Loading...
HomeMy WebLinkAboutPermit Building 1993-06-07SPNI^rG ELO BLOCK: Zfr, 2 3 NUMBER LOT: TAX LOT: SUBDIVISION LOCATION OF PBOPOSED WORK: ASSESSORS MAP: RESIDENTIAL PERMIT APPLICATION lnspections: 726-3769 Of{ice: 726-3759 225 Fifth Street Springfield, Oregon 97 477 PHONE g7/77ZIP:STATE: -s z/6 82"*.CITY: -- ADDRESS OWNER: ADDITION DEMOLISH OTHER DESCTIBE IVORK: NEW --- REMODEL.- #."//Araf"tAoDBESS 4sy la7 33N?Io"to R "6f,ry EXP,R HONECONTRACTOR'S NAME PLU fvl BlNG ELECTRICAL: RANGE # OF BDRMS OUAD AREA: - OFFICE USE - ZONING CODE: FLOOD PLAIN SECONDARY HEAT: SOUARE FOOTAGE: CONSTR. TYPE: HEAT SOURCE: LAND USE: # OF UNITS WATER HEATER: r OF BLDGS: - OCCY GBOUP: * OF STORIES: Torequestaninspection,youmust call 226-3z6g.Thisisa24hourrecording.All inspectionsrequestedbeforeT:00a.m.will be made the same working day, inspectlons requested after 7:00 a.m. will be made the following work day' REQUIRED INSPECTIONS Temporary Eleclric Rough Mechanical - Prior to cover. Final Plumbing - When all plumbing work is comPlete. Site lnspection - To be made af ter ()xcavalion, but Prior to setting forms. Rough Electrical - Prior to Final Electrical - When all electrical work is comPlete.cover Underslab Plumbing / Electrical / Mechanical - Prior to cover. Electrical Service - Must be approved to obtain Permanent electrical power. Footing - After trenches are exc avated.Fireplace - Prior to faclng materials and framing lnsP. Final Building - When all required inspections have been approved and building is completed.Masonry - Steel location, bond beams, grouting. ,(t--ing - Prior to cover Other Foundation - After forms are erected but prior to concrete placement. Wall/Ceiling lnsulalion - Prior to cover, Underground Plumbing - Prior to f illing trench.l-_l Drywall - Prior to taoing. MOBILE HOME INSPECTIONS Under lloor Plumbing/ Mechanical - Prior to insulation or decking.Wood Stove - After installation Post and Beam - Prior to floor insulation or decking'lnsert - After firePlace aPProval and installation of unit. Blocking and Set.Up - When all blocking is complete. Floor lnsulation - Prior to deckirtg.Curbcut & Approach - After forms are erected but Prior to placement of concrete. Plumbing Connections - When home has been connected to water and sewer. Sanitary Sewer - Prior to filling trencll.Electrical Connection - When blocking, set-up, and Plumbing inspections have been aPProved and the home is connected to the service panel. Storm Sewer - Prior to filling trench. Sidewalk & DrivewaY - After excavation is complete, forms and sub-base material in Place. Water Line - Prior to filling trench. Fence - When comPleted. Street Trees - When all required trees are planted. Final - After all required inspections are approved and porches, skirting, decks, and venting have been installed.Rougl't Plumbing - Prior to cover. E tl E E r E tl r Final Mechanical - When all mechanical work is conlplete. tl rl E E E E Er E tlT Lot faces Lot sq. ftg. Lot coverage Topography Total height Lot Type - lnterior - Corner - Panhandle - Cul-de-sac Setbacks P.L.HSE GAR N S E ACC IS THE PROPOSED WORK IN THE HISTORICAL DISTRICT, OR ON THE HISTOFIICAL REGISTETI? -- lf yes, this application must be signed and approved by the Historical Coordin;rtor prior to permit rssuance. APPROVED: BUILDING PERMIT ITEM SQ. FT.X $/SQ. FT.VALUE Main Garage Carport 5@,'o Total Value Building Permit Fee State Surcharge Total Fee l{"o tfr75 (A) BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT This permit is granted orr the express condition ttrat the said construction shall, in all respects, conform to the Ordinance adoptecl by the City of Springfield, irrclrrding the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plan Check Fee: -Date Paid Beceipt Numbet:---- Received By Plans Reviewed By Date SYSTEMS DEVELOPMENT CHARGE (SDC) (B) Systems Development Charge is due on all undeveloped properties within the City limits which are being itnproved. PLUMBING PERMIT ITEM Fixtures Residential Bath(s) Sanitary Sewer Water Storm Sewer Mobile Home FEE N0 FT, FT. FT. Plumbing Permit State Surcharge Total Charge (c) ADDITIONAL COMMENTS MECHANICAL PERMIT Fu rnace Exhaust Hood Vent Fan N0 Wood Stove/ lnsert/ Fi replace Unit Dryer Vent Mechanical Permit lssuance State Surcharge Total Permit (D) By signature, I state and agree, that I have caref ullT examined the compieted;rpplication and r1o hercby certify that all information hereon is true and correct, and I furthcr certify that any and all work performed shall be done in i.rccordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be m:rde of any structure witlrout permission of the Building Safety Division. I f urther certify that only contractors arrd employees who are in compliance with OHS 701.055 will be used on this proiect. I f urther agree to ensure that all required inspe ctiorls are requested at the proper time, that each address is readable from the street, that thc permit card is locatecj at the front of the property, and the approved set of plans will remain on the site at all ti S con st tion. Xstsn"t*u Date MISCELLANEOUS PERMITS Mobile Home State lssuance State Surcharge Sidewalk - ft Curbcut - ft Demolition State Surcharge Tnlrl IVliceollznpolrs Permi ts (F)TatZ/ /5,?J VALIDATION: RECEIPT NUMBER - gg > I DATE PAID A.*i i t^