Loading...
HomeMy WebLinkAboutPermit Building 2020-09-18COM M ERCIAL/ I N DUSTRIAL PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WORK: SPFlIr.GFIELO JOB NUMBE n 4? l3o] INSPECTION LINE: 726-3769 OFFICE: 726-3759 TAX LOT:O?J ooASSESSORS MAP:l-l oa a:l /o \Y\O PHONE ae ZIP: 3qs - qq LqOWNER: ADDRESS: CITY: Qz .,,.nnl C^ l1o o!, NEW - REMODEL ADDITION DEMOLISH 6 OT HER VALUE: l/, igs" DESCRIPTION OF WORK: NAME ADDRESS PHONE ADD RESS E 5 3+s-8)7 CONTRACTOR'S NAME MECHANICAL: ELECTRICAL: EXPIRES PLUMBING: G ENERAL: CONST. CONTRACTOR # PLUMBING NO.FEE CHARG E Single Fixture Relocated Bl (new fix. add dg. t t) Water Service ft Sanitary Sewer ft Storm Sewer ft Backf low Device TOTAL PERMIT MECHANICAL NO trFtr EHA RGtr Furnace/burner & vent <100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT _ OFFICE USE _ ZONING LAND USE HANDICAP ACCESS: FLOOD PLAIN: LIGHTING POWEB BUDGET: WATER HEATER: * OF UNITS: OCCY GROUP: * OF STOFIIES: QUAD AREA: * OF BLDGS: CONSTR. TYPE: HEAT SOURCE: SQ. FT.$/SQ. FT.VALUE TOTAL VALUE OF PROJ I I 85 X X X ,ll SO. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER RCPT#PLAN CHECK FEE DATE BY u q-l .t3 BUILDING PERMIT Qa \a PLUMBING DEMOLITION 5% State Su rcharqe Ll ur 5% State Surcharoe MECHANICAL FENCE VALUE $ 5% State Surcharqe SIDEWALK FT. SUBTOTAL PE RM ITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL S<a A,t- olr,, ALo ARCHITECT: - REOUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:OO a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SpECIAL INSpECTIONS: ln accordance ELECTRICAL & and approved. Section 306 0f the State Specialty Code MECHANICAL: To be made a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor duringCURTAIN WALLS construction of the following w6rk. A FOOTTNGS & FOUNDATTONS: copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division. excavated and forms are facing materials and before erected, ail steet in ptace, but framing inspection' srRUcruRAL CoNCRETE: ln prior to placing concrete. FRAMING: To be made after excess of 2500 P.S.l. (306 a.1) coNcRETE SLAB: To be the roof' all framing' fire made arter a, insrab buirdins Biff5::.'1ff |ffi:It";;l:r" E]I3,T.'X3".,Y5tT',rrr, ,service equipment, conduit, and vents are complete andpiping, accessories and other incir-ary equipment items are :i?H::[j]i""ji:,1'jJ;[l:i: 3l?Xf],?E]-"1*g,t*1]:".in place but before any tighteiing operations. (306concrete is placed. tNSULATtoN & vApoR a.6) BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are in place but FIREpROOFING: U.B.C.storm sewer, water and before any lath or gypsum Standards 43_8.drainage lines. To be made board interior wall covering is l;::;:":"*rins or fillins apptied. spEctAL GRADTNG, ,NDERFL..R: p,umbins II?:,S';?"*'J3[H]"' EfiiJt'iiil-tli:,5Jb'l],"1 electrical, mechanical. To be according to plans. chapter 29) made prior to installation of ftoor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection floor sheathing. BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency, furnished to the city'S posr & BEAM: To be made interior and exierior, is in Building Division before prior to installation of floor place but before any beams are placed' (2501 U'B.C' insulation, decking or ftoor plastering is applied or before STDS' 25'10J1)' sheathing. " Sypsum board joints and fasteners are taped and STRUCTURAL MASONRY: (306 FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. f inished SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. "ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. a.7) o t FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested after the final plumbing, etectricat, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Divisionand posted on premises FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCynofthe Building safety Division. I further certify that only contractors and employees used on this project. I f urther agree to ensure t lre ired i tions are requested at the propertime, that project address is readable from the street, that the permit loc d front of the property, and the approved set of plans will remain on the site at all times during const f z-' will be made of any structure without permissio who are in compliance with ORS 701.055 will Si Date VALIDATION AMOUNT RECEIVED: RECEIPT g: DATE PAID RECEIVED BY: Ql.t z 7 -tt qz