HomeMy WebLinkAboutPermit Building 1994-10-27COM M ERCIAL/ I N DUSTRIAL
PERMIT APPLICATION
225 Fifth Street, Springfield, Oregon 97477
SPRINGFIEL(,
JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
24/
LOCATION OF PROPOSED WORK 5q
\1 0q 21 I o r\85'c)()*ASSESSOHS MAP:TAX LOT:
6@ ZI P, q-1 +1?
ADDRESS
OWNER:
AL
VALUE
I Io L rv\+h ea lJ^DESCRIPTION OF WORK:
NEW
-
HEMODEL ADDITION DEMOLISH OTHER
NAME ADDRESS PHONE
ADDRESS EXPI RES PHONE
D \^5,n"€- F*
N-A
N-t\
N-A
G ENERAL:
PLUMBING:
MECHANICAL:
ELECTRICAL:
CONTRACTOR'S NAME
ARCHITECT:
CONST.
CONTRACTOR #
PLUMBING
NO.FEE CHARGE
Single Fixture
Relocated Bldg.
(new flx. addtl)
Water Service
ft
Sanitary Sewer
ft
Storm Sewer \ft
Backf lcur Device
TOTAL PERMIT
MECHANICAL
NO trtrtr CHA RGF
Furnace/burner & vent
<100,000 ETUs
Furnace/burner & vent
>100,000 BTUs
\oor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Staticnary evap.
cooler
-VenT FdnTSinsi
duct
Vent sys
AC
tem apart
or htg.from
Mechanical exhaust
hood and duct
Permit lssuance s10.00
TOTAL PERMIT
I
/r ","
SQ. FT.
s??7j
/ frta ZONING 1/rr' /
TOTAL VALUE OF PROJ
o 4b
X
LAND USE:
HANDICAP ACCESS
FLOOD PLAIN
LIGHTING POWER BUDGET:
* OF UNITS:
$/SQ. FT.
WATER HEATER:
VALUE
SQ. FTG MAIN
SQ. FTG ACCESS
SQ. FTG OTHER
- OFFICE USE-
?
OCCY GROUP:
* OF STORIES:
QUAD AREA:
* OF BLDGS:
CONSTR. TYPE:
HEAT SOURCE:
RcPrd /{/n carc €-7^?/PLAN CHECK FEE BY
a
DEMOLITION
%
FT.e
FT.4,PM NT
5%ate
Surch e
HANI
BUILDING PERMIT
SIDEWALK
CURBCUT
PLUMBI NG
SU
PERMITS
SYSTEMS
Surch
PAVI
5% State
FENCE
Surch
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
I
crrv: < PFtnr 6'F t € l.."$ STATE:
crArKf- rrlorape$PHONE: er$$#'-S 4tO
4q1 *r[e.u,t-sv .f
AN
AL.7r-N
4za /q..-b
,O - REQUIRED INSPECTIONS
It is the responslbility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726-9169 (recorder), state your City designated job number, job address, type of inspection requested and when you will be reapY
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be m(de
the following work daY. \
S|TE |NSPECT|ON: To be ROUGH PLUMBING, PAVING: After gravel is in
made after excavation, but ELECTRICAL & ' place but prior to placing
prior to setup of forms. MECHANICAL: No work is to asphalt or concrete.
be covered until these
UNDERSLAB pLUMBING, inspections have been made SPECIAL INSPECTIONS: ln accordance
ELECTRICAL & and approved. Section 306 of the State Specialty Code
,Y-
--r
MECHANICAL: To be made
before any work is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
UNDERGROUND: PIumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or f illing
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulatlon, decking or
floor sheathing.
POST & BEAM: To be made
prior to installation of floor
insulation, decking or floor
sheathing.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
uBc 2415.
ROOF SHEATHING ANO
NAILING: Prior to installing
any roof covering.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
FRAMING: To be made after
the roof, all framlng, fire
blocking and bracing are in
place and all plpes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering ls
applied.
8..,?iHea sEPARATToN wALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interlor and exterlor, is in
place but before any
plastering is applied or before
gypsum board Joints and
fasteners are taped and
f inished.
SIOEWALK & DRIVEWAY:
Reqr:i''ed for ail concrete
paving within street right of
way, to be made after all
excavatring complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the speclal testing reports shall
be f urnished to the Building Division.
STRUCTURAL CONCRETE: In
excess of 2500 P.S.l. (306 al)
STRUCTURAL WELDS:
Performed on the job. (2722 l')
HIGH STRENGTH BOLTING:
During all bolt installation and
ti ghtening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.BC.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU.LAM BEAMS: lnspection
Certificate by an approved
agency, furnlshed to the Clty's
Building Division before
beams are placed. (2501 U.BC.
STDS. 2s-10,11).
STRUCTU RAL MASONRY: (306
a.7)
"ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
--
By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information
hereln is true and correct, and I further certify that any and all work performed shall be done in accordance wlth the Ordinances
of the City of Springf ield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
wlll be made of any structure without permission of the Building Safety Divlsion. I further certify that only contractors and employees
who are in compliance with OBS 701.055 will be used on this project.
I further agree to ensure that all required inspections are reguested at the proper time, that project address is readable from the
at the front of the property, and the approved set of plans will remain on the site at all
Signature
-r--
c
Date Lo-n-n+
street, that the permit card is
times durlng constructlon.
.zzVALIDATIONAMOUNT RECEIVED
RECEIPT *:RECEIVED BY:
DATE PAID:
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this inspection.x-FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
ADDITIONAL COMMENTS:e 20
PLANS REVIEWED BY oate ? ^1a3^9t 7
.I ATTACHHENT 81
JDg No. 7z nc
CITY OF SPRINGFIELD SYSTEMS DEVELOPMEh, C!.IARGE
WORKSHEET
(COHHERCIAL & RESIDENTIAL)
NME OR COI'IPA}.IY:
LOCATION:7
DEVELOPMENT TYPE:
1. STORM DRATNAGF
IHPERVIOIJS SQ. FT.X $0.209 PER SQ. FT.
'o
Z4o4 />4
-7-
2. to*troov srwER-cITY
NO. OF PFU'S
(See Reverse)
5. ANHTNISTATIVF FFFS
CI{ARGE (
nig. P
SDC
X 543.26 PER PFU s ,)/
3. TRANSPORTATTON
NO OF UNITS X TRIP RATE X COST PER TRIP
x
-
x s436.19
x
-
x $436.19
s
s
x
-
x s436.19 S
SUBT0TAL (ADD iTEMS i,2, & 3) s -G-z<t6--rolc
4. SANITARY SFt^rFR-MI^IHC
N0. 0F PFU'S x $i7.19 PER PFU + $iC MhrMC ADMIN.FEE
(Use PFU Total From Item 2 Above)
H|.IMC CREDIT iF APPLICABLE (SEE REVERSE)
' T0TAI -f'll'll'lc SDC
SUBTOTAL (ADD ITEHS 1.2.3 & 4)
StT
-//S 42-fr fa./ 6
ABOVE) X .05
7-zz-z 7
s2.67_:=-
s0,/6
.2..s /
82. SDC
i nator
Date:
TOTAI SNC
/o -27-?y'
BUILDING SIZE: /a'tJo' | 0T SIZE' SQ. Ft.
S "Z