HomeMy WebLinkAboutPermit Mechanical 1997-07-03COM M ERCIAL/l N DUSTRiau
PERMIT APPLICATION
225 Fiftn Street, Springf ield, Oregon gl4ll
SPRINGFIELE,
LOCATION OF PROPOSED WORK:
ASSESSORS MAP:
5
JOB NUMBER
INSPECTTON LtNE: 726-3769
OFFICE: Z26-3259
CET
TAX LOT:
PHONE:
O,( eo td ZIP:97 Y7 7
A(
J 6 Ftk/CITY;
E r
STATE:
((ADDRESS:
OWNEB:o Trea us
iuf FrqtVS F Duc*
VALUE:
NEW
€rDESCRIPTION
REMODEL
F WORK
ADDITION
L@
DEMOLISH OTHER
ooxt o F
NAME ADDRESS PHONE
ADDRESS
EXPIRES PHONE
OK 09 7 1(646etOLdaot t ( o
ELECTBICAL:
MECHANICAL:
CONTRACTOR'S NAME
ARCHITECT:
CONST.
CONTBACTOR #
G E NERAL:
PLUM BI N G
Single Fixture
fix. ad
Relocated B
ce
ft
ewerary
ft.
er
ft
Backflow Device
TOTAL PERMIT
F urn ace Ub &rner vent
000
rnace I burner & ventFu
>1
Floor furnace and vent
pe e
mounted unit heater
or
n
evanary p.
ecool
duct
n e
or
apartfrom
hood and duct
t Z/1/
Permit lssuance $10.00
TOTAL PERMIT do
- OFFICE USE -
LAND
H
NG POWER BUDGEI-
HEATER:
ls NOTU.nr,
FOR
WATER
FLOOD PLAIN
OCCY GROUP:
I OF STORIES:
QUAD ABEA:
* OF BLDGS:wORKro*,*u,
HANDICAP ACCESS:
-
SQ. FT,
VALUE
TOTAL VALUE OF PROJ
X
ANY 1
SQ. FTG MAIN
SQ. FTG ACCESS
SQ. FTG OTHER
PLAN CHECK FEE RCPT#DATE BY
BUILDING PEFMIT PLUMBING DEMOLITION
State 5% State
Su rc h argeMNI
5%7f,r /
,oo
2n
FENCE
SIDEWA
FT.SUBTOTAL
PAVING CURBC
FT.SYSTEM S
DEVELOPMENT
?a,%TOIAL PERMIT FEES
EXCLUOING ELECTRICAL
REQUIRED INSPECTIONS
It ls the responslbility of the permit holder to see that all lnspectlons are made at the proper time' To request an inspection' call
726.g76g(recorder), state your city designated job number, lob address, type of inspection requested and when you will be ready
for lnspecilon. Requests ieceived before 7,oo a.m. will be made the same worklng day, requests made after 7:00 a m will be made
the following work daY.
SITE INSPECTION: To be
made after excavation, but
Prior to setuP of forms'
UNDERSLAB PLUMBING'
ELECTRICAL &
MECHANICAL: To be made
before any work ls covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel ln Place, but
Prior to Placlng concrete'
CONCRETE SLABI TO bE
made after all lnslab building
service equlPment, condult,
plplng, accessories and other
ancillary equiPment items are
In place but before any
concrete ls Placed.
UNDERGROUND: Plumbing,
electrical, gas, sanltary sewer'
storm sewer, water and
drainage llnes. To be made
Prior to covering or filling
trenches.
UNDERFLOOR: Plumbing,
electrlcal, mechanical. To be
made Prior to installation of
floor insulation, decklng or
f loor sheathing.
POST & BEAM: To be made
Prlor to lnstallatlon of floor
insulatlon, decklng or floor
sheathlng.
FLOOR INSULAT]ON &
VAPOR BARRIERS: To be
made prlor to installatlon of
decking or floor sheathlng.
MASONRY: Steel location,
bond beams grouting or
vertlcals in accordance with
uBc 2415.
