Loading...
HomeMy WebLinkAboutPermit Building 1992-09-13COMM ERCIAL/ I N DUSTRIAL PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 SPRI^lGFIELO JOB NUMBER q) I 3o3 INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PBOPOSED WORK: ,h, !80 )6 TAX LOTASSESSORS MAP: 3qs -qq bqPHONE: ZIP:o{41c+0l OWNER: ADDRESS: CITY: NEW - REMODEL ADDITION DEMOLISH 12,90VALUER DESCRIPTION OF WORK: MECHANICALi ELECTRICAL: NAME ADDRESS PHONE ADDRESS EXPIRES PHONE a 5 lvs -8)-n CONTRACTOR'S NAME ARCHITECT PLUM B I NG: G EN ERAL: CONST. CONTRACTOR # PLUMBING NO.FEE CHARGE Single Fixture Relocated Bldg. (new fix. addtl) Water Service ft. Sanitary Sewer ft. Storm Sewer ft. Backflow Device TOTAL PERMIT MECHANICAL NO trFF CHA RGF Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent from System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT LAND USE: ZONING FLOOD PLAIN LIGHTING POWER BUDGET:OCCY GROUP: * OF STORIES: QUAD AREA: r OF BLDGS: CONSTR. TYPE: HEAT SOURCE: HANDICAP ACCESS:- WATER HEATER: SQ. FT.$/SQ. FT.VALUE ie3qoI TOTAL VALUE OF PROJ X X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER PLAN CHECK FEE RCPT#DATE BY s lD3 ry3 BUILDING PERMIT q? so PLU M BI NG DEMOLITION 5% State Surcharge qp.3 5% State Surcharge MECHANICAL FENCE VALUE $ 5% State Surcharoe SIDEWALK FT. SUBTOTAL PERMITSPAVINGCURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERIVIT FEES EXCLUDING ELECTRICAL O? oon _ OFFICE USE _ * OF UNITS: J REOUIRED INSPECTIONS E It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. FOOTINGS & FOUN DATIONS: To be made after trenches are excavated and forms are erected, all steel in Place, but prior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equi pment, conduit, piping, accessories and other ancillary equipment items are in place but before anY concrete is Placed. UNDERGROUND: PIumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made Prior to installation of f loor insulation, decking or floor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made Prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all piPes, chimneYs and vents are complete and the rough electrical, Plumbing and mechanical are aPProved. INSULATION & VAPOR BARRIER: To be made after all insulation and required vaPor barriers are in place but before any lath or gYPSum board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before anY plastering ls aPPlied or before gypsum board joints and fasteners are taPed and f inished. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of PAVING: After gravel is in place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reportg shall be furnished to the Building Division. STRUCTURAL CONCRETE: In excess of 2500 P.S.l. (306 a.1) STRUCTURAL WELDS: Performed on the iob. (2722 t\ HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.BC. Standards 43-8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) GLU.LAM BEAMS: lnspection Certif icate by an approved agency, furnished to the CitY's Building Division before beams are placed. (2501 U.B.C. STDS. 25-10,11). STRUCTURAL MASONRY: (306 a.7)a.of,-- ROOF SHEATHING AND NAILING: Prior to installing any roof covering. way, to be made after all excavating complete and form work and sub-base material in APRONS: After forms are erected but prior to Placing concrete. 6 .ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. verticals in accordance with place. uBc 2415. CURB AND APPROACH By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information herein is true and correct,-and I further certify that any and all work performed shall be done in accordance with the ordinances of the City of Springf ield, and the Laws of the State of Oregon pertaining to the work described herein, and that No oCCUPANCY will be made of any struciure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with oRS 701.055 will be used on this project. inspections are requested at the propertime, that project address is readable from the the front of the property, and the approved set of plans will remain on the site at all vr'*?-=--Signat Date I f urther agree to e street, that the times during I requi at [03 ,la VALIDATION l.LLA L tt- AMOUNT RECEIVED: RECEIPT *: -1F-DATE PAID: RECEIVED FINAL PLUMBING FINAL ELECTR]CAL FINAL MECHANICAL FINAL FIRE OEPARTMENT ADDITIONAL COMMENTS SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot stri ping, etc. must be completed before requesting this insPection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a certificate of occupancy has been issued by the Building Division and posted on the P ISES PLANS REVIEWED BY DATE