HomeMy WebLinkAboutPermit Mechanical 1991-02-05COM M ERCIAL/ I N DUSTRIAL
PERM!T APPLICATION
225 Fitlh Street, Springfield, Oregon 97477
LOCATION OF PRO ED WOR
ASSESSORS MAP:
SPRII{GFICLO
JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
TAX LOT
OWNER:
CITY:
ADD
.PHONE:
ZIP:STATE:
NEW
-
REMODEL ADDITION DEMOLISH VALUE:ER
DESCRIPTION OF WOR
NAME ADDRESS PHON E
,S NA RESS EXPI RES E
ARCHITECT:
ELECTRICAL:
GENERAL:
CONT
MECHANICA
PLUM BI NG:
CONST.
CONTRACTOR #
PLU MBING
NO.FEE CHARGE
Single Fixture
Relocated Bld
(new fix. addtl s
)
Water Service
ft.
Sanitary Sewer
ft.
Storm Sewer
ft.
Backf low Device
TOTAL PERMIT
M EC HAN ICAL
NO FFF EHA RG tr
/Furnace/burner & vent
<100,000 BTUs t2t*./.T-c
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent
f rom
System apart
AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT ->?-t
E
ZONING
HANDICAP ACCESS:
FLOOD PLAIN
LIGHTING POWER BUDGET:
WATER HEATER
* OF UNITS:
LAND USE:
OCCY GROUP:
* OF STORIES:
QUAD AREA:
* OF BLDGS:
CONSTR. TYPEr
HEAT SOURCE:
SQ. FT.s/so. FT.VALUE
TOTAL VALUE OF P
X
X
SO. FTG MAIN
SQ. FTG ACCESS
SQ. FTG OTHER
RCPT#PLAN CHECK FEE DATE BY
2U?,
BUILDING PERMIT PLU M BI NG DEMOLITION
5% State
Su rch arg e
5% State
Surcharge
MECHANICAL I''.fu.y)tr /A.ca./5.4 FENCE
VALUE S
5% Siate
Su rcharq e .>,SIDEWALK
FT.
SUBTOTAL
PERMITS
PAVING CURBCUI
FT.
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
\e N\r\
- REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:OO a.m. will be made the same working day, requests made after 7:O0 a.m. will be made
the following work day.
SITE INSPECTION: To be V ROUGH PLUMBING, PAVING: After gravet is in
made after excavation, but ELECTRICAL & place but prior to placing
prior to setup of forms. <@H-ANleEDto work is to asphalt or concrete.
l-E-6lelEfri'ur lnese
UNDERSLAB pLUMBING, inspections have been made SpEC1AL INSpECTIONS: ln accordance
ELECTRICAL & and approved. Section 306 of the State Specialty Code
MECHANICAL: To be made a special inspector shall be employed
before any work is covered. ATTIC DRAFT STOPS & Oy ine Owner/ Contractor during
CURTAIN WALLS construction of the following w6rk. A
FOOTINGS & FOUNDATIONS: copy of the special testing reports shall
To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division.
excavated and forms are facing materials and before
erected, ail steel in ptace, but framing inspection' srRUcruRAL CoNCRETE: ln
prior to placing concrete. FRAMING: To be made after excess of 25OO PS.l. (306 a.1)
coNcRETE SLAB: To be the roof' all framing' fire
made after ar insrab buirdins Bi::5 ::.']ff 3l!:It",l,;;:r" FIRy,.T"',.-3"t H5t,3oi',rrr, ,
service equipment, conduit, and vents are complete and
::?[g;".?",];:{:? ?i:i""'::i ffi'fl:3l"",ltXi:,X iJ;[3:t: BI?,Xf],?EI-'T[9,'*I]:".in place but before any tighteiing operations. (306concrete is placed. TNSULATTON & VApOR a.6)
BARRIER: To be made after all
UNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are in place but FIREpROOFING: U.BC.storm sewer, water and before any lath or gypsum Standards 43-8.drainage lines. To be made board interior wall covering is
prior to covering or filling applied. S'ECIAL GRADING,trenches.
,NDERFL..R: p,umbins [||:,S";? XA'Jfl[H3"' EI:lUEiil-tlP,5J:'i],"1
electrical, mechanical. To be according to plans. chapter 29)
made prior to installation of
floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection
floor sheathing. - BOARD: To be made after all Certif icate by an approved
lathing and gypsum board, agency, furnished to the city's
posr & BEAM: To be made interiol and exierior, is in Building Division before
prior to installation of floor place but before any beams are placed' (2501 U'B.C'
insulation, decking or floor plastering is applied or before STDS' 25-10'11)'
sheathing. " Sypsum board joints and
fasteners are taped and STRUCTURAL MASONRY: (306
FLooR TNSULATToN & finished' a'7)
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 24.15.
RooF sHEATHTNG AND iHlS^H'",tJ,tt::i""1'"
NAILING: Prior to installing erected but prior to placing
any roof covering. concrete.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
*ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
property, and the approved set of plans will remain on the site at all
Sig Date
street, that the permit card is located the f nt of
times during const ction
DATE PAID:
RECEIVED
VALI roN AMOUNT RECEI
RECEIPT *:
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot stri pi ng, etc. must be completed before
requesting this i nspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
PLANS REVIE WED BY DATE 2-s-*
,,
ADDITIONAL COMMENTS:
OREGO'U
lr
225 PITTE STRBEf,
SPRINGFIEIJ), OREGON 97477
INSPECIION RBQUBST: 7
oFPICE: 726-3759
1 LOCATION
JOB DESCN.IPTION
c
PERHIT APPLICATION
City JobNumber qtlV86
SCBEDUI^E BELOIT
er,r Residential-Sing1e or
Multi-Pamily per dvelling unit.
Service Included:
Items Cost
\000 sq.ft. or less
tplch additional 5OO- sq. ft or portion
thereof
Each Manuf'd Home or
Hodular Dvelling
Service or Feeder
$ 8s.oo
s 1s.00
$ 40.00
Services or Feeders
Installation, Alterations or
Reloca t ion :
0b
200 amps or less
201 amps to 400 amps
-401 amps to 600 amps
-601 amps to 1000 amps
2
tO
Lv ,7i/iz
B.
Sum
Permits are non-transferable and expireif vork is not started vithin 180 daysof issuance or if vork is suspended for
180 days.
2. CONTRACTOR INSTALI^ATION ONLY
Electrical Contrac to, C{ { I ,7rrc
Address 2/4 So /I 4
ci Phone ?q/-)"3LSupervisor License Ndmber lC f(5
Bxpiration Date
constr contr. Nunber o j {"{
Expiration Date rt
Signature of Supervising Electrician
0vners Name s
eddress 405 *uq 99 l'lo .oCity S.rrutrnO r Phone Lgq -7.133r
OIJNER INSTALI.ATION
The installation is being made on
property I own vhich is not intendedfor sale, Iease or rent.
Ovners Signature:
DATE:
Temporary Services or Feeders
Installation, Alteration or Relocation
0ver 1000 amps/volts
Reconnect 0nly
200 amps or less
201 amps to 400 amps
-0ver 401 to 600 amps _0ver 600 amps or 1000 volt
SUBTOTAL OP ABOVB
5Z State Surcharge
TOTAT
$ s0.00
$ 60.00
$100.00
$130.00
$300.00
s 40.00
s see rrBrl
c.
a
$ 40.00
$ ss.oo
$ 80.00
above
D. Branch Circuits
Nev, Alteration or Extension Per Panel
One Ci.rcui t /
Each Additional '
Circuit or vith Service
-*$ 3s.00 5)
or Feeder Permit 3 $ 2.00 r
E. Miscellaneous (Service/feeder not included)
-Each installation
Pump or irrigation
Sign/OutIine Lightine_
Limi ted Energy/Res
Limi ted Energy/Comm
---------.l--ry-
-a--&--Zl+E *-
00
00
00
00
()u
s 40.
