HomeMy WebLinkAboutPermit Building 2020-01-13OREGON
Web Address: www.springfi eld-or.9ov
Building Permit
Commercial Structural
Permit Number: 81 1-19-OO19O4-STR
IVR Number: 811034109393
City of Springfield
Development and Public Works
225 Fifth Street
Springfield, OR97477
54t-726-3753
Email Address: permitcenter@springfield-or.gov
SPRINGFI
b
Permit Issued: January L3,2O2O
TYPE OF WORK
Category of Construction: Commercial
Submitted Job Value: $42,600.00
Description of Work: Walmart TI for fedex
Type of Work: Tenant Improvement
JOB SITE INFORMATION
Worksite Address
2659 OLYMPIC ST
Springfield, OR97477
Parcel
t703254403600
Owner:
Address:
WAL-MART REAL ESTATE
BUSINESS TRUST
PO BOX 8050
BENTONVILLE, AR727L2
LICENSED PROFESSIONAL INFORMATION
Business Name
SB CONSTRUCTION LLC A
LIMITED LIABILITY COMPANY OF
UTAH - Primary
OWNER
License
ccB
ccB
License Number
225023
000000
Phone
80L-23t-77LL
PENDING INSPECTIONS
Inspection
1999 Final Building
8999 Final Fire
1260 Framing
1540 Gypsum Boa rdlLath/Drywall
1600 Ceiling Grid
Inspection Group
Struct Com
Fire
Struct Com
Struct Com
Struct Com
Inspection Status
Pending
Pending
Pending
Pending
Pending
SCHEDULING INSPECTIONS
various inspections are minimally required on each proiect and often dependent on the scope of work. contactthe issuing jurisdiction indicated on the permit to determine required inspections for this project.
Schedure or track inspections at www.buirdingpermits.oregon.gov
call or text the word "schedule" to 1-888-299-2821 use IVR number: g110341og3g3
Schedule using the oregon ePermitting Inspection App, search ',epermitting,, in the app store
Ifl::t:,il"#.lJ:'1ff:t started within l8o Davs of issuance or if work is suspended for 180 Days or lonser dependins on
All Provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not.:#,:1,il::j"::H,:::1li:::?:n"f":,;"::1,1;n.,i" ",.."i. ";;;'l[J,.ovisions orany o*,.."iate or roca,aw
ATTENTToNt oregon law requires you to follow rules adopted by the oregon utirity.Ivotification center. Those rures are setl:Tlr;#" es2-oor-oolo through o; ,-;;;;:;;eo. you d;;;;;;ils or *re rures by carins in".I"n,", at (so3)All persons or entities Derfi
:r:j:,.",;,,r:""-H",i:[i'J[3Hi:,::il::;1Jil-'J:;:5i.,1[p,Xffi1:n'ess exemp,ed bv oRs 7o1 olo
c:
Page 1 of 2
\myReports/report s / / production / o r STANDARD
li..,L-/
Permit Number: 81 1-19-OO19O4-STR Page 2 of 2
Fee Description
Technology Fee
Structural building permit fee
Structural plan review fee
State of Oregon Surcharge - Bldg (l2o/o of applicable fees)
Printed on: 1/13/20
Quantity
Total Feesr
Fee Amount
$47.86
$s80.06
$377.04
$69.61
$t,074.s7
Page 2 of 2 C : \myReports/reports//production/0 1 STAN DARD
PERMIT FEES
Cnv or SpRTNcFIELD, oREcoN
Structural Permit Application
225 Fifth Street r Springfield, OR97477 . PH(541)726-37 53 . FAX(54 I )726-3689
ru#
6^S ).rt,--o^-A) /w<-
%r,.- rN^ g\^"- \tir,rruao["1,y""^' Y"'c*
Jqo - o-+rl-as+ \
DEPARTMENT USE ONLY
permit no.:[C1- CO\q DL{
I I
Date:$ \ It" \\1
This permit is issued under OAR 9f 8-460-0030. Permits expire if work is not started within 180 days of issuance or if work is
suspended for 180 days.