BING,
o work is to
be covered until these
inspections have been made
and aPProved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prlor to Placing
facing materials and before
framlng insPection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all PiPes, chimneys
and vents are comPlete and
the rough electrical, Plumbing
and mechanical are aPProved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vaPor
barriers are ln Place but
before anY lath or gYPSum
board interior wall coveri ng is
appl i ed.
FIRE & SEPARATION WALL:
Located and constructed
according to Plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gYPsum board,
interior and exterior, is ln
olace but before anY
plasterlng ls aPPlied or before
gypsum board loints and
fasteners are taPed and
f lnlshed.
PAVING: After grpvel is ln
place but Prior to Placing
asPhalt or concrete.
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special lnspector shall be employed
bv the Owner/ Contractor duri ng
construction of the following work. A
copy of the special testing reports shall
be f urnished to the Building Division.
STRUCTURAL CONCRETE: IN
excess of 2500 P.S'1. (306 a.1)
STRUCTURAL WELDS:
Performed on the iob. (2122 l)
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
ROOF SHEATHING AND
NAILING: Prlor to installlng
anY roof covering'
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating comPlete and form
work and sub'base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but Prlor to Placing
concrete.
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43'8.
SPECIAL GRADING,
EXCAVATION AN D FILLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU.LAM BEAMS: lnspectlon
Certificate bY an aPProved
agencY, furnished to the CitY's
Building Division before
beams are Placed. (2501 U.BC.
sTDS. 25-10,11).
STRUCTURAL MASONRY: (306
a.7)
.ln addition to the insPec'
tions specified, the Building
Officlal may make or require
other inspections of anY
constructlon work to ensure
compliance wlth the Building,
City or Development Code.
By slgnature, r state and agree, that I have caref ully examined the completed application and do hereby certify that all informatlon
herern is true and correct, and r further certif; in"t "ny
and all work performed shall be done in accordance with the ordlnances
of the city of springfield, and the Laws of the state of oregon pertainlng to the work described herein, and that No occuPANoY
will be made of any structure without permission of the Builllng safety oivision. I further certify that only contractors and employees
who are in compllance with oRS 701.055 will be used on this proiect'
I further agree to ensure that all required inspections are requested at the proper tlme, that proiect address is readable from the
street, that the permlt card ls located at the front of the property, and the approved set of plans will remain on the site at all
uction.times during co
Date
Sl gnature
o-?a-, -? 7y A/^A Q.
VALIDATION
2n
AMOUNT RECEIVED:
RECEIPT T:RECEIVED BY:
DATE PAID
FINAL PLUMBING SITEPLANREVIEwBoARD:Mustberequested2daysinadvance
ofthedateyouwishinspection'AllprojectconditionssuchaS
Lnoscaptng, parking lot stri ping, etc. must be completed before
requestlng thls insPection._{xX
FINAL ELECTRICAL
FINAL MECHANTCAL
FTNAL FIRE DEPARTMENT
ADDITIONAL COMMENTS:
FINAL BUILDING: Req uested after the flnal plumbing, electrical,
meohanlcal and Fire DePart ment inspections are made and
approved. No
Certlflcate of
occupancy of the Pre
pancy has been
mises can be made until a
Occu
n the
issued by the Building Dlvlsion
and post edo premises.
PLANS REVIEWED BY DATE
siaintN(.il:lt:Lp
D E V F.LOP M EAf 1'SE/r WCF. 5 11 E t;r\ | tf fit l: N r
CTrI OP SEEilGTTSIJ}
2?-s FlFTll $l ltl:
SPRINGFIEIO, OR 57.
