HomeMy WebLinkAboutPermit Mechanical 1984-10-17*
"Kt)lu YllAL"
z2s North rrr rron"or"t'cAT
rory /PERI'|rr
SprLngfield, )regon 97477
Building Diuision
7 26-37 53
fd / ol?,/B(&/SPFTINGFIELD
Date d
14eclunieaL
It is the responribili.ty of the petmit ltoT.der to aee that aLL inspeetions ate rnade at the prope" tine, that each addtess is reaCabi.e
fian the st?eet, and that the permit cayd is Located at the f"ant af tlte properbt.Tsuitding Noiciott appro,^ed plan stu.Ll yemain on the Bunlding site at aLL' tikes."
PROCEDUPE FOR fNSPECIfON REO.WST.'CALL726-3769(recorder) state yout Citg designated job ntnnbet,, job aCitess, type of ittspee=icn
ne.quested ar.d uhen you uLLL be ready for inspection, Conttaeta?s oy O,mets none and pTone nwnber. P.equests receixed befcte 7:00 cr,
'*iLL be made the sane day, "equests nade after 7:00 an urLLL be made the nest:,torkitg day.
Iour City Desigr,ated Job Nutnber fs:4 7
Qoa,o' noA Tnornn*a' noo
;WJob Locaticn:
Aesessot,s Map #
Subdioision:
/eOtmer:
Address:
0 7tro Ll.
- Phone:
t--t Nel)
,"rrOPil,
br"/
Date of App L'Leatian
Additian
RenoCeL
</General
Pege 1 of 2
SITE INSPEC?I)N: To be nade after
ezcauation, but pr.iaz, tc set up of
fonns.
UNDERSLAB PLUMBING, ELECTRICAL &
WCH4-\|ICAL: To be made befoz,e ang
uork ie cotlet,ed,
FOOTING & FOUNDATICN: ?o be ImCeAfr;;-tnenfi; a"e e&eatsated and.
forms ane erected, but prioz, to
pour"irtg ccncret€,
qlp.E?G1outlD PLUMBrNG, f!llE?, w.AlE&
-
T@-Tiinchee.
AilDERTLOOR PLULETNG & MECI]ANICAL :
o1
floor insulation or deeking.
P1ST AND lE!!A: ?o be made pr"Lot, to
fi&dttd67of floon insulation or
deeking.
ROUGH PLUIBIIIC. ELECIRTCAL & MECH:
ANICAL: No uor.k is to be couet'ed
.wttil these inspections ?ntte been
mad.e ond. approoed..
FLPEPLACE: PyLor to plccirq faeingmatertals and before franing inepee-
tion.
FRA].|ING: l,lust be requested after
apptooal of rough plunbing, electri-
eal & neclnnical. Alt roofing
btaeirq & chittmeys, etc, rrust be
. annpleted. Ilo ucrk is to be con-. cealed until this inspection lws'been made anC approoed.
FTilAL PLUMBIIIG
PINAL MECHANICAL
FINAL ELEC?RICAL
INSULATTON/VAPOR BARRTER ilISPEC?ION :
Io be made after aLL insulaticn avd
required uapor ba,z,ie?s @e in place
but before arg Lath, Wpslon boatC or
tnLL cooering i.s applied, ard beforeay insulation is concealed.
DRYTIALL INSPECTf1N: Ic be madea!*t -dT@nZTt s in ptace,
but prior to ang taping.
ILAS1NRI: Steel Location, bond
diffijgrouting ot, tertieals i-n
aceordotce tith U,B.C. Section
24L5.
After i-nstallation is
co?rDT;m,
DEI.!OLI?IO!] OR !.!OWD BUTLDTilCS
Sanitary saser capped at properQl Lit:e
Septic tutk putqed and. fi.Lled rrith g,a;;el
Pinal - lrrlten abcue itens are ecnpleted
and uhen dqtolition is eotnplete o? stzac-
ture mooed attd. pnetnises cleaneC up.
blobile Hcnes
Blocking od, Set-up
Plunbitrg eonnections -- aaie? old. uatet
El,ectrical Ccnnection - Blocking, set-uD
and plutnbing connections mtst be apprct;ed
before requesting eleclrical i.nspeclion
Accessor,; Building
Piral - After pcrekes, skirting, decks,
etc. are eotnple'ued.
