HomeMy WebLinkAboutPermit Building 2003-09-08Status Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676Fax
541-7 26-37 69 Inspection Line
Building/C ombination Permit
PERMIT NO: COM2003-00709ISSUED: 09/08/2003APPLIED: 08/0712003EXPIRES: 03/0812004VALUE: $ 41,000.00
SITE ADDRESS: 1655 32ND ST Springfield TYPE OF WORK: Site Work Only
ASSESSOR'S PARCEL NO.: 1702300001932
TYPE OF USE: Alteration Industrial
PROJECT DESCRIPTION: Construct depressed loading dock at west end of existing building.
Owner: THOMpSON HOWARD C S0%
Address: 1655 N 32ND ST SPRINGFIELD OR 97478
License Expiration Date
CONTRACTOR INFORMATION
Contractor Type
Applicant
General
Engineer
Contractor
SOFT TECH
SOFT TECH
BRANCH
SYSTEMS LLC
# of Stories:
Height of Structure
Type of Heat:
Water Type:
Range Type:
Energy Path:f
'1$
Overlay Dist:
# Street Trees Rqd:
Paved Drive Rqd:
%o ofLot Coverage:
(
Phone
541-726-3922
541 726-3922
54r-746-06371r)
eP
Sidewalk Type:
Downspouts/Drains:
ee},oo
Surface Area:
REQUIRED PARKING
Total:
Handicapped:
Compact:
# of Buildings:
Primary Occupancy Group:
Secondary Occupancy
Primary Construction
Secondary
# of Bedrooms:
Frontyard Setback:
Side 1 Setback:
Side 2 Setback:
Rearyard Setback:
Solar Setbacks:
Street Improvements:
Storm Sewer Available:
Special Instruction:
PUBLIC IMPROVEMENTS
Notes:
Page I of3
L]
Status Issued
225 Fifth Street, Springfield, OR
54l-726-3753 Phone
541-726-3676Fax
541-7 2637 69 Inspection Line
Building/Combination Permit
PERMIT NO: COM2003-00709ISSUED: 09/08/2003APPLIED: 08/0712003EXPIRES: 03/0812004YALUE: $ 41,000.00
Description
Bid Amount
Type of Construction
Use Bid Amount
$ Per Sq Ft Square Footage
or multiplier or Bid Amount
$1.00 41,000.00
Total Value of Project
Amount Paid Date Paid
Value
$41,000.00
$41,000.00
Date Calculated
08t07t2003
Fee Description
Plan Review Comm/Ind/?ublic
+ l0o/o Administrative Fee
+ 7oh State Surcharge
Building Permit
Fixture
Storm Sewer - lst 50 Feet
Storm Sewer Each Addtl l00f
Total Amount Paid
$206.70
$39.10
$27.37
$318.00
$14.00
$4s.00
$14.00
$664.17
8t7t03
9t8t03
9/8/03
9t8t03
9t8t03
9t8t03
9t8t03
Receipt Number
22002000000000013ss
2200200000000001484
2200200000000001484
2200200000000001484
2200200000000001484
2200200000000001484
2200200000000001484
Fees Paid
Plan Reviews
Fire Department Review 08/08/2003 09t02t2003 APP GRG Plan Review: construct depressed
loading dock for existing Soft Tech
building. Plans appear to meet code
requirements.
OK'd by Ashley Deforest. Re-doing
existing loading dock. Shown on
.
previous site plan. Engineering was
advised of requirements for Land
Drainage and Alteration Permit.
8/18/03 - Assigned to Eric Walter to
review. KJV
Initial Review
Planning Review
Public Works Review
Public Works Review
Structural Review
SUB Review
08/08/2003
08/08/2003
08/08/2003
08/r8/2003
08/08/2003
08/08/2003
08/08/2003
08n4t2003
08/19/2003
08n9t2003
08/18/2003
08/08/2003
LLH
EMM
EW
EW
TCM
APP
APP
APP
APP
APP
APP DH
To Request an inspection call the24 hour recording at 726-3769, All inspection requested before 7:00 a.m.
will be made the same working day, inspections requested after 7:00 a.m. will be made the following work
day.
I Footing; After trenches are excavated.
2 Foundation: After forms are erected but prior to concrete placement.
Paee 2 of3
Renrrired Insnecfions
:
Valuation Description I
Building/Combination Permit
Status Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676Fax
541-7 26-37 69 Inspection Line
PERMIT NO: COM2003-00709ISSUED: 09/08/2003APPLIED: 08/0712003
EXPIRES: 03/0812004VALUE: $ 41,000.00
3 Final Building: After all required inspections have been requested and approved and the building is complete.
4 Storm Sewer Line: Prior to filling trench.
5 Final Paving: After paving is complete.
6 Rough Grading: After gravel is in place but prior to placing concrete.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all
information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with
the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and
that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety.
