Loading...
HomeMy WebLinkAboutPermit Mechanical 1993-01-05COM M ERCIAL/ I N DUSTRlAL PERMIT APPLICATION 225 Fiflh Street, Springfield, Oregon 97471 LOCATION OF PROPO WO ASSESSORS MAP: SPFINGFIELO ,h, JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 $ TAX LOT: STATE: OWNER ADDR CITY: PHONE ZIP: NAME ADDRESS EXPIRES PHONE PHONE VALUE CONTRACTOR'S NAME ARCHITECT: DESCRIPTION OF WORK: ADDRESS ELECTRICAL: MECHANICA CONST. CONTRACTOR # G EN ERAL: PLUM BI NG NEW- REMODEL ADDITION DEMOLISH OTHER TVIECHANI CAL NO FEE CHA FIGF Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cool er Vent Fan/Single duct Vent System apart from AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT Backflow Device TOTAL PERMIT IL San I ft. orm I ft. fix. ad Single Fixture Relocated Bl er ce _ OFFICE USE - LAND USE: ZONING* OF UNITS: HANDICAP ACCESS: FLOOD PLAIN LIGHTING POWEB BUDGET: WATEH HEATER OCCY GROUP: * OF STORIEST QUAD AREA: * OF BLDGS: CONSTR. TYPEr HEAT SOURCE: SO. FT.$/SQ. FT.VALUE TOTAL VALUE OF PROJECT X X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER RCPT#PLAN CHECK FE^E DATE BY BUILDING PERMIT PLUMBING DEMOLITION 5% State Surcharoe 5% State Su rc haroe MECHANICAL \Src FENCE VALUE $ 5% State Surcharoe ,l>SIDEWALK FT. SUBTOTAL PE RM ITS"tlK'b/](O q)CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL I REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-g169 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:OO a.m. will be made the following work daY. SITE INSPECTION: To be made after excavation, but prior to setuP of forms UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in Place, but prior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before anY concrete is placed UNDERG D: Plumbing, sanitary sewer,electri storm water and drainage lines. To be made prior to covering or f illing t renc hes. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or f loor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or f loor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to Placing facing materials and before framing inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and INSULATION & VAPOR BARRIER: To be made after all insulation and required vaPor barriers are in place but before any Iath or gYPSUm board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and f inished. SIOEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. the rough electrical, plumbing and mechanical are approved. PAVING: After gravel is in place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be f urnished to the Building Division. STRUCTURAL CONCRETE: IN excess of 2500 P.S.l. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 t) HIGH STRENGTH BOLTING: During all bolt installation and ti ghteni ng operations. (306 a.6) SPRAYED ON FIREPROOFING: U.B.C. Standards 43'8. SPECIAL GRADING, EXCAVATION AN D FILLING: During earthwork. (306 a.11 & Chapter 29) GLU-LAM BEAMS: lnspection Certif icate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. sTDS. 25-10J1). STRUCTURAL MASONRY: (306 a.7\ .ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. AII project conditions such as Iandscaping, parking Iot stri ping, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in complianc? twth ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the at the front of the property, and the approved set of plans will remain on the site at all sig Date that the pe it card is located m ction.ring co S ti DATE PAID: RECEIVED toN:AMOUNT RECEIVED: RECEIPT *: