HomeMy WebLinkAboutPermit Building 1996-06-13COMM ERCIAL/IN DUSTRIAL
PERMIT APPLICATION
225 Fifth Street, Springfield, Oreg on 97477
LOCATION OF PROPOSED
SPRINGFIELO
K:
JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
TAX LOT:ASSESSORS MAP:D
OWNE
CITY:
ADD
PHONE:
STAT ZIP:
VALUE:DEMOLISH OTHER
DESCBIPTION OF WOR
NEW
--
REMODEL ADDITI
NAME ADDRESS PHONE
NAME BESS PHO.qry"CO R#
ELECTRICAL:
CONST.
ARCHITECT:
MECHANICAL
CONT
GENERAL:
PLUMBING
NO.FEE CHARG E
Single Fixture
Relocated Bldg
(new fix. addil)
r ce
ft
Sanitary Sewer
ft
Storm Sewer
ft.
Backf low Device
TOTAL PERMIT
NO FFF CHA RG FFurnace/burner & vent
<1 S
rnace/burner & vent
BTUS
Fu
>1
oorpenwall or
mounted unit heater
ntpance
separate
Stationary evap.
cooler
duct
e
Vent
f rom
Systern apart
AC or htg.
St
hood and duct
'-'Permil lssuance s 10.00
TOTAL PERMIT
ZONING:
LIGHTING POWER BUDGET:
WATER HEATER:
- OFFICE USE -HANDICAP ACCESS
FLOOD PLAIN
Y OF UNITS:
OCCY GROUP:
g OF STORIES:
QUAD AREA:
I OF BLDGS:
CONSTR. TYPE:
HEAT SOURCE:
SQ. FT.$/SQ. FT,VALUE
odTOTAL VALUE OF PROJ
X
X
X
SQ. FTG MAIN
SQ, FTG ACCESS
SQ. FTG OTHER
PLAN CHECK FEE RCPT#BY
BUILDING PERMIT J/D.-n PLUMBING DEMOLITION
5% State
Surcharge 5% State
Su
MECHANICAL ?.2 D FE E
$5% State
Su rc harq e
SIDEWALK
FT,
SUBTOTAL
PERM ITSPAVI NG CURBCUT
FT.SYSTEMS
DEVELOPMENT
TOTAL PEBMIT FEES
EXCLUDING ELECTRICAL
Floor furnace and vent
LAND USE:
DATE
< REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspectlons are made at the proper time. To request an inspection, call
226.g76g(recorder), state your City designated job number, iob address, type of inspection requested and when you will be ready
for inspection. Requests ieceived before 7:00 a.m. will be made the same working day, requests made after 7:00 a'm' will be made
the following work daY.
SITE INSPECTION: To be
made after excavation, but
prior to setuP of forms.
UNDERSLAB PLUMBING'
ELECTRICAL &
MECHANICAL: To be made
before anY work is covered.
FOOTINGS & FOUN DATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in Place, but
prior to placing concrete.
CONCRETE SLAB: To be
made after all inslab building
service equiPment, conduit,
piping, accessories and other
ancillarY equiPment items are
ln place but before anY
concrete is placed.
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made Prior to installation of
floor insulation, decking or
floor sheathing.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to Placing
facing materials and before
framing inspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all piPes, chimneys
and vents are complete and
the rough electrical, Plumbing
and mechanical are aPProved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vaPor
barriers are in Place but
before any lath or gYPSum
board interior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to Plans'
LATH AND/OR GYPSUM
. BOARD: To be made after all
.' lathing and gYPsum board,
interior and exterior, is in
place but before anY
plastering ls aPPlied or before
gYPSUm board joints and
fasteners are taped and
f inished.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavatlng comPlete and form
work and sub'base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but Prior to Placing
concrete.
PAVING: After gravel is in
place but Prior to Placing
asphalt or concrete.
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor duri ng
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETE: IN
excess of 2500 PS.l. (306 a,l)
STRUCTURAL WELDS:
Performed on the iob. (2722 f)
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.BC.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AN D FILLING:
During earthwork. (306 a.'1'1 &
Chapter 29)
GLU.LAM BEAMS: lnsPection
Certificate bY an aPProved
agency, furnished to the CitY's
Building Division before
beams are Placed. (2501 U.BC.
sTDS. 25-10,11).
STRUCTURAL MASONRY: (306
a.7)
POST & BEAM: To be made
prior to installatlon of floor
insulation, decking or f loor
sheathlng.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prlor to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams groutlng or
verticals in accordance with
uBc 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof coveri ng.
By signature, r state and agree, that l have carefulry examined the completed application and do hereby certify that all information
herein is true and correct, and I further certify tnat any and all work performed shall be done in accordance with the ordinances
of the city of springf ierd, and the Laws of the State of oregon pertaining to the work described herein, and that No occuPANCY
will be made of any structure without permission of the Buil-dlng safety Division. I further certify that only contractors and employees
who are in compliance with oRS 701.055 will be used on this prolect'
I further agree to ensure that all requlred inspections are requested at the proper time, that proiect address is readable from the
street, that the permlt card is located at the front of the property, and the approved set of plans will remai n on the site at all
ng constructlontimes
Date
Signatu
VALIDATION:
RECEIVED BY:
DATE PAIDAMOUNT RECEIVE
RECEIPT #
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPA ENT
ADDITIONAL COMM
SITEPLANREVIEWBoARD:Mustberequested2daysinadvance
ofthedateyouwishinspection.AllprolectconditionSsUchaS
landscaping,parklnglotstriping,etc.mustbecompletedbefore
requesting thls insPection.
FINAL BUILDING: Req uested after the final plumbing, electrical,
mechanical and Fire DePart ment inspections are made and
approved. No occuPancY of the premises can be made until a
Certificate of OccuPancy has been issued bY the Building Divis ron
posted on the MISES.
PLANS REVIEWED BY DATE
-ln addition to the inspec'
tions specified, the Building
Off icial may make or require
other inspections of anY
construction work to ensure
compliance with the Building,