Loading...
HomeMy WebLinkAboutPermit Building 2020-01-13OREGON Web Address: www.springfi eld-or.9ov Building Permit Commercial Structural Permit Number: 81 1-19-OO19O4-STR IVR Number: 811034109393 City of Springfield Development and Public Works 225 Fifth Street Springfield, OR97477 54t-726-3753 Email Address: permitcenter@springfield-or.gov SPRINGFI b Permit Issued: January L3,2O2O TYPE OF WORK Category of Construction: Commercial Submitted Job Value: $42,600.00 Description of Work: Walmart TI for fedex Type of Work: Tenant Improvement JOB SITE INFORMATION Worksite Address 2659 OLYMPIC ST Springfield, OR97477 Parcel t703254403600 Owner: Address: WAL-MART REAL ESTATE BUSINESS TRUST PO BOX 8050 BENTONVILLE, AR727L2 LICENSED PROFESSIONAL INFORMATION Business Name SB CONSTRUCTION LLC A LIMITED LIABILITY COMPANY OF UTAH - Primary OWNER License ccB ccB License Number 225023 000000 Phone 80L-23t-77LL PENDING INSPECTIONS Inspection 1999 Final Building 8999 Final Fire 1260 Framing 1540 Gypsum Boa rdlLath/Drywall 1600 Ceiling Grid Inspection Group Struct Com Fire Struct Com Struct Com Struct Com Inspection Status Pending Pending Pending Pending Pending SCHEDULING INSPECTIONS various inspections are minimally required on each proiect and often dependent on the scope of work. contactthe issuing jurisdiction indicated on the permit to determine required inspections for this project. Schedure or track inspections at www.buirdingpermits.oregon.gov call or text the word "schedule" to 1-888-299-2821 use IVR number: g110341og3g3 Schedule using the oregon ePermitting Inspection App, search ',epermitting,, in the app store Ifl::t:,il"#.lJ:'1ff:t started within l8o Davs of issuance or if work is suspended for 180 Days or lonser dependins on All Provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not.:#,:1,il::j"::H,:::1li:::?:n"f":,;"::1,1;n.,i" ",.."i. ";;;'l[J,.ovisions orany o*,.."iate or roca,aw ATTENTToNt oregon law requires you to follow rules adopted by the oregon utirity.Ivotification center. Those rures are setl:Tlr;#" es2-oor-oolo through o; ,-;;;;:;;eo. you d;;;;;;ils or *re rures by carins in".I"n,", at (so3)All persons or entities Derfi :r:j:,.",;,,r:""-H",i:[i'J[3Hi:,::il::;1Jil-'J:;:5i.,1[p,Xffi1:n'ess exemp,ed bv oRs 7o1 olo c: Page 1 of 2 \myReports/report s / / production / o r STANDARD li..,L-/ Permit Number: 81 1-19-OO19O4-STR Page 2 of 2 Fee Description Technology Fee Structural building permit fee Structural plan review fee State of Oregon Surcharge - Bldg (l2o/o of applicable fees) Printed on: 1/13/20 Quantity Total Feesr Fee Amount $47.86 $s80.06 $377.04 $69.61 $t,074.s7 Page 2 of 2 C : \myReports/reports//production/0 1 STAN DARD PERMIT FEES Cnv or SpRTNcFIELD, oREcoN Structural Permit Application 225 Fifth Street r Springfield, OR97477 . PH(541)726-37 53 . FAX(54 I )726-3689 ru# 6^S ).rt,--o^-A) /w<- %r,.- rN^ g\^"- \tir,rruao["1,y""^' Y"'c* Jqo - o-+rl-as+ \ DEPARTMENT USE ONLY permit no.:[C1- CO\q DL{ I I Date:$ \ It" \\1 This permit is issued under OAR 9f 8-460-0030. Permits expire if work is not started within 180 days of issuance or if work is suspended for 180 days. This project has final land-use approval. Signature:Date: This project has DEQ approval. Sigpature:Date: Zoning approval verified: ! Yes E No Property is within flood plain: E Yes E t'lo CATEGORY OF CONSTRUCTION E Residential E Govemment E Commercial Job site address: 2659 Olympic Street City: Sprinqfield State: OR ZrP: $f ll SuMivision:Lot no Relerence:raxlot: \-l o315t{ t{ A3trot Name: Walmart Real Estate Business Trust Address: 702 SW 8th Street City: Bentonville State: AR ZIP:7271 Phone: 479.273.4000 Fax:479-2738350 E-mail: ifl etcher@rhaaia.com Building Owner or Owner's agent authorizing this application sign here: JoYce Fletcher ry!ft&rfre*@ffi,q4.|!l@.=6 E This instailation is being made on residential or farm property owned by me or a member of my immediate family, and is exempt from licensing requirements under ORS 701.010. CONTRACTOR INSTALLATION Businessname:€uttcrttkt A Conytn.Jrlrn Address: City:State: Phone:Fax: E-mail CCB licenseno.'32(Of,3 Print nam9r,----\ S Name CCB License #Phone Electrical Plumbing Mechanical o(F- [v\s,r+(a) Job description: 1gnsr.t1 improvement tdd Construction type: Square feet: 42 Occupancy M Cost per square foot: Other information: Type of Heat: Energy Path: ! new Ealteration n addition (b) Foundation-only permit? E Yes El No s 42,600.00Total valuation: (a) Permit fee (use valuation table):$ 576.66 (b) Investigative fee (equal to [2a]):$ 576.66 / $ (c) Reinspection ($ perhour): (number ofhours x fee per hour) (d) Enter l2oZ surcharge (.12 xl2a+2b+2c)):$1 (e) Subtotal of fees above (2a through 2d):s1 72 3. Plan review fees $(a) Plan review (65olo x permit fee [2a]): $(b) Fire and life safety (65% x permit fee [2a]): $74 )66(c) Subtotal offees above (3a and 3b): 4- Miscellaneous fees (a) Seismic fee, l%;o (.01 x permit fee [2a]):s (b) Tech fee, 5% (.05 x permit fee[2a]+PR fee [3c])$ TOTAL fees and surcharges (2er3cr4a+b):1.38s Last edited 5-5-20 I 9 BJones LOCAL GOVERNMENT APPROVAL JOB SITE INFORMATION AND LOCATION PROPERTY OWNER ZIP: SUB.CONTRACTOR INFORMATION FEE SCHEDULE 1. Valuation information 2. Buildine fees Transaction Receipt 81 1-19-001904.sTR Receipt Number: 472080 Receipt Date: 8/16/19 City of Springfield Development and Public Works 225 Fifth Street Springfield, OR97477 541-726-3753 perm itcenter@spri ngf ield-or.gov www. spri ngfield-or. gov Worksite address: 2659 OLYMPIC ST, Spnngfield, OR97477 Parcel: 1703254403600 Fees Paid Transactlon date 8/16/ 1 9 Unlts 1.00 Ea Fee amount $377.04 Pald amount $374.83 Descrlption Slruclural plan revianr fee Account code 224-00000-425602-1 030 Payment Method: Check number: 7626 Transaclion Commenl: recd via mail Payer: Permil Fee Account Payment Amount:$374.83 Cashier: Katrina Anderson Printed: 8/16/19 10r48 am Page I of 1 Recelpt Total:$374.83 FIN_Transaclion Receipt_pr # Architect 2l I N. Record Street, Suite 222 Dallas, Texas, 75202 Telephone 21 417 49 -0626 Fax2l4l748-0656 THESE ARE.TRANSMITTED: Eto*YouRUSE E oo*REVrEw&coMMENr lronAPPRovAL E ronAcrroNASNorED LETTER OF TRANSMITTAL DArE: 8/9/19 JoB: 1908065 RE: Fed Ex Office - TI #2822 Springfield, OR TO:Springfield Development & Public Works Dept. Attn: Chris Carpenter, Plans Examiner 225 Fifth Street Springfield, OP.,97477 54t.744.4t53 WE ARE SENDING YOU Elrrecsen EuNoensEpARATECovER vrA I IPs ?od dav THE FOLLOWINC ITEMS:E sHop DRAwTNGS E pzuNrs EspscrprcerroNs Eorsruer-rcrRoNrc FrLE I E os *quusruo E ns rueursrED BY REMARKS: Please find enclosed the buildine submittal for your review and approval. Please provide COPIES DESCRIPTION 3 sets Construction drawings - including racking drawings I Commercial Checklist I Planning Division Information Sheet I Structural Permit application I Check for review fees of#374.83 2 sets Structural calculations a receipt for the fees received via email for fax. If there's any'thing further needed to complete your review please don't hesitate to contact me. We look forward to receiving your approval! Thank youl Joyce Fletcher, Project Administrator 479.316.8109 I Fax 479.316.8145 i fl etcher(arrhaaia. com COPY: File IF ENCLOSURES ARE NOT AS NOTED, KINDLY NOTIFY US AT ONCE.SIGNED Trevor T. Holcomb 'l'revor'I. llolcomb AIA SPRINGFIELD % OREGON City of Springfield Permit #811-SPR l0 Building Safety/ Community Services Division Development Services Department 225Fifrh Sfeet, Springfield, OR 97477 ph: (541) 726-3753 fax: (541) 726-3689 Commercial Building Permit Submittal Requirements / Checklist Check each box to veri$ requirements are met. Submit 3 full sets of plans with the following applicable information (Submit only 2 sets of specifications, engineering calculations, product listings' etc...) I. Planning- Project Approval -Yes X No II. Public Works- Project Approval -Yes X No III. Site Plan REQUIRED FOR ALL APPLICATIONS,INCLUDING INTERIOR REMODELS Legible & drawn to scale (such as l":20') and include North arrow Include property line locations & existing public and private easements (utility, driveway, etc.) with dimensions Include the location of public and private utilities (water, electric, sewer, gas) _lf on septic system, show tank and drain field locations _lndicate any water ways & wet lands areas on property _Show existing and proposed finished grade based on spot elevations and contours over entire site ,/Show adjacent street names _Perimeter outline of existing & proposed structures with distances to all property lines & between structures; setbacks shall be identified with written dimensions as well as to scale _Indicate height of all structures _Show building & garage entrances as well as driveway & access location from street _Parking lot layout with required spaces (including disabled) _Building surface coverage calculations (square footage of lot, of footprint & percentage of lot coverage) _Show site drainage using arrow to indicate direction of flow, also indicate square footage of impervious surfaces which will include asphalt, concrete, roofing, etc. _lndicate all projections from exterior walls, including overhangs, awnings, etc. /For additions / remodels, indicate area on footprint to be altered IV. Plans 1!.egible and drawn to scale (such as %": t'-0") aAny building resulting in the footprint of 4,000 square feet or greater OR with a ceiling height 20' or more above grade needs to have an Engineer's or Archilect's seal and signature. /Wet-signature Stamped Engineering, Design Criteria, Calculations and Specifications, including energ/ path .1 Engineering specifications and construction details must be transferred to the plans Deferred Submittals must be listed on the cover sheet of construction documents. A Defened Submittal Form must be completed prior to permit issuance- http://www.springfield-or.gov/dsd/Building/Forms.htm _Code Analysis Layout including Fire and Life Safety plan review _Civil Drawings, all sheets to include parking, fire semice lines, water lines, etc. _Foundation Plan _lndicate size & location of all footing types, posts, girders, hold-downs & straps and under floor access openings & vents Include details (with scale indicated) of each footing type & retaining wall to be used showing size, reinforcing, wall heights & framing connections _Provide desigr calculations for retaining walls and/or special footings _Elevations (l for each side of building) _Typical cross secti ons _The main sections shall show all foundation & framing components including but not limited to: floors, walls & ceiling, main structural members, sheathing, siding, roofing and bracing _For two story structures: include a complete stair section indicating stair rise & run, headroom clearance, framing & support members and handrail/guardrail details Include any additional framing section needed to demonstrate any unique framing condition not shown by the main section Laleral bracing details ../ Detailedjoor plans with square footage & systems layout / Show entire floor plan of new construction Tlndicate existing and/or new square footages .,/ldentiff & label use of each room, space or area Indicate dimensions of all building sides & interior wall locations _lndicate all window & door sizes & locations _Show system layout of all plumbing, heating & air conditioning, mechanical equipment, etc (indicate electric or gas) include non-residential energy forms lenergy forms can be printed from www.energy.state.or.us) ./Sto* electrical layout including room lighting, outlets, fans, exhaust vents, etc. -Floorfriming_Provide a plan for each framed floor _lndicate location & sizes of all posts & beams; show joist sizes & spacing _lndicate post & beam connections _Roof framing (if using Roof Trusses provide engineered details of all trusses to be used, including a layout indicating the placement of each truss) _lndicate location, spacing & sizes of rafters & ceiling joists or roof trusses _lndicate location, size & type of suspended ceiling system _Show carrier trusses & type of hurricane clips to be installed at each truss _lndicate solid blocking between rafters at point of bearing and truss bracing _lndicate headers sizes for door & window locations _Electrical Plan Review for Complex Structures If the scope of electrical work meets the definition of complex structure in OAR 918-31l-0040, an electrical plan submittal meeting the requirements of OAR 9l 8-3 I I -000 shall apply. V. Medical Gas Plans "Medical Gas" means any gas and vacuum system or equipment intendedfor mcdical and dental procedures in health care and non-health carefacilities (Le Orygen, Nilrous Oxide, Medical Air, Medical Vacuum, etc.) _Medical Gas System (Engineer stamped plans, specifications, and calculations are required) Level 3 Dental Air and Dental Vacuum Systems (Plans designed to equipment manufaclurer's inslallation standard are required) All Plans to include: Location of all piping, valves, vacuum pumps and compressors _Size and type of all piping and fittings Location and type of all alarms and outlets Location and volume of all supply gas _Specifications of vacuum pumps and compressors _Ventilation requirements for equipment, supply, and storage areas YI. Self-Preservation - Medical and Dental Facilities Will there be use of procedures that render a patient incapable of unassisted self-preservation? _Yes _No VII. Address /V*iaphysical address is required on application. Proper building or suite number must be provided to the building division prior to permit issuance. Provide 8 ll2" by 11" floor plan for proper suite number assignment and/or, if more than one building on lot, provide 8 ll2" by I 1 " site plan for YIII. Special Cifcumstances - Demolitioll (separate demotition rpplication must be filled out) Demo w6rk to take place? "zfYes -No (Any commercial project requiring demolirion is required to submit an iwpection by a certi/ied ircpection company stating that Nbestos hu been removed properly.) proper building number assignment. IX. Special Inspections Special inspections required? _Yes _No ; ny commercial project requiring special ircpections requires submittal of a complete Special Inspection Form before permir issuance- http://www.springfield-or.gov/dsd/Building/Forms.hlm X. Special Circumstances - Grading Any commercial project increuing footprint square footage, any new or modified impemious surface will require Grading sign offor plan reyiew and site ircpection prior to fiml building inspection. Applicant shall submit grading plan to Public llorks. _Project requires Grading sign off XI. Special Circumstances - Waste Water The Following Businesses May Require Wasle Water Review: Auto Body Repair & Paint Shops, Auto Repair (Mechanical) Engine & Transmission, Auto Wash, Breweries, Blue Printing/Photocopying, Chemical Manufacturing, Electroplating/metal finishing, Laundries, Leather Tanning, Machine / Sheet Metal Shops, Medical/Dental Vacuum System Equipment Drainage, Millwork, Pharmaceutical Manufacturing, Photo Processing, Plastic / Synthetic Manufacturing, Print Shops, Service Stations, etc... _Project requires waste water review The Following Businesses May Also Require an Oil/Water Sepmalor: Auto