HomeMy WebLinkAboutClassADisinfectionDesignContract_Jan2020Class A Disinfection Facilities, Engineering Services (P80098) Contract Award Todd Miller January 10, 2020 1 Engineering design services for: Class A recycled water disinfection and production facilities (“Class A Disinfection Facilities”) Optional integration of seismic resiliency upgrades to the high rate chlorine contact basin (HRCCB) Optional integration of re-sized pumps for the tertiary filter system Contract cost: Not-to-exceed $1,643,000 Amendment authority of up to 15% ($246,450) Total Resolution 20-01 authority: up to $1,889,450 Project P80098: Class A Disinfection Facilities Current budget: $2,300,000 Future budget for construction contract to be determined Resolution 20-01 2 Award of Contract to Kennedy Jenks Consultants Sole respondent to request for proposals (RFP) Class A treatment, storage, and conveyance design option defined Direct appoint new contract >$250,000 allowable with written findings that doing so is: Efficient Cost effective Does not diminish competition Contracting Authority Procurement Rules 3 Project Overview Three key elements: Class A disinfection after tertiary filters Recycled water storage tank (0.5+ million gallons) Pump station and connections to points of use Design Basis ? ? ? ? ? 4 Fatal Flaw Analysis: will it work? Alternatives Analysis: what is optimal? Pre-Design Process Disinfection Decision Storage Decision Pumping Decision 5 10% Conceptual Design Source: Jiangsu YLD Water Processing Equipment Co., Ltd. Source: Hazen & Sawyer; hazenandsawyer.com Source: Portalogic; portalogic.info New open channel UV disinfection Existing tertiary filters – optional pump resizing New on-site card-lock truck fill station UV disinfection 1 million gallon storage in HRCCB Pump station in HRCCB On-site fill station 6 Project Costs Design Cost Proposal: Class A Disinfection Facilities design and construction support: $1,357,500 Optional Design Tasks: $284,500 Filter improvements Seismic upgrades Permit assistance Condition assessment Inspection support Total: 1,643,000 Construction Cost Estimate (engineer’s opinion): Class A Disinfection Facilities: $4,990,000 Optional items: TBD 7 MWMC Budgets Temperature Compliance Projects $15,000,000 combined initial phases Not shown: $17,000,000+ in future recycled water expansion 8 Thermal Load Cost Elements Current break down of $15M Thermal Load Planning & Implementation I Includes all costs to date and break-off project budgets Potential future project costs: Recycled Water Conveyance Line Upgrade - $3.5M BRS Lagoon & Pivot Irrigation Rehab - $3.0M Pure Water Partners future phase - unknown 9 Project Timeline 10 Resolution 20-01 11 Conceptual Layout 12 Demonstration Sites 13