
Job Locaticn:
Assessore Map #?aa Lot #
Subdixision:\
Asner:
Address:
ci.ty:
\D\C..tfth\
Describe h'ork:
5\
ValueDate of
Add.iticn
RenoCel
General
t
Plurnbing
Plunbing connectione -- aaiev od. uater
L Conneetion - Blocking, set-up
and plunbing connections mist be apprcrted
before requeeting eleclrtcal inspecli,ott
Aeceasory Buidnng
?itnl - After pctckee, skirting, deeks,
etc. ane onpleted.
Locking otd Set-up
*ALL I4ANHCLES AND CLEANOUTS MUS? BE ACCESSIBLE, ADJUSTIIENI TO BE I'L4DE I.T IIO CCST TO CI?Y Page 1 of 2
M
T
Phone:
l-1 ,rouorn ,o*n OC
bt Sq. Ftg.
% cf Lct Ccuerage
# of Stories
?otal Height
Iopography
soLAR ACCESS REQ.-
Gr
LCT I
Intericr
Corner
Panlnndle
CUL-de-sac
L-co c
BeCroons
Ileat
Laee
to"*e
Reeeipt #:
f HAW CAREEULLY EXAILIIIED tle eornpleted application for pernit, and do
hereby cettify that aLL infornation hereon is trae anl correct, arC f
furthet eertify that any ard aLL uork pe"fomed alall be dpne in accot-
dance vith the 1rdinances of the City of Springfield, and the Las of the
State of )regcn pertaining to the wtk Cescribed herein, cnd tlat N0 OCCU-
Llyl.:.-*ll_ b; nyCe of al!- sttaetu?e without pernission of the Buitding N_ulslo_n-. r Junthen eertifg that otly contnaetore ad. enplcyees uho arb ineonpliance uith CRS Z|l.bss uiLL be used on thie irojntt
{tC/
Lot Faces -
Setbacks
Df House Caraoe Access.
Nov'th
East
South
West
IYEM SQ. F?G x Value
*d* N\ N htY)ncr
Geaqe
I
Ca?Dort
Aceessortl
, ln r'lv
TOTAL VALUE
( DeLue )S.D.C. 1.5 c
I PLan Fee:
Date Paid:I
Signed:
Building Vqlue & Permit
Ihis pertntt is granted on the eq)ress eondition that the said consttactionslnll, in aZL nZspects, eonform to the hdinarce adopted 6:y the City ofSpringfteld, i-nchiing the Zoning Crdinmtce, regulating the ccnstmteticn
attd use of buildings, urd may be suspend.ed or reuokeC at cny tine upon uic-
Lation of dtA prcoisions of said Oz,dir,ances.
*
Euilding Pendt
?otal Clnrges
State
Plumbing Permit
No pe?son shall constz,ttct, instal!, alter ot change anA neu cr erl,sting
plwbing or dtainage syet6'n in uhole ot in patt, unless such pez,son is the
Legal possessor of a ualid plumberts Lieense, escept that a pe?son nay do
plutnbing uoyk to p?ope?ty uhieh i.s otmed, Leased or operated by the appli-
cdnt.
NO.
C)
<
FffiAi
Resil.ential (1 bath)
Seuer
Plunbing Perrrit
State
1
Electricol Permit
llhere State Ian requiree tlnt the electtical uork be done by an Elee{z,ical
Contraeto?, tlte eleetrleal_port.ion,of this -permit eha.Ll not be oaliClntil
the Label lns been signed by the Electuical Cont?acto?.
)
PetmLt
Iotal
0
I
Neut,/Ectend Circuits
Set uice
Ftr'
khanat HooC
Vent Fan
NC
Ilcodstoile
I
Mechonicol Permit
Petm[t fssuotce
Meelwnical Penrtt
Secari
-- ENCROACHMENT --
Storage
I,laintenance
Petmit
:\,TotaL
Cunbcui
SideuaLk
9enee
L L
r
l}l---r4<r
I
,IO?AL AI4OUNT DUE: *Signed Date
f'
JOB NO.
'1 lnAh W
rT!M
'frlL?otnl Chnoas
State
lJ
n
t
\i ,\K
I
r:)