HomeMy WebLinkAboutPermit Plumbing 1989-10-10t#.. RESIDE\lTlAL..
zzs North sth stv,eeaPPLrcArroff/P,RMrr
Sprtngfteld' 1r'egon 97477
Building Diuision
7 26-37 53
Job Iocaticn:
Aeaessore Map f
Subdivieion:
Asner:
Address:
SPrlINGFTELD
T-t Deect Lbe h'ot'k:
Net)Uywnk \o b\oPn^
-'
lddtticn
L
1e Date:
Value
LL726-3769 (recotder) state yout' City ted job nutnber,
for inspection,Contracto?s or atmers plane nwiber.
nade aftez, 7:00 an urill be nnde the nect :mtking dag.
Iout, City Desigr,ated Job Nunber fs:
Date of App Lice.tion
General
Plurnbin
SITE INSPE ,-!ION,A;aoatlo":6t ?o be nade afterpriar tc set up of
It ie the reeponsibility of tlc pe|nrit hotder to see that aLL inapee_tiotrs ote nade at the pvoper tine' that eceh addrees is t'eaCabie
fron the etnebt, anC that the penrtt oard ia- Loeated qt.try. frol! of the-P?ope"tA'-tsuildi,g D,iuis'ion appno'"-ed plan shc.Ll nemain on tlta Building Sitc at aLL times.
PROC\DUPE POR I.ISPEC,?fuII RIQUEST :CA'
@esiffiT.if,6i-irtT b e ready
tiLL be rmde thc sane dcy, requests )
Cesigrn
nctne end
job aCdtees, type
Requests receited
of inspeclictt
befcre 7:00 an
UNDERSLAB .'LUMBING. ELECIRICAL &
WCHA.\IICAL: ?o be made before anY
ffi7fii'lev,ed.
fonns
F)1TING & |')IINDATICN: lo be naCe
after tren,:hes are escaoa ted and.
fotms are ,,r,ected, but prior to
pouring catcreta.
UNDlRCROU!]i1
INSULATION/VAPOR BARRIER IIISPECTION:
To be nade aften aLL insulaticn atd
requiz,ed oapor bawiers @e in Pl.ace
but before any Lath, Wpsurn boarC ot'
unLL cooering is appli-ed, and before
oty insulation is concealed.
DRYWALL INSPE&I)N: Tc be nade;FaZfi@is in ptaee,
but prior to any taPirq.
MASINRI: Steel Location, bond
Gffijg"outing or oerticals in
accordorce vith U,B.C. Section
247 5.
': To
ttencites U
UNDERFLOOR PLUI,EING & MECIIANICAL:
@or to install.ation of
floor ineu'.ation ot' decking.
POST AND B\,-AM: To be made Priot to
iffiTi€l,n of floor insulation or
decking.
ROUCH PLA,!]IT\G. ELEC?RICAL & MECH;
ANICAL: Na oork is to be co.-ez'ed
GlTTth"s,. inspections haoe been
nade and. alptooed..
EI!.@LA!E: Pt iot' to placir.g facing
^ate"ial-; cnd before frotring inepec-
ti.on.
FRAI|ING: itust be lequested afte?
appz,ooal o.' rough plunbing' electri-
cal & necfutnical. ALI t'oofittg
btactttg E chinmegs, etc. rmtet be
. eonpteted, No wrk ia to be con-
. cealed unt^-L this inepectton las
'been nade ,tnC approoed.
WOODSTOVE:
arnpTi-tea.
Aften installation is
CURB & APPRCACH 4?391r: After forms
arc ete;tAE V;ffi to pouring
conerete.
SfDEILALN & DRIVEWAY: For aLL con-
;;"te paufrilfifr street right-
of-txA, to be nade after aLL eaca-
tating conplete & fonn wrk & sub-
base matenial in Place.
IENCE: I{hen conPlete -- ProttiCe'@ or mooable sectians through
P.U.E.