This project has final land-use approval.
Signature:Date:
This project has DEQ approval.
Sigpature:Date:
Zoning approval verified: ! Yes E No
Property is within flood plain: E Yes E t'lo
CATEGORY OF CONSTRUCTION
E Residential E Govemment E Commercial
Job site address: 2659 Olympic Street
City: Sprinqfield State: OR ZrP: $f ll
SuMivision:Lot no
Relerence:raxlot: \-l o315t{ t{ A3trot
Name: Walmart Real Estate Business Trust
Address: 702 SW 8th Street
City: Bentonville State: AR ZIP:7271
Phone: 479.273.4000 Fax:479-2738350
E-mail: ifl etcher@rhaaia.com
Building Owner or Owner's agent authorizing this application
sign here: JoYce Fletcher ry!ft&rfre*@ffi,q4.|!l@.=6
E This instailation is being made on residential or farm property owned
by me or a member of my immediate family, and is exempt from
licensing requirements under ORS 701.010.
CONTRACTOR INSTALLATION
Businessname:€uttcrttkt A Conytn.Jrlrn
Address:
City:State:
Phone:Fax:
E-mail
CCB licenseno.'32(Of,3
Print nam9r,----\
S
Name CCB License #Phone
Electrical
Plumbing
Mechanical
o(F-
[v\s,r+(a) Job description: 1gnsr.t1 improvement tdd
Construction type:
Square feet: 42
Occupancy M
Cost per square foot:
Other information:
Type of Heat:
Energy Path:
! new Ealteration n addition
(b) Foundation-only permit? E Yes El No
s 42,600.00Total valuation:
(a) Permit fee (use valuation table):$ 576.66
(b) Investigative fee (equal to [2a]):$ 576.66 /
$
(c) Reinspection ($ perhour):
(number ofhours x fee per hour)
(d) Enter l2oZ surcharge (.12 xl2a+2b+2c)):$1
(e) Subtotal of fees above (2a through 2d):s1 72
3. Plan review fees
$(a) Plan review (65olo x permit fee [2a]):
$(b) Fire and life safety (65% x permit fee [2a]):
$74 )66(c) Subtotal offees above (3a and 3b):
4- Miscellaneous fees
(a) Seismic fee, l%;o (.01 x permit fee [2a]):s
(b) Tech fee, 5% (.05 x permit fee[2a]+PR fee [3c])$
TOTAL fees and surcharges (2er3cr4a+b):1.38s
Last edited 5-5-20 I 9 BJones
LOCAL GOVERNMENT APPROVAL
JOB SITE INFORMATION AND LOCATION
PROPERTY OWNER
ZIP:
SUB.CONTRACTOR INFORMATION
FEE SCHEDULE
1. Valuation information
2. Buildine fees
Transaction Receipt
81 1-19-001904.sTR
Receipt Number: 472080
Receipt Date: 8/16/19
City of Springfield
Development and Public Works
225 Fifth Street
Springfield, OR97477
541-726-3753
perm itcenter@spri ngf ield-or.gov
www. spri ngfield-or. gov
Worksite address: 2659 OLYMPIC ST, Spnngfield, OR97477
Parcel: 1703254403600
Fees Paid
Transactlon date
8/16/ 1 9
Unlts
1.00 Ea
Fee amount
$377.04
Pald amount
$374.83
Descrlption
Slruclural plan revianr fee
Account code
224-00000-425602-1 030
Payment Method: Check number: 7626
Transaclion Commenl: recd via mail
Payer: Permil Fee Account Payment Amount:$374.83
Cashier: Katrina Anderson
Printed: 8/16/19 10r48 am Page I of 1
Recelpt Total:$374.83
FIN_Transaclion Receipt_pr
#
Architect
2l I N. Record Street, Suite 222
Dallas, Texas, 75202
Telephone 21 417 49 -0626
Fax2l4l748-0656
THESE ARE.TRANSMITTED:
Eto*YouRUSE E oo*REVrEw&coMMENr
lronAPPRovAL E ronAcrroNASNorED
LETTER OF TRANSMITTAL
DArE: 8/9/19 JoB: 1908065
RE: Fed Ex Office - TI
#2822 Springfield, OR
TO:Springfield Development & Public Works Dept.
