Loading...
HomeMy WebLinkAboutPermit Electrical 2020-02-24Electri cal Permit A tion 225Fifth Streeto Springfield,OR97477.pil(s4t )726-3753o FN<(541)726-3659 :iPNIH6FI6LD &, This permit is issued under OAR 9lg_309_0000. permitsdays of issuance or if work t, ,*p.ri.a i*jl"o orrr. are nontransferable. Permits expire if work is not started within lg0 CITY OF SPRINGF,IELD, OREGON DEPARTMENT USE ONL Y 53q-Permit no.11- Date:>D APPROVALLOCALGOVERNMENT Zoning approval verifi ed?flYes nNo CA TEG o RY OF ! Government ! Commercial JOB SITE N AND TIONLOCA Job site address:8 5 C City:State:ZIP: Taxlot. DESCRIPTION OF WORK PROPE RTY OWNER Name: Address: City:State ZIP: Phone:Fax: E-mail CONTRACTOR INSTALLATION Business name c-e Address rtt City:ZIP: Fax: E-mail: CCB license no.:ll oa BCD license no. s license no.: Ll55rl S Print name of signing supervisor: Dgn i/n Signature of signing FEE SCHEDUL E Number of inspections per item ( )Qty Cost ea. Total cost Residential, per unit, service included: 1,000 sq. ft. or less (4)$r86.00 $ Each additional thereof 500 sq. ft. orportion $36.00 s Limited energy (2)$44.00 $ Each manufacfured home or modular orservlce feederdwelling (2)$89.00 $ Services or feeders: installation, alteration, relocation 200 amps or less (2)$l r2.00 $ 201 to 400 amps (2)$r31.00 $ 401 to 600 amps (2)$221.00 $ 601 to 1,000 amps (2)$28s.00 $ Over I.000 amps or volts (2)$654.00 s Reconnect only (2)$89.00 $ Temporary services or feeders: ittstallation, alteration. relocation 200 amps or less (2)$89.00 $ $122.00 $ 401 to 600 amps (2)$177.00 $ Over 600 amps or 1,000 volts, see services or feeders section above Branch circuits: nan, alteration, extension per panel a. Fee for branch circuits with purchase ofa service or feeder fee: Each branch circuit $8.00 $ b. Fee for branch circuits without purchase ofa service or feeder fee: First branch circuit (2)t $89.00 Each additional branch circuit $8.00 Miscellaneous fees: service orfeeder not included Each purnp or irrigation circle (2)$89.00 $ Each sign or outline lighting (2)$89.00 $ Signal circuit or a limitcd-cncrgy panel, alteration, or extension (2)$89.00 $ Each additional inspection: (1)$102.00 $ USE (A) Enter subtotal ofabove fees (Minimum Permit Fee $102.00) sp{ (B) Enter 12%o surcharge (.12 x [A])$ $(C) Technology Fee (5% of [A]) s L'2-.TOTAL fees and surcharges (A through D): Lest edited lll/2019 BJones\ Signature: State:6 1l 201 to 400 amps (2) $8q /,a-$ l[a