HomeMy WebLinkAboutPermit Plumbing 1984-02-16I E
COMBI 0r'r L T RI.I I T 7?-3
Job Address EIIERGY SOURCES:
Hea
llater Heater
e
Sq
Sq
. Ftg. I'la n_
Ftg. Access.----
Sq. Fto. Other_
_l{ew_Add-AlterlGp. -
_Fence_Demo Change/Use
_other-
d)
-Po
qJ
C
Lega l Description \I I t
A Va l ue of llork
Owne
Add res s Phone nq
Re
t n
t'l
Desc'I s denc ith Attac Ga ra
.e., Build Single
)(,{u t r/<lc/
Construc on e Ider (./..0 0
Addres s Phone
DES I GN TEAI.,I name address ics. no.exD I res ohone no.
Primary
Structura I
EI ectri cal
l''lechani cal
CONTRACTORS name addres s I ics- no- )(pxnires I (nhonp nn
Genera I
El ectr i ca I
t'techani ca l
PLUIIB I NG ELECTR I CAL MECHAN I CAL
N0.FEE CHARGF NN FFF al..ta PcF NO FFF CHARGF
Each single fixture Residence of
SQ. FT
furnace/burner to
BTLI' s
Relocated bui lding
(new fix. additional)New circuits alts
or extensions
Floor furnace
and vent
S. F. Residence(l bath)SERV I CES
Recessed wal I
Soace heater and vent
Duplex (l bath) each
Additional bath Temporary Constructi on Apol iance vent
separate
Hater service Change in existing
res i dencp
Stati onar.v evap
coo l er
Sewer multifamily, comm. or
Industrial
Vent fan with
sinole duct
Storm Sewer 0f Vent systet"r apart from
heatino or A.C.
c0t'1H./IND. FEEDERS Mechanical exhaust
hood and duct
Insta l | /al ter/rel ocatedistrib. feeders tlood stove/heater
0f -amp s.
ISSUANCI OF PFRIIIT
TOTAL CHARGES TOTAL CHARGES TOTAL CHARGES
HHERE STATE LAt.l REQUIRES that the Electrical work be done by an Electrical Contractor, the electrical portion of this permitshall not be valil until the label has been signed by an Electrical Supervisor and returned to the Buildin! Division
I HAVE CAREFULLY EXAMINED the completed apnlication for oe
perfo
rmi t , and do hereb.y that a I information hereon is true
and correct, and I further certif-v that any and all work rmed shall be done in accordance with the 0rdinances of the Ci ty
madeof Springfield and the Laws of the State of Oreqonof any structure without the permission of the Buil
oertaining to the work described herein, and that NC OCCUPANCY will be
di ng Division. I further certify that m.y reqistration u,ith the Builder's
701.055, that if exempt the basis for exemption is noted hereon, and thatBoard is in full force and effect as required by ORSonly subcontractors and employees who are in comcliance with 0l?S 701.055 will be used on this oroject
I'lAl.lE (pl ease pri nt )S I GIIA DATE +ie I
Zone /const)Un it /s Sq.'Ftg. t,lain x Val ;7
Fire Zone Bedrooms 0ccy Load Acces s.
0ther
Value
Flood Plain S to ri es Group Sq X Val
Ftg
Ftg
BUILDING PERNIT
Charges and
Surcha rges
Plan Ck. Conrn/lnd
65%/B1dq Per Fee
Svster:rs Deve
charqe (1.51 0pment
PIan Ck. Res
30%/Bldq Per Fee
PLUI,IEING PERMIT
Charges and
Surcha rges
/Fence
Dgmo
ELECTRICAL PERI|IT
Charges and
Surcha rges
Sidewal k
A/C Paving Total Comb. Permit
MECHANICAL PERMIT
Charges and
Surc ha rges
Curb Cut
TOTAL /c4c
\L
TOTAL VALUATION-
COMBINATION APPLICATION/PERMIT (CAP)
I. Applicant to furnishA. Job AddressB. Legal Description
l. example- Tax Lot 100, Lane County l,lap Reference
17 03 43
?. example- Lot 1. Block 3, Znd Addition to
SF'Fin!"field EstatesC. Name, etc. of owner and construction lenderD. Energy Sources
1.
2.E. Squa
example- heat
example- wate
re footage or
/electrical ceili or forced air gas
ter e ec tr ca or sol ar
va luation,
l. example- 1250 sq. foot house, 500 sq. foot garage2. example- if new project, check new - if addition,
EIEER-add, etc.F. Buill.
ding permit information:
example - construct single family house with an
attached garage
II.
2. example - remodel existing garage into family room3. examFTE - convert single iailily-restaence inio
restaurant (change of use)G. Value of work as defined in Section 303 (a) of theStructural Specialty CodeH. DESIGN TEAM AND CONTRACTORS
To avoid design or construction delays, Building
Division Staff must be able to contact appropriate
persons regarding design information or job sitecorrections, etc.
Abbreviated Plumbing, Mechanical, & Electrica'l SchedulesA. Except where blank spaces occur in the descriptionportion of the Mechanical and Electrical Schedules,
the applicant need fill-in only the No. Boxes adjacentto the appropriate item(s) to be instailedB. Full PIumbing, Mechanical, and Electrical Schedules
are available at the Building Division1. To conserve space on the permit form the schedules
have been abbreviated2. If the item(s) to be installed are not covered on
the abbreviated schedules you should consult theful l schedu lesC. BUILDING DIVISION STAFF HILL FILL OUT ALL FEES AND
CHARGES ON THE SCHEDULES0. As noted on the CAP, the label must be delivered to theelectrical contractor for signature by his electricalsupervisor. The general contractor is not authorizedto sign the e'lectrical label
Appiicant to sign and date
Whenever possible, the initial application will be used as
a worksheet only. Where possible, Building Division Staffwill prepare a Lype written copy and return it to theapplicant at the time the actual permit is issued for his
s i gna ture.
Fees and Charges
PIan check fees are due and payable at the time of theapplication, and no plans will be processed until these
fees are paid. All other fees and charges are due andpayable when the permit is issued.
III.
IV
V. FOR OFFICE USE ONLY
PERMIT VALIDATION
(rL'JqLl
,I-r+B+
Permit Clerk
PROJECT CONDITIONS TO BE SATISFIED BEFORE OCCUPAI{CY:
Permit applicant exempt from registration with the Builder's Board because:
Additional Project Information:
PLANS REVIEWED BY:
name sig nature date