ALL project conditions, such as the installation of street trees, conpletion-of the
required. hnar,iipl."g, Ltu., mtst be satisfied befoie the BI)ILDING FINAL ean be requested'
?iltAL BUILDIN7: I,he Final Building fnspection mtet be requeated aftet the Pinal Plwnbing
\_/ Eleetrical, and Meclanical Inspeetions hqtte been nade ard approoed'
FIIIAL PLUI43ING
PIIIAL MECI!.INICAL
FINAL ELECIRICAL
Tat Iat #
Phone
ractorsn
l.lechanic
caec ErE
Elec E r: ic ia n,nSuperv
DEI.IOLI?ION OR BUILDI\ICS
Sotilaty aeuer capped et Woperty Lite
Septic tank punped ard fi.Lled with gra;sel
Pinal - l{hen abotte itens ave conpleted
and uhen Cenolition is conplete ot' struc-
ture moued and pt'ewises cleaneC up.
Hcnes
Bloeking and Set-up
Plttnbing connections -- aa)et d uatet
Electrical Connection - Bloekirtg' set-up
and plunbing connectiona rrust be apprc"^ed
before requeating eleclrical inepectiott
Accessory Building
Pinal - After pcrchea, skitting, decks,
etc. ave canpleted.
Page 1 of 2*AT,L, IIANHCLES AND CLEANOUTS MI]ST BE ACCESSIBLE, ADJUSTIIEN? TO BE I'IADE 1T IIO CSST TO CTYY
I
/
\b
tr
T
OLAR ACCESS REQ.-L-co c3
BedroomaGt:
Int Sq. ?tg.
% of Lot Cotsez,age
# of StorLes
?otal Eeight
Iopography
LOT ?YPE
_ fnteri.or
_ Cormer
_ Panhandle
CuL-de-aac
Lot Faces -
JOB NO.
P,L Ilouse Gan aqe
North
FireplaceEastl
Wood.stoxeSouthlllWeat
-- Feee --
This permLt is granted on the eEp"ees eondition tlat the said-constmtction
slall', in all iapects, conforn to the lriLLnance adopted by the Citg gf
Springfield, includi.ng the Zoning Ctdinance, r'egulatirzg the ccnstructicn
and use of buildings, and mag be euspend.ed or reuokeC at cnt time upon uic-
lation of dtA prcoisions of said ordinances.
1OTAL VALUE
FTG VaLue
A
I {
S.D.C. L.5 x
Euilding Permtt
?otal Clnrges
State Date Paid:
Receipt #
Building Volue & Permit
Plumbing Permit
No peteon alwll construet, inetal!., altet ot change cng neu cr etisting
plunbing on dlainage systen in uhole or in pant, unless sucl: person is the
Legal poseessot, of a oalid plwnber's License, ercept tlut a De?son nay do
plunbing uork to propertg uhich ie otmed, Leaaed or operatec by the appli-
eant.
NO,FEE CHARCE
C)
,(
Sani Seuer
Fi.rtures
Residential (1 bath)
Plumbing Pernit
Electricol Permit
l,lhet,e State Lan requiz,es th,at the electrical uork be done bg an Eleotrtcal
Contractot,, the electrical portion of thie permit shall not be oaliC until
the Label laa been signed by the Electrical Contractor,
State
Neu/Estend. Citcuits
Setuice
NC,FSE CI]ARCE
*
Mechqnicol Permit
bhanst llood
Ilcodstotle
Vent Fot
Mechanieel Perrnt
I HAW CAREFULLY EXAI'|INED the contpLeted appli-cation fot penrit, ard do
hereby cettify tlnt aLL infornation hereon ie true atd eorreet, amC f
furthet certify that any ard aLL uork pet,fonted ehall be done in aceor-
dance trith the ordinancee of the Ci.tg of Spningfield, atd. th: Lase of tha
State of )regon pertaining to the wtk Ceacribed herein' ana that N0 )CCU'
PANCY tvtll be nade of ang sttwetute uithout permission of the Building Di-
uision. f further certify that otly contracto?s o"d. anplogees uho are in
eazpliance Dith 2RS 701.055 utLL be uaed on thie project
Date
Mobile llone
TOTAL AMOUNT DUE:.JI
Permit
*rok;t
PLmt Exoniner
Curbcut
Sideualk
rTEM
l,later
7
)) C.LJ
t._l OO
State Surel".arge
?otal C'lnyqes
htnaco- P'fll'S
State Sutclunqa
Total Chdraa-d
PermLt fssucr,ce
b