Loading...
HomeMy WebLinkAboutPermit Mechanical 1992-10-14COM M ERCIAL/IN DUSTRIAL PERMIT APPLICATION 225 Fillh Street, Springf ield, Oregon 97477 SP;IIi.GFIELE,JOB NUMBER ?z/y'c/2 INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK h, irt lns /nne 3716 ' 4,. TAX LOT:Efe?ASSESSORS MAP: PHONE: CN &f ? t+r,tSTATE:ZIP 6 E \Xo1 3 -F L e tuOWNER: ADDRESS CITY: NEW - REMODEL ADDITION DEMOLISH OTHER VALUE (., @Oo,/ rDESCRIPTION OF WORK MECHANICAL: trt traTEllaat NAME ADDRESS PHONE EXPIRES PHONE 6s:scrg3rrGENERAL:ra4s &-tT fitu ADDRESSCONTRACTOR'S NAME PLUM BI NG CONST. CONTRACTOR # PLUMBING NO.FEE CHARGE Single Fixture Relocated Bld (new fix. addtl s ) Water Service ft. Sanitary Sewer ft. Storm Sewer ft Backflow Device TOTAL PERMIT MECHANICAL NO FFF EHA RG tr Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct5*t ?trt*o v,a,/p c Permit lssuance $10.00 TOTAL PERMIT _ OFFICE USE _ LAND USE: ZONING FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER OCCY GROUPT # OF STORIES QUAD AREA: r OF BLDGS: CONSTR. TYPEr HEAT SOURCE: SO. FT.$/SQ. FT.VALUE TOTAL VALUE OF PROJ X X SQ. FTG MAIN SQ. FTG ACCESS SQ, FTG OTHER RCPT#PLAN CHECK FEE DATE BY 2r?7 BUILDING PERMIT PLU M BI NG DEMOLITION 5% State Su rc haroe 5% State Su rc harqe ME1HAV6AVT?//*fr,*>zr 'l€2,FENCE VALUE $ 5% State Surcharge -?;SIDEWALK FT. SUBTOTAL PERMITS PAVING CURBCUT FT, SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL ARCHITECT * OF UNITS: HANDICAP ACCESS: REQUIRED INSPECTIONS .J It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726.3769 (recorder), state your City designated iob number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SpEC;AL TNSPECTTONS: tn accordance ELECTRICAL & and approved. Section 306 0f the state Specialty code MECHANICAL: To be made a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor duringCURTAIN WALLS construction of the following w6rk. A FOOTINGS & FOUNDATTONS: copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division. excavated and forms are facing materials and before erected, ail steel in place, but framing inspection' srRUcruRAL CoNCRETE: ln prior to placing concrete. FRAMTNG: To be made after excess of 250o PS.l. (306 a.1) coNcRETE SLAB: To be the roof' all framing' fire made arter ar insrab buirding 3l::5::.":fl |ffi:I?;,Hl:r" FII:,"J"'f3l Hf tT',rrr, ,, service equipment, conduit, and vents are complete and :#[3;'"",",];""{!? ?i:1""'5J *?'fl::lilig5X'JJ;[3:l: Bl?Xf],ffi]*'l*,1o,hlg:"0in place but before any tighteiing operations. (306concrete is placed. INSULATTON & VApOR a.6) BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are in place but FIREpROOFING: U.BC.storm sewer, water and before any lath or gypsum Standards 43-8.drainage lines. To be made board interior wall covering is P,tl:::,:-".*rins or fillins applied. SpEctAL GRADING, ,NDERFL..R: p,umbins [l::,S'i^: m'J3[H3"' El;lUt'iii#li:,5Jb'i],"i, electrical, mechanical. To be according to plans. chapter 29) made prior to installation of floor insulation, decking or LATH ANDToR GYPSUM GLU'LAM BEAMS: lnspection floor sheathing. BOARD: To be made after all Certif icate by an approved lathing and gypsum board, agency, furnished to the city's posr & BEAM: To be made interiol and exierior, is in Building Division before prior to installation of floor place but before any beams are placed' (250'1 U'B.C' insulation, decking or floor plastering is applied or before STDS' 25-10'11)' sheathing. Sypsum board joints and fasteners are taped and STRUCTURAL MASONRY: (306 FLooR INSULATIoN & finished' a'71 VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415. RooF sHEATHTNG AND iHffi^H?,tJ",::f""!|'" NAILING: Prior to installing erected but prior to placing any roof covering. concrete. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. *ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot stri pi ng, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS PLANS REVIEWED BY DATE By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during tructi on /O-rv-7LSignatu re Date VALIDATION RECEIPT *:648a DATE PAID: RECEIVED BY: AMOUNT RECEIVED: t Z,?T