CURB & APPRCACH APPON:
oe evecteC but
concrete.
SIDEIALK & DR[',EWAI: Por aLL con-
e"etendt @Affi st?eet right-
of-rwA, to be made after aLL erea-
oating canplete & forn wt'k & sub-
base matertal in place.
ptioz, to
After forms, pouring
?ENCE: When complete -- Prouide
gatee or nooable sections through
P, U.E.
ALL y,oject conditions, such as the i.nstallation of slreet tz'ees' conDletion,of the
requ.h,ed Landscapitg, ete., rmtst be satisfied befoz,e the BUfLDfNG FLNAL ean be requested.
FINAL BUILDftlc: The Tinal Building Inepection nuet be requested after the linal Pltnbing
Electrical, anC Mectnrical fnspections hqte been made ard approoed.I
*ALL IIANHCLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUSTIIEI.I! TO BE ITADE IT NO COST TO CEY
b3 7- F
Constm.ction Lendet
\1OZ3SOO ,.1 *"-u ()7k0r
T
r
J J La f.rO.7 S /sotAx A':cEsc riEri.-L-COG"'
BeC.r,oons:
PLan Eaoniner Ud.te
L
I HAW CAREFULLY EXAIIfNED tle conrpleted application for permit, and do
hereby certifg that aLL infonnation het,eon is tt'ue and cbrrect, and I
futthet, cez'tifg that any ard aLL uork perfonned sVnLL be done in aecor-
dance tLth the Ordinances of the City of Springfield, and the Lat;s of the
State of 0regon pentaining to the uork Cescyibed herein, and tlnt N0 OCCU-
PANCY tril,L be mad.e of any structure uithout permission of the Building DL-oision. I futthen eertify that only contracto?s ad. anplcyees uho arb in
conpliance Dith oRS 701.05s uiLL be used on this project
eat
AccessDfHouse
Lot Faces -Lot Sq. ?tg.
% of Lct Caserage
LOT TWE
_ Interior
_ Corner
_ Panhand.Le
CUL-de-sac
# of Stotles
Total Height
Topogtaphy
-- Fees --
Building Volue & Permit
?his pernnt is granted on the erpress condition tlnt the said_eonstractionslnll, in alL respects, conform to the Ozdirnnce adopted tiy the City of
Springfield, ineTuding the Zoning Crdinance, r'egulating the ecnstrueticn
and. use of buildings, and may be suspended or reookeC at cnA time upon uic-
Lation of anA prcttisions of said 1ydinances,
Value
TOTAL VALUE
Date Pdad-:
Signed:
rTEM tau x
S.D.C. L.5 c
Building Pev'mit
?otal Chargea
State
Plumbing Permit
No person sLnl,L construct, instal?., alter or clwnge anA neu cr eristing
plutnbing or drainage sgsten in uhole or in part, unless such pet,son is the
Legal possessot, of a ualid plunbez,'s L'tcense, eeeept that a pe?son nag do
plunbing uotk to propet,ty uhieh is otmed, Leased or opetated by the appli-
eallt.
N0.FEE CEARCE
*
li.shnes
Resi.d.ential (1 bath)
Sani Seuer
Plwnbing Penrit
State
TotaL
Electricql Permit
Were State Lau requires tlnt the electrical uoy,k be done by an Eleetrical
Contractor, the eleetrical portion of this permit slnll not be oaLiC until
the Label lns been signed bg the ElectricaL Contractor.
Permit
Iotal
Na,t,/Eotend Circuits
Ianpcroy Sezoice
FEE CI]ARCE
s:t
Mechqnicol Permit
bhanst HooC
I'lcodstotse
Vent Eal
PerttrLt fssuanee
MeclnnicaL Permit
Sec,*it! Depoeit
Storage
Mainterunce
Perwtt
&pbeut
Sideualk
lence
EZectyicaL Label
Mobile llorne
Reeeipt #:
TO?AL AMOUNT DUE:*ls o
$
Date
*
TTEM
Watpt
//-rfi)