I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction.
Atrtub,il,,*€o3
0wner or Contractors Signature Date
Pase 3 of3
r L
225 Fifth Street
Springfield, Oregon 97 477
541-726-3759 Phone
City of Springfield Oflicial Receipt
Development Services Department
Public Works Department
coM2003-00709
coM2003-00709
coM2003-00709
coM2003-00709
coM2003-00709
coM2003-00709
Building Permit
Fixture
Storm Sewer - lst 50 Feet
Storm Sewer Each Addtl 100'
+ lYo State Surcharge
+ l0%o Administrative Fee
318.00
14.00
45.00
14.00
27.37
39. l0
Item Total $457.47
Type of Payment Paid By Received By Batch Number Authorization Number How Received Amount Paid
Check CURT MARKUS jmp 5096 In Person
Payment Total:
s4s7.47
$4s7.47
6FBlltaGFlFLS
(
J a (t, Psar*at
CITYO}
ATTACHMENTA ,-
JNGFIELD SYSTEMS DEVELOPMENT CHARGE }.SHEET
JOURNAL OR JOB NUMBER COM2OO3.OO7O9
NAME OR COMPANY:Soft Tech Systerns
LOCATION:1655 32nd Street
MAP&TAXLOTNUMBER: t7 023000 01932
DEVELOPMENT TYPE General Industrial
0
0
NEW DEVELOPED AREA (S.F.):
EXTSTTNG DEVELOPED AREA (S.F.):
TOTAL TMPERVTOUS ST.IRFACE (S.F.):
1. STORM DRAINAGE
TMPERVTOUS SQ. F-r,
2. SANITARY SEWER-CITY
A. REIMBURSEMENT COST:
NUMBEROF DFU'S
B. IMPROVEMENTCOST:
NUMBEROF DFU's
(SEE REVERSE SIDE)
x
x
5. ADMINISTRATIVE FEES:
BASE CHARGE (SUBTOTAL ABO\E)
erlc A. WaLler
rffiG&QCIBCIR0ttrQh.xts
1,800.00
1,800.00
X $ 0.290 PER SF
120
LOT SZE (S.F.):
TOTAL STORM DRAINAGE SDC
NTF $46.52
NTF $ 205.23
NTF $ (46.52)
ITE:
ITE:
x $ 22.64 PER DFU
x $ 17.21 PER DFU
TOTAL LOCAL WASTEWATER SDC:
3. TRANSPORTATION
BLDG AREA TGSF x TRIP RATE x COST PER ADT x NEW TRIP FACTOR
NEW
A. REIMBURSEMENTCOST:
1.80 x 1.5 x $ 17.23 PER TRIP x
B. IMPROVEMENTCOST:
1.80 x 1.5 x $ 76.01 PER TRIP x
EXISTING
A. REIMBURSEMENTCOST:
-1.80 x 1.5
B. IMPROVEMENTCOST:
-1.80 x 1.5
$ 17.23 PER TRIP
$ 76.01 PER TzuP
x
xINTF
$9s. l0 PER FEU
PER FEU,95
$9s. r0 PER FEU
PER FEU
$ (205.23)
$ 171.18
$17.91
$ (171 .18)
$ (17.91)
TOTAL TRANSPORTATION REIMBURSEMENT
TOTAL TRANSPORTATION IMPROVEMENT
TOTAL TRANSPORTATION
4. SANITARY SEWER. MWi{C
NEW:
A. REIMBURSEMENTCOST;
NUMBER OF FEU's 1.80
B. IMPROVEMENT COST:
NUMBER OF FEU's 1.80
EXISTNG:
A. REIMBURSEMENT COST:
NUMBER OF FEU's -1.80
B, IMPROVEMENTCOST:
NUMBER OF FEU's -1.80
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
95
TOTAL MWMC REIMBURSE\'{ENT FEE
TOTAL MWMC IMPRO\E\IENT FEE
MWMC ADMINISTRATIVE FEE
TOTAL N{WN{C SDC:$
SUBToTAL (ADD ITEMS 1,2,3, & 4)$
5Yo
TOTAL TRANSPORTATION ADMINISTR.ATION FEE:
TOTAL SEWER ADMINISTRATION FEE:
8119t2003
x
x $9
x
x $9
$
NONE
$
$
$
$
$
$
$
$ru /:
DATE
TOTAL SDC CHARGES
JULY 2OO1
x :$