HomeMy WebLinkAboutPermit Correspondence 1979-03-08ffiRR,R ffiffiERHHRRa RER*
E,NGINEEN . SURVEYOS .
Civll o s?r^t"-*"^"t-'n'"t-'irtit'ral o Fire Prot€ction
CODE CONSIIRANT
Plan Chic-kitrg o Constructlon rnspection
PLANNER
Lantl Use o Subdlvlslon
P'O' Box 139
Eugene' Orego-n 91YP
Ph"one (5OB) 484-9O8O
6a0 Surpri6bd
Tnn Lann Buttotne
4?4 Wrr,r,EurlrrE Sr'
llarch B, 1979
HEI Foundation Inspection - 820 Sunset 31vd' - Karl Hartreyt Build'er
on [}uesdayl March 5tn ana Hed.nesd.ay, March Tthr I made inspections of the
concrete forms a.nd reinforcing steli placement and coacrete pracement for
the found.ation d.esigned by me for the proposed resid@Roeo I met with the
concrete contractor and pointed- out the d.Lfects in his work wkich were to
be correctedl arrd ma'de subseguent inspections to verify the perforrnance of
these corrections. The contractor placed the concrete on tJed.nesd-ay, fllarch lth'
I verified. that all cond.itions were satisfactory prior to the plaeement of the
concrete.
Ron Clarkl BIdg. Official
City of SPringfield'
345 Main St.
Springfield-r OR 9747"1
Hith regard.s to the changes from our plan; I harre advised" the contractor on
the placement of additional reinforcing steel and excavation for the mini-
rmr.u d.i-mensions reguired- for the loads involved. I have notified the con-
tractor to call ," fo" inspection when the forms arrd reinforcing is in place
for the found.ation wa}Is and will give you a further report at the time of
that inspection.
I hope you find. this report satisfactory for your purposes. Please contact
me if you have f'r:rther guestions.
Emile Mortier, P.E.
ECM/d.a
C.U
cct Katl HaweSr
IO /uz FRO}I'"?- L%./,q.?.6
,€a.^&*./37 '
Elwc, 77r'tr,
7
t CT
Rodif;rmo 43 472
Poly Pol( (5O *t /at472
TESSAOE
t
SEND PARIS I AND 3 WITH CAIBON INTACT. PART 3 WII.L BE RETUNNED WITH REPIY
DATE
frl-E?