$ 40.
S zo.
$ so.
441
RECEIVED BY:
5
BLBCTRICAL
COM M ERCIAL/ I N DUSTRIAL
PERMIT APPLICATION
225 Fitlh Street, Springfield, Oregon 97477
SPRI,tGFIELE,
JOB NUMBER a^
INSPECTION LINE: 726-3769
OFFICE: 726-3759h,
LOCATION OF PROPOSED WORK:
ASSESSORS MAP:1 a TAX LOT:
PHONE:6Aa
CITY:
ADDRESS:
OWNER
BEMoDEL *
€-
ADDITION DEMOLISH OTHER VALUE: t/!a 4
DESCRIPTION OF WORK:
NEW
-NAME ADDRESS PHONE
EXPI RES PHONEADDRESS
L:
CONTRACTOH'S NAME
ARCHITECT;
PLUM BI NG:
MECHANICAL:
ELECTRICAL:
CONST.
CONTRACTOB #
PLUMBING
NO.FEE CHARG E
Single Fixture
Relocated Bldg
(new fix. addtl)
Water Service
ft
Sanitary Sewer
ft.
Storm Sewer
I t-
Backf low Device
TOTAL PERMIT
MECHANICAL
NO FFF CHA RGF
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent
f rom
System apart
AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
HEAT SOURCE az.*aZZ.-2
ZONING 4b/
- OFFICE USE -
* OF UNITS:
LAND USE:
HANDICAP ACCESS:
FLOOD PLAIN
LIGHTING POWER BUDGET:
WATER HEATER:
coNSrB. 'vet: */// aPB -OCCY GROUP:
* OF STORIES:
QUAD AREA:
* OF BLDGS:
$/SQ. FT.VALUESQ. FT.
TOTAL VALUE OF PROJ
X
a€>SQ. FTG OTHER
SQ. FTG MAIN
SQ. FTG ACCESS
pLAN cHEcK FF;-. 4-ea ssplr ? 3?! oerc 1?^2o-2.BY
46.77
BUILDING PERMIT /4-fa PLUMBING DEMOLITION
5% State
Su rcharqe 2-z>5% State
Surcharge
MECHANICAL FENCE
VALUE $
5% State
Surcharqe
SIDEWALK
FT,
SUBTOTAL
PERM ITS
PAVI NG CURBCUT
FT
SYSTEMS
DEVELOPMENT
TOTAL PERIVIIT FEES
EXCLUDING ELECTHICAL
Gfi6r72
Z=4.%- srArE: ZVT - ztp,42fa/
/ REAUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:0O a.m. will be made the same worki ng day, requests made after 7:OO a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
MBING,
be cove UN til these
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to coverlng or f illing
trenches.
UNOERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
f loor sheathing.
POST & BEAM: To be made
prior to installation of floor
insulation, decking or floor
sheathing.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
uBc 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
o work is to
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
f inished.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
PAVING: After gravel is in
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETE: tn
excess of 2500 P.S.l. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2722 t)
HIGH STRENGTH BOLTING:
During all bolt installation and
ti ghtening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.BC.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AN D FILLING:
During earthwork. (306 a.11 &
Chapter 29)
cLU.LAM BEAMS: tnspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
STDS. 25-10J1).
STRUCTURAL MASON Ry: (306
a.Z)
'ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
v
-/
,y
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS
/
^/
SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such aslandscaping, parking lot stri ping, etc. must be completed beforerequesting this inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until aCertificate of Occupancy has been issued by the Building Divisionand posted on the premises.
-S
PLANS REVIEWED BY DATE ,^>
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Informationherein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinancesof the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCywill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from thestreet, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at alltimes during construction.
Signature Date
VALIDATION AMOUNT RECEI
RECEIPT #
DATE PAID
RECEIVED
x
2