(s.fi) 726-e,
FN( (51r)726.3
ADDBESS Of ff{SPBCTIONT 3L I sh.tt-r
g?ggPA[cr $sspE6moH SPPLIryI Irl'l
BITIIJDffi DTrISICIq
JOB NIJIIBER;I {(,o
*t'DA?E: Ju19 aS.
x
Olll{EBr PEOIE NOUBER:
! ouxsn,s I
llAPPIJCTNTI
APPLTC4NT'S AI}DBES$;
POR ACCBSS T0 PROPERTI - TELEPH0NE NlIl{3ERr
I
'l
zVt -,/ao
i
PEOPOSED USEI
I
t'
A $35.00 INEPE TAON PBB IS REQUIBED AT TBB III{P OP AIPIJCATION I
TUIS APPIJCATIOI{ FOBT{BE SIGNBD BY TIiE OHilER OF THE PROPARTY TO BE
j
,t
FOB OTETCE USE OilLY I
DATE PND;
DAIE OT INSPECTION:
DATE OF CERTTETCATE OP SOUPLI}TTiICB;
D 7UO7 I
RECEIPT NU}I8EB;
DA?B OF BEPORT:i
-,-t
f' ' :.: ..'l
COIOIET{TS:
I
i'
I
I
L6/82/90
PROPOSED FLOOR PLAN REQUIBED AT Til'IF OF APPLIGAfl
, ' rr- I
680G 0Zr 60CGl200 E urls 'AE(l (I,lds 0z:gT
h(tohttuctr/.ft$,, c-.trrg..r. ,ro.J t. R.?.i.(--* . 'l
I
t
I
SPR!NGFtELD
D EVE LOP M E NT S E RVI C ES DE PARTM E NT 225 FIFTH STRE€T
SPRINGFIELD, OR 97477
(541 ) 726-37s3
FAX (s41) 726-s68e
June 19, 1997
John Callas
Callaco Transport
23779 Hall Rd
Cheshire, OR 97419
Subject: Occupancy Inspection at36l Shelley Street, Springfield, Oregon.
Proposed Use: Auto/Truck/RV Collision, Paint and Repair
Dear Mr. Callas,
At your request, the Community Services Division/Building Safety conducted an
inspection of the building at the above address on June 9,1997. The purpose of the
inspection was to determine the suitability of the building for the proposed use as
indicated.
Based on the proposed occupancy, the existing conditions which are mentioned below do
not meet the minimum Building Safety Code requirements. Corrective measures must be
taken prior to occupancy to install, repair, replace or modiff the following items in order
for the building to conform to applicable safety codes:
STRUCTURAL
1. The State of Oregon requires that twenty five percent of the project cost shall be
designated to the removal of architectural barriers. In choosing which accessible
elements to provide, priority shall be given to those elements that will provide the
greatest access. Elements shall be provided in the following order:
An accessible entrance
An accessible route to the altered area
At least one accessible restroom for each sex or a single unisex restroom
Accessible telephones
Parking
Accessible &inking fountains
Occupancy Inspection
June 19, 1997
Page 2
When possible, additional accessible elements such as storage and alarms
2. The north wall which provides separation from the cabinet shop, shall be of one hour
construction. All penetrations in this wall shall be sealed in a mannerthat complies
with the Structural Specialty Code.
MECHANICAL
L A mechanical ventilation system designed by a mechanical engineer shall be
provided.
If you need any further information or have any questions regarding the above
requirements, please contact me between the hours of 8:00-9:00 a.m., 1:00-2:00 p.m. or
4:00-4:30 p.m. at 726-3759.
om Marx
Building Inspector
cc:Dave Puent, Community S ervices Manager/B uilding Offrcial
Lisa Hopper, Building Safety Coordinator
Major Defoe, 307 Q Street, Springfield, Oregon 97477
>.
I
R.r1(ea
O( F'qe
OFFTcE
lo<-ATrs- '
p."pos-.\ LAra.i[
C-Arra<-o ft''tri <^lr'god
-il "' "a Q11r'eq'trur P'-r
Sp.q) B*rtt
oD, l?w x /8'a"w x5s'6
I
t,t
t
D.' v. O.r
Chqsi,t
hnr4
)
3G t Sh<ll/ ST'--T
(so*F.e-s1 Co'aq, 69 congh-r)N
l
)
Dc5c-'P-1'o-,7.? oo n ,=T A??, i S' Lo-g ^
-l S' WrdT\
acq trtt'lrcs Qrrti5 l,r* ll,'rft' g.l poerl $ cele-: I ": l0'
I
+