Attn: Chris Carpenter, Plans Examiner
225 Fifth Street
Springfield, OP.,97477
54t.744.4t53
WE ARE SENDING YOU Elrrecsen EuNoensEpARATECovER vrA I IPs ?od dav
THE FOLLOWINC ITEMS:E sHop DRAwTNGS E pzuNrs EspscrprcerroNs Eorsruer-rcrRoNrc FrLE
I
E os *quusruo
E ns rueursrED BY
REMARKS: Please find enclosed the buildine submittal for your review and approval. Please provide
COPIES DESCRIPTION
3 sets Construction drawings - including racking drawings
I Commercial Checklist
I Planning Division Information Sheet
I Structural Permit application
I Check for review fees of#374.83
2 sets Structural calculations
a receipt for the fees received via email for fax. If there's any'thing further needed to complete your review
please don't hesitate to contact me. We look forward to receiving your approval!
Thank youl
Joyce Fletcher, Project Administrator
479.316.8109 I Fax 479.316.8145
i fl etcher(arrhaaia. com
COPY: File
IF ENCLOSURES ARE NOT AS NOTED,
KINDLY NOTIFY US AT ONCE.SIGNED Trevor T. Holcomb
'l'revor'I.
llolcomb
AIA
SPRINGFIELD
%
OREGON
City of Springfield Permit #811-SPR l0
Building Safety/ Community Services Division
Development Services Department
225Fifrh Sfeet, Springfield, OR 97477
ph: (541) 726-3753 fax: (541) 726-3689
Commercial Building Permit Submittal Requirements / Checklist
Check each box to veri$ requirements are met.
Submit 3 full sets of plans with the following applicable information
(Submit only 2 sets of specifications, engineering calculations, product listings' etc...)
I. Planning- Project Approval
-Yes
X No
II. Public Works- Project Approval
-Yes
X No
III. Site Plan REQUIRED FOR ALL APPLICATIONS,INCLUDING INTERIOR REMODELS
Legible & drawn to scale (such as l":20') and include North arrow
Include property line locations & existing public and private easements (utility, driveway, etc.) with dimensions
Include the location of public and private utilities (water, electric, sewer, gas)
_lf on septic system, show tank and drain field locations
_lndicate any water ways & wet lands areas on property
_Show existing and proposed finished grade based on spot elevations and contours over entire site
,/Show adjacent street names
_Perimeter outline of existing & proposed structures with distances to all property lines & between
structures; setbacks shall be identified with written dimensions as well as to scale
_Indicate height of all structures
_Show building & garage entrances as well as driveway & access location from street
_Parking lot layout with required spaces (including disabled)
_Building surface coverage calculations (square footage of lot, of footprint & percentage of lot coverage)
_Show site drainage using arrow to indicate direction of flow, also indicate square footage of impervious
surfaces which will include asphalt, concrete, roofing, etc.
_lndicate all projections from exterior walls, including overhangs, awnings, etc.
/For additions / remodels, indicate area on footprint to be altered
IV. Plans
1!.egible and drawn to scale (such as %": t'-0")
aAny building resulting in the footprint of 4,000 square feet or greater OR with a ceiling height 20' or more above
grade needs to have an Engineer's or Archilect's seal and signature.
/Wet-signature Stamped Engineering, Design Criteria, Calculations and Specifications, including energ/ path
.1 Engineering specifications and construction details must be transferred to the plans
Deferred Submittals must be listed on the cover sheet of construction documents. A Defened Submittal
Form must be completed prior to permit issuance- http://www.springfield-or.gov/dsd/Building/Forms.htm
_Code Analysis Layout including Fire and Life Safety plan review
_Civil Drawings, all sheets to include parking, fire semice lines, water lines, etc.