Body Repair & Paint Shops, Auto Repair (Mechanical) Engine & Transmission, Auto Wash, Service Stations _Project requires oil/water separator All Restaurants & Food Sertice F,stablishments (Including Small Deli Types) Require Grease Interceptors _Project requires grease interceptor XII. Special Circumstances - Food-Related Activities _Will there be any food- or beverage-related activities? _Food Service (i.e. restaurant, deli, caf6, coffee shop, brew pub, catering operation, mobile food vendor, etc) _Food or Beverage Processing, Manufacturing, Sales, Warehousing/Distribution (i.e. grocery store, convenience store, home-based food business, beverage production and/or sales; includes wine, nonalcoholic beverages, bottled water, brewery, etc.), food products warehouse, bakery, meat market, food processing (includes the manufacture and/or handling ofany food product). XIII. Egress Lighting If there is a requirement to complete an egress lighting inspection, we offer this service after hours for those customers interested in not having to 'black-out' the facility for inspection. Additional fees are required for after- hours inspections. Note: Additional fees may be charged for phased construction, deferred submittals and project revisions. I do hereby certify that all information hereon is true and accurate and that I am responsible for submitting the applicable items to the appropriate departments. Trevor T. Holcomb / Architect (Design Professional, Builder or Propefi Owner)/ Print Nume/ Association t'ith Project rCity of Springfield Development Services DePartment 225 Fifth Street Springfield , OR 97477 Planning Division Information Sheet for Building Permits Commercial/Industria!/ Multi-Family Residential The Planning Division requires the following information for all building permit submittals on properties zoned Medium Density Residential, High Density Residential, Commercial, or Industrial, including new construction, expansions, and changes of use. New construction, expansions, and changes of use to any building, parking, or development area in these zoning districts requires either Minimum Development Standards-MDS review (SDC 5.15-100) or Site Plan Review (SDC 5.17-100) by the Planning Division. Overlay District Development review (SDC 3.3-100) may also be required, depending on the site. NOTE: It is prudent to make sure your use is permitted in the applicable zoning district. Building Permit, Police or other permit approvals or inspections are not Planning approval. SPR!NGFIELD phone: 479.316.8109Applicant Name: Joyce Fletcher, Project Administrator Fax: 479.316.8145Company: Trevor T. Holcomb Architect Address: 211 N. Record Street, Suile222, Dallas, TX,75202 TAX LOT NO(S):ASSESSOR'S MAP NO: 1703254403600 Description of the proposed work to be completed under this building permit: Tenant improvement for a Fed Ex Office going into an existing 421 sf tenant space in Walmart. Address: 2659 Olympic Street Has this development proposal been reviewed by the Planning Division through an application process (i,e. lrlDS or Site Plan Review)? If yes, Case #: If no, is this a change in use? E Yes El no Dves Exo Prior APProved Use: Mercantile Proposed Use: Mercantile TOTZ:Zonin Ove s Does the use necessitate the use of any chemicals or substances that are hazardous or Sheets NoMSDYesto be ke on site?anduire Material The proposed project requires submittal and approval of the following Planning application prior to building permit approval: E oWp Overlay District Development E tloS E slte Plan Review E Statement Letter Regarding DWP Exemption E t{oS Land Use Compatibility Statement n other: Date:Reviewed by: Required Project Information (Applica ntr complete this section ) Requi red Property Information (City Intakei Staffi complete this section)