Loading...
HomeMy WebLinkAboutPermit Building 1993-07-29SPtrINGFIELE) RESID ENTIA L PERMIT APPLICATION lnspections: 726'3769 O{fice: 726'3759 LOCATION OF PROPOSED WORK:- h, JOB NUMBER 225 Fifth Street Springfield, Oregon 97477 z6-ASSESSORS MAP: LOT: BLOCK:SUBDIVISION PHONE: ZIP:STATE:2 CITY: ADDRESS OWNER: € NEW - REMODEL ADDITION DEMOLISH OTHER DESCRIBE WORK: PHONEEXPI RESADDRESS ELECTRICAL: MECHANICAL: CONTRACTOR'S NAME GEN ERAL. CONST. CONTRACTOR # * OF BDRMS: _ OFFICE USE _ FLOOD PLAIN WATER HEATER: * OF UNITS: SECONDARY HEAT SOUARE FOOTAGE: QUAD AREA: # OF BLDGS ZONING CODE: OCCY GROUP: , OF STORIES CONSTR. TYPE: HEAT SOUFICE: To request an inspection, you must call 726'3769. This is a 24 hour recording' All inspections reques made the same working day, inspections requested after 7:00 a'm' will be made the following work ted before 7:00 a.m day. will be REQUIRED INSPECTIONS fI TemporarY Electric ll Rough Mechanical - Frior to cover. Final Plumbing - When all plumbing work is comPlete. Site lnspection - To be made af ter excavation, but Prior to setting lorms. Rough Electrical - Prior io Final Electrical - When all electrical work is comPlete.cover Underslab Plumbing / Electrical / Mechanical - Prior to cover. Electrical Service - Must be approved to obtain Permanent electrical Power. Final Mechanical - When all mechanical work is comPlete. Footing - After trenches are excavated.Fireplace - Prior to facing materials and framlng lnsP. Final Building - When all required insPections have been approved and building is completed. Masonry - Steel location, bond beams, grouting.Framing - Prior to cover' Foundation -'After forms are erected but Prior to concrete placement. Wl orher Wall/Ceiling lnsulation - Prior to cover Underground Plumbing - Prior to filling trench.[-_l Drywall - Prior to taoing MOBILE HOME INSPE TIONS Underlloor Plumbing/ Mechanical - Prior to insulation or decking'Wood Stove - After in';tallation' Post and Beam - Prior to floor insulation or decki ng.lnsert - After firePlace approval and installation of unit. Blocking and Set'UP - When all blocking is comPlete. Floor lnsulation - Prior to decki ng.Curbcut & Approach - After forms are erected but Prior to placement of concrete. Plumbing Connections - When home has been connected to water and sewer. SanitarY Sewer - Prior to f illing t ren ch.Sidewalk & DrivewaY - After excavation is complete, forms and sub-base material in Place. Electrical Connection - When blocking, set'uP, and Plumbing inspections have been aPProved and the home is connected to the service Panel. Slorm Sewer - Prior to filling trench. Water Line - Prior to filling trench. I-_l Fence - When completed' Final - After all required inspections are aPProved and porches, skirting, decks, and venting have been installed.Street Trees - When all required trees are Planted.Rough Plumbing - Prior to covcr. tl l E E E E E E E E E Lot faces Lot sq. ftg. Lot coverage Topography Total height Lot Type - lnterior - Corner -_ Panhandle - Cul-de-sac Setbacks P.L.HSE GAR N S E ACC IS I'HE PROPOSED WORK IN THE HISTORICAL DISTFIICT, OR ON THE HISTORICAL REGISTEB? -- lf yes, this application must be signed anrl approved by the Historical Coordirrator prior to permit issuance. APi)no\,/ED: VALUE .52 /9.3 I /@_ (A) X $/SQ. FT. Total Value Building Permit Fee State Su rcharge Total Fee BUILDING PERMIT ITEM SQ. FT. Main Garage Carport BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT This permit is grantc(l c,n tho express condi.tion that the said constructiOn shall, rn all respects, conform to the Ordinance adopted by the City of Spri ngfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any J>rovisions of said ordinances. Plans Reviewecl By Date Pian Check Fee: - Date Paicl Receipt Nurnbcr: Received By: SYSTEMS DEVELOPMENT CHARGE (SDC) (B) Systems Development Chitrge is due on all uncleveloped properties within the City limits which are being irnproved. ITEM Fixtu res Residential Bath(s) Sanitary Sewer Water Storm Sewer Mobile Home FEE (c) N0 FT. FT. FT. PLUMBING PERMIT Plumbing Permit State Surcharge Total Charge ADDITIONAL COMMENTS Wood Stove/ lnsert/ Fi replace Unit Dryer Vent (D) N0Vent Fan Mechanical Permit lssuance State Surcharge Total Permit MECHANICAL PERMIT Fu rnace Exhaust Hood By signature, I state antl agree, that I have caref ully examinecl the completed application and do hereby certify that all information hereon is true and correct, and I f urther certify that any and all work pcrformed shall be done in accordance with the Ordinances o{ the City of Springfield, and the Laws of the State of Oregon pertaining to the work clescribed herein, and that NO OCCUPANCY wilt be made of any structure without permission of the Building Safety Division. I further certify that orrly conlractors and employees who are in compliance with ORS 701.055 will be used on this project. I f urther agree to ensure that all required inspectio6s are requested at the proper time, that each address is readable from the street, that the permit card is located at the f ront of the property, and the approved set of plans will remain 23Date7-?7- St to Sig natu re on the site at all times durin MISCELLANEOUS PERMITS Mobile Home State lssuance State Surcharge Sidewalk - ft Curbcut - ft Demolition State Surcharge Total Miscellaneous Permits (E) TOTAL AMOUNT DUE (excluding electrical) (A, B, C, D, and E Combined) /E== ?qeDATE PAID AMOUNT BECEIVED RECEIVED BY VALIDATION: RECEIPT NUMBER ,/b-