_Foundation Plan
_lndicate size & location of all footing types, posts, girders, hold-downs & straps and under floor
access openings & vents
Include details (with scale indicated) of each footing type & retaining wall to be used showing
size, reinforcing, wall heights & framing connections
_Provide desigr calculations for retaining walls and/or special footings
_Elevations (l for each side of building)
_Typical cross secti ons
_The main sections shall show all foundation & framing components including but not limited to:
floors, walls & ceiling, main structural members, sheathing, siding, roofing and bracing
_For two story structures: include a complete stair section indicating stair rise & run, headroom
clearance, framing & support members and handrail/guardrail details
Include any additional framing section needed to demonstrate any unique framing condition not
shown by the main section
Laleral bracing details
../ Detailedjoor plans with square footage & systems layout
/ Show entire floor plan of new construction
Tlndicate existing and/or new square footages
.,/ldentiff & label use of each room, space or area
Indicate dimensions of all building sides & interior wall locations
_lndicate all window & door sizes & locations
_Show system layout of all plumbing, heating & air conditioning, mechanical equipment, etc (indicate
electric or gas) include non-residential energy forms lenergy forms can be printed from www.energy.state.or.us)
./Sto* electrical layout including room lighting, outlets, fans, exhaust vents, etc.
-Floorfriming_Provide a plan for each framed floor
_lndicate location & sizes of all posts & beams; show joist sizes & spacing
_lndicate post & beam connections
_Roof framing (if using Roof Trusses provide engineered details of all trusses to be used, including a
layout indicating the placement of each truss)
_lndicate location, spacing & sizes of rafters & ceiling joists or roof trusses
_lndicate location, size & type of suspended ceiling system
_Show carrier trusses & type of hurricane clips to be installed at each truss
_lndicate solid blocking between rafters at point of bearing and truss bracing
_lndicate headers sizes for door & window locations
_Electrical Plan Review for Complex Structures
If the scope of electrical work meets the definition of complex structure in OAR 918-31l-0040, an
electrical plan submittal meeting the requirements of OAR 9l 8-3 I I -000 shall apply.
V. Medical Gas Plans
"Medical Gas" means any gas and vacuum system or equipment intendedfor mcdical and dental procedures in
health care and non-health carefacilities (Le Orygen, Nilrous Oxide, Medical Air, Medical Vacuum, etc.)
_Medical Gas System (Engineer stamped plans, specifications, and calculations are required)
Level 3 Dental Air and Dental Vacuum Systems (Plans designed to equipment manufaclurer's inslallation
standard are required)
All Plans to include:
Location of all piping, valves, vacuum pumps and compressors
_Size and type of all piping and fittings
Location and type of all alarms and outlets
Location and volume of all supply gas
_Specifications of vacuum pumps and compressors
_Ventilation requirements for equipment, supply, and storage areas
YI. Self-Preservation - Medical and Dental Facilities
Will there be use of procedures that render a patient incapable of unassisted self-preservation? _Yes _No
VII. Address
/V*iaphysical address is required on application. Proper building or suite number must be
provided to the building division prior to permit issuance. Provide 8 ll2" by 11" floor plan for proper
suite number assignment and/or, if more than one building on lot, provide 8 ll2" by I 1 " site plan for
YIII. Special Cifcumstances - Demolitioll (separate demotition rpplication must be filled out)
Demo w6rk to take place? "zfYes -No
(Any commercial project requiring demolirion is required to submit an iwpection by a certi/ied
ircpection company stating that Nbestos hu been removed properly.)
proper building number assignment.
IX. Special Inspections
Special inspections required? _Yes _No ; ny commercial project requiring special ircpections requires submittal of a complete
Special Inspection Form before permir issuance- http://www.springfield-or.gov/dsd/Building/Forms.hlm
X. Special Circumstances - Grading
Any commercial project increuing footprint square footage, any new or modified impemious surface will require Grading sign offor plan
reyiew and site ircpection prior to fiml building inspection. Applicant shall submit grading plan to Public llorks.
_Project requires Grading sign off
XI. Special Circumstances - Waste Water
The Following Businesses May Require Wasle Water Review:
Auto Body Repair & Paint Shops, Auto Repair (Mechanical) Engine & Transmission, Auto Wash, Breweries,
Blue Printing/Photocopying, Chemical Manufacturing, Electroplating/metal finishing, Laundries, Leather Tanning,
Machine / Sheet Metal Shops, Medical/Dental Vacuum System Equipment Drainage, Millwork, Pharmaceutical
Manufacturing, Photo Processing, Plastic / Synthetic Manufacturing, Print Shops, Service Stations, etc...
_Project requires waste water review
The Following Businesses May Also Require an Oil/Water Sepmalor:
Auto Body Repair & Paint Shops, Auto Repair (Mechanical) Engine & Transmission,
Auto Wash, Service Stations
_Project requires oil/water separator
All Restaurants & Food Sertice F,stablishments (Including Small Deli Types) Require Grease Interceptors
_Project requires grease interceptor
XII. Special Circumstances - Food-Related Activities
_Will there be any food- or beverage-related activities?
_Food Service (i.e. restaurant, deli, caf6, coffee shop, brew pub, catering operation, mobile food vendor, etc)
_Food or Beverage Processing, Manufacturing, Sales, Warehousing/Distribution (i.e. grocery store,
convenience store, home-based food business, beverage production and/or sales; includes wine, nonalcoholic
beverages, bottled water, brewery, etc.), food products warehouse, bakery, meat market,
food processing (includes the manufacture and/or handling ofany food product).
XIII. Egress Lighting
If there is a requirement to complete an egress lighting inspection, we offer this service after hours for those
customers interested in not having to 'black-out' the facility for inspection. Additional fees are required for after-
hours inspections.
Note:
Additional fees may be charged for phased construction, deferred submittals and project revisions.
I do hereby certify that all information hereon is true and accurate and that I am responsible for
submitting the applicable items to the appropriate departments.
Trevor T. Holcomb / Architect
(Design Professional, Builder or Propefi Owner)/ Print Nume/ Association t'ith Project
rCity of Springfield
Development Services DePartment
225 Fifth Street
Springfield , OR 97477
Planning Division Information Sheet for Building Permits
Commercial/Industria!/ Multi-Family Residential
The Planning Division requires the following information for all building permit submittals on
properties zoned Medium Density Residential, High Density Residential, Commercial, or Industrial,
including new construction, expansions, and changes of use.
New construction, expansions, and changes of use to any building, parking, or development area in
these zoning districts requires either Minimum Development Standards-MDS review (SDC 5.15-100)
or Site Plan Review (SDC 5.17-100) by the Planning Division. Overlay District Development review
(SDC 3.3-100) may also be required, depending on the site.
NOTE: It is prudent to make sure your use is permitted in the applicable zoning district. Building
Permit, Police or other permit approvals or inspections are not Planning approval.
SPR!NGFIELD
phone: 479.316.8109Applicant Name: Joyce Fletcher, Project Administrator
Fax: 479.316.8145Company: Trevor T. Holcomb Architect
Address: 211 N. Record Street, Suile222, Dallas, TX,75202
TAX LOT NO(S):ASSESSOR'S MAP NO: 1703254403600
Description of the proposed work to be completed under this building permit:
Tenant improvement for a Fed Ex Office going into an existing 421 sf tenant space in Walmart.
Address: 2659 Olympic Street
Has this development proposal been reviewed by the Planning Division
through an application process (i,e. lrlDS or Site Plan Review)?
If yes, Case #:
If no, is this a change in use? E Yes El no
Dves Exo
Prior APProved Use: Mercantile Proposed Use: Mercantile
TOTZ:Zonin Ove s
Does the use necessitate the use of any chemicals or substances that are hazardous or
Sheets NoMSDYesto be ke on site?anduire Material
The proposed project requires submittal and approval of the following Planning application
prior to building permit approval:
E oWp Overlay District Development
E tloS
E slte Plan Review
E Statement Letter Regarding DWP Exemption
E t{oS Land Use Compatibility Statement
n other:
Date:Reviewed by:
Required Project Information (Applica ntr complete this section )
Requi red Property Information (City Intakei Staffi complete this section)