HomeMy WebLinkAboutPermit Mechanical 1993-01-05COM M ERCIAL/ I N DUSTRlAL
PERMIT APPLICATION
225 Fiflh Street, Springfield, Oregon 97471
LOCATION OF PROPO WO
ASSESSORS MAP:
SPFINGFIELO
,h,
JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
$
TAX LOT:
STATE:
OWNER
ADDR
CITY:
PHONE
ZIP:
NAME
ADDRESS EXPIRES PHONE
PHONE
VALUE
CONTRACTOR'S NAME
ARCHITECT:
DESCRIPTION OF WORK:
ADDRESS
ELECTRICAL:
MECHANICA
CONST.
CONTRACTOR #
G EN ERAL:
PLUM BI NG
NEW- REMODEL ADDITION DEMOLISH OTHER
TVIECHANI CAL
NO FEE CHA FIGF
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cool er
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
Backflow Device
TOTAL PERMIT
IL
San I
ft.
orm I
ft.
fix. ad
Single Fixture
Relocated Bl
er ce
_ OFFICE USE -
LAND USE:
ZONING* OF UNITS:
HANDICAP ACCESS:
FLOOD PLAIN
LIGHTING POWEB BUDGET:
WATEH HEATER
OCCY GROUP:
* OF STORIEST
QUAD AREA:
* OF BLDGS:
CONSTR. TYPEr
HEAT SOURCE:
SO. FT.$/SQ. FT.VALUE
TOTAL VALUE OF PROJECT
X
X
SQ. FTG MAIN
SQ. FTG ACCESS
SQ. FTG OTHER
RCPT#PLAN CHECK FE^E DATE BY
BUILDING PERMIT PLUMBING DEMOLITION
5% State
Surcharoe
5% State
Su rc haroe
MECHANICAL \Src FENCE
VALUE $
5% State
Surcharoe
,l>SIDEWALK
FT.
SUBTOTAL
PE RM ITS"tlK'b/](O q)CURBCUT
FT.
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
I
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726-g169 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:OO a.m. will be made
the following work daY.
SITE INSPECTION: To be
made after excavation, but
prior to setuP of forms
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in Place, but
prior to placing concrete.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before anY
concrete is placed
UNDERG D: Plumbing,
sanitary sewer,electri
storm water and
drainage lines. To be made
prior to covering or f illing
t renc hes.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
f loor sheathing.
POST & BEAM: To be made
prior to installation of floor
insulation, decking or f loor
sheathing.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
uBc 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to Placing
facing materials and before
framing inspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vaPor
barriers are in place but
before any Iath or gYPSUm
board interior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
f inished.
SIOEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
the rough electrical, plumbing
and mechanical are approved.
PAVING: After gravel is in
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be f urnished to the Building Division.
STRUCTURAL CONCRETE: IN
excess of 2500 P.S.l. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2722 t)
HIGH STRENGTH BOLTING:
During all bolt installation and
ti ghteni ng operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43'8.
SPECIAL GRADING,
EXCAVATION AN D FILLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU-LAM BEAMS: lnspection
Certif icate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
sTDS. 25-10J1).
STRUCTURAL MASONRY: (306
a.7\
.ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. AII project conditions such as
Iandscaping, parking Iot stri ping, etc. must be completed before
requesting this inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
ADDITIONAL COMMENTS:
PLANS REVIEWED BY DATE
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in complianc? twth ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
at the front of the property, and the approved set of plans will remain on the site at all
sig Date
that the pe it card is located
m ction.ring co
S
ti
DATE PAID:
RECEIVED
toN:AMOUNT RECEIVED:
RECEIPT *: