HomeMy WebLinkAboutPermit Building 1987-12-22NL m
COMBI NATION APPL ICATION/PERMIT -3
Job Address =2 E<L EIIERGY SOURCES
Heat
llater Heater
Ranqe
Ftg. I'lain_
Sq. Ftg. Access._
sq. rtg. otn""-T6T
l,lew Add Al ter Rep.
-f ence Oerno Change/Use
Zother_.A226;a<.tu
\
N
N
m
l-ega 1 Descri p t: on,/ Z.o Z- Z ?.2a, OgSDa qlagae
owner
Val ue of l,lork:
Addres s Builciinq Pernrit Info: Describe tJork(
Farnily Residence trlith Attached Garaqd
.e., Build Single
Construction Lender
Addre s s Phone
DESIGN TEAI.{name address 'I i cs. no.exDt res ohone no.
Primary
Structura I <.2
E I ectri ca I
Hechani cal
ACTORS n ame a ddres s 'lics- no-)(exnirps)(nhone no- )
Genera l
/
I I
I'lechanical
PLUI.{BI NG ELECTRI CAL I,,IECHAN I CAL
FEE CHARGE NO FFF CHARGF NO FFF CHARGE
6 Each single fixture 7.ro lS^Residence of
SQ FT
furnace/burner to
BTU' s
Relocated building
(new fix. additional)
New ci rcui ts al ts
or extensions
Floor furnace
and vent
S. F. Residence(l bath)SERV I CES
Recessed wal I
SDace heater and vent
Duplex (1 bath) each
Additional bath Temporary Constructi on Apol iance vent
seDa rate
[,later servi ce C hange
res i de
in existing
naP
Stati onar.v evap
coo I er
Sewer multifamily, comn. or
Indrrctrial
Vent fan with
sinole duct
Storm Sewer 0f Vent systern apart from
heatinq or A.C.
c0t"1t1./IND. FEEDERS Mechani cal exhaust
hood and duct
Instal I /a l ter/rel ocate
distrih- fepders l,Jood stove/heater
0f amps
ISSUANCF OF PFRI,IIT
TOTAL CHARGES /f,.ar-d TOTAL CHARGES TOTAL CHARGES
WHERE STATE LAI,I REQUIRES that the Electrical work be done by an Electrical Contractor, the electrical portion of this permit
shall not be vali'l until the Iabel has been signed by an Electrical Supervisor and returned to the Building Division
I HAVE CAREFULLY EXAMINED the completed application for oermit, and do hereb.y certify that all information hereon is true
and correct, and I further certify that a ny
of
and all work performed shall be done in accordance with the Ordinances of the Cityof Springof any st
field and the Laws of the State 0regon
the Bui
oertaining to the work described herein, and that NC OCCUPAI,ICY will be made
ructure without the permi
ffect
ssion of tdi ng
70t
Division. I further certify that my registration urith the Builder's
Board is in full force and e as required by ORS 055, that if exempt
055 wi] I
the basis for ex emption is noted hereon, and that
only subcontractors and employees who are in compliance with ORS 701 be used on
.R I
a2tl,,lAt'lE( pl ease print (\,lr.ir{}\
Zone 1*?/const. SVri%?lmts Ftg l,la i n x Value
Fire Zone Bedrooms Load
Grou
lSq
pF-2 J/*3,1
. Ftg. Acces
. Ftg. 0ther
I
Flood Plain S tori es ./Value
/YafE i V4< ue a5,z1ar'/@ 01?,2*72y875 Vk <"€- zzF ,7.ffS 4ee.rzza-*.f<
I7 rcINt VALUATION-
BUILDING PERI.IIT
Charges and
Surcharges
Plan Ck. Corrn/Ind
65"/"/81rlo Ppr Fpe 5Z
opment
PIan Ck. Res
30%/B1dq Per Fee ril
PLUI4BING PERMIT
Surcharges r
5O
{
Fence
Dgmo
ELECTRICA.L PERTIIT
Charges and
Surcha rges
Sidewal k
A/C Paving Tota'l Comb. Permit /7.25:
I,IECHANICAL PERHIT
Charges and
Surcharges
Curb Cut
TOTAL / {"-2{
V4 V//r l/o+>.aZ (:b->e.52€Be
/.
)
t4<€'|Zo/2fK.3g? l:;zs -6
I
COMBINATION APPLICATION/PERMIT (CAP)
I. Applicant to furnishA. Job AddressB. Legal Description
1. example- Tax Lot 100, Lane County Map Reference
17 03 432. example- Lot l. Block 3, 2nd Addition toS[Fiffiie1d EstatesC. Name, etc. of owner and construction lenderD. Energy Sources
1. examp]e- heat/electricgl ceiling/or forced air gasZ. example- waterheater/electrical/or soTarE. Square footage or valuation, etc.
1. example- 1250 sq. foot house, 500 sq. foot garage?. exampie- if new project, check new - if addition,
Efiecl-add, etc.F. Building permit information:1. exampie - construct singie family house with an
attached garage2. example - remodel existing garage .into fam.ily room3. example - convert single family residence intorestaurant (change of use)G. Vaiue of work as defined in Section 303 (a) of theStructural Specialty CodeH. DESIGN TEAM AND CONTRACTORS
To avoid design or construction delays, Building
Division Staff must be able to contact appropriate
persons regarding design information or job sitecorrections, etc.II. Abbreviated Plumbing, Mechanical, & Electrical SchedulesA. Except where blank spaces occur in the descriptionportion of the Mechanical and Electrical Schedules,the applicant need fill-in only the No. Boxes adjacentto the appropriate item(s) to be installedB. Full Plumbing, Mechanical, and Eiectrical Schedules
are available at the Building Division1. To conserve space on the permit form the schedules
have been abbreviated2. If the item(s) to be installed are not covered onthe abbreviated schedules you should consult thefulI schedulesC. BUILDING DIVISION STAFF WILL FILL OUT ALL FEES AND
CHARGES ON THE SCHEDULESD. As noted on the CAP, the label must be delivered to thee'lectrical contractor for signature by his electricalsupervisor. The general contractor is.not authorizedto sign the electrical jabel.
III. Applicant to sign and date
Hhenever possible, the initial application will be used asa worksheet on1y. lrJhere poss.ible, Building D.ivision Staffwili prepare a type written copy and return it to the
appl icant at the time the actual permit is issued for his
s i gna ture.IV. Fees and Charges
Plan check fees are due and payable at the t.ime of theapplication, and no plans will be processed until thesefees are paid. Ail other fees and charges are due andpayable when the permit is issued.
V. FOR OFFICE USE ONLY
PERMIT VALIDATION
/07)/
f 7- >211
CUPermi t Cl erk
PROJECT CONDITIONS TO BE SATISFIED BEFORE OCCUPAIICY:
Permit applicant exempt from registration with the Builder's Board because:
Additional Project Information:2
PLANS REVIEWED BY:
date /Z-?2^*2nameS'I g nature
HIE Req u ire d lnspeclions..
IT IS THE RESPONSIBILITY OF TIIE PER},!IT HOLDER TO SEE THAT ALL INSPECTIONS ARE MADE AT TIIE PROPER TII.IE,
THAT EAC1I ADDRESS IS READABLE FRO}{ T}iE STREEI, A}ID THAT TIIE PER}. IT CARD IS LOCATED AT TI{E FRONT OF THE
PROPERTY. BUILDING DIVISION APPP.OVED PI.ANS MUST BE ON JOB SITE AT ALL TI}{ES.
PROCEDURE FOR REQUESTING IITSPECTIONS: CaIl 726-3769 (recorder) state you CITY DESIGNAIED JOB NIJMBER,job address, type of inspection requested and vrhen you will be ready for the inspecticn. Contractors
or oirners name and phone nr::nber. Requests received before 7:00 am will be rnade the sarne day, requests
received after 7:00-arn will be nade the following work day.
Your City Designated Job Number Is:8zo %a
Job Address Z! 7Z Ssz<:z<.€? 52.
Owner:Phone:
Contractor:Phone
SITE INSPECTION: To be made ac t(after excavation, but prior
to setup cf forms.
I'NDERSLAB PLUMBING, ELECTRICAL
6 IIECHANICAL: To be :'oade befcre
any r*ork is covered.
CONCRETE SLAB INSPECTION: Tc beffiraing
service equipnent, conduit, piping,
accessories and other ancillary
equipment itens are in place but
before any ccncrete is poured.
ri(
FOOfiNGS E FOUNDAfICNS: To be nade
aIEe" Ete"cnes are excavaleo ano
forms are erected, all steel in
place, but prior to pouring concrete.
IrNDERGROUND: Plunbing, Electrical,
Gas, Sanitary Sewer, Storn Sewer,
Itlater and Drainage lines. To be
made prior to covering or filling
trenches.
LJNDERFLOCR:, Plumbing, Electrical,
l,lechanical. To be nade prior to
installstion of floor insulation,
decking or floor sheathing.
FIREPLACE: Prior to placing facing
naterials and before franing
inspect ion . r::iI /<a-
INSULATION 6 VAPOR BARRIER: To be
nade aftcr all i.nsulation and
required vapor barriers are in place
but before any lath or gypsun board
interior wal1 covering is applied.
FRAMING: To be nade after the roof,
iTE"-raming, fire blocking and
bracing are in place and all pipes,
chimneys and vents are conplete and
the rough electrical, plunbing and
heating uires, pipes and ducts are
approved.
FIRE 6 SEPARATI0N I{ALL: Located &
ccnstructed according to plans.
LA1]{ AND/OR GYPSTJM BOARD INSPECTION
To be nade after all lathing and
g)?sun board, interior and exteri.or,is in place but before any plasteri
is applied or before gypsum boardjcints and fasteners are taped and
finished.
WooDSTo\,ES: After installation isco@eil
SIDEWALK 6 DRIVEWAY Required for
all concrete paving within street
right-of-way, to be made after all
excavating complete & form work &
sub-base material in place.
CURB .{ND APPRoACH APRON: After forrns
are erected but prior to pouring
concrete.
PARKING LoT: After gravel is in
place but prior to placing asphalt
or concrete.
306 Building Code a special
inspector shal1 be ernployed by the Oxner/
Ccntractor during construction of the
fcllowing work. A copy of the special
testing reports shall be furnished to the
Building Division.
STRUCTURAL CONCRETE:
F.SlTl-'(so6 ar)-In excess of 300!
tr
E Preformed on theg
E
STRUCTUR{L hIELDS:
-
)oo, ll/zz t)
HIGH STRENGTH BOLTING: During all
561t fiffi;Ion-ia tighting
operations (306 a.5)
SPRAYED ON FIREPROOFING]ffi (u.B.c.
SPECIAL GRADING, EXCAVATION .AND
F!LLING: During earthwork. (306 a.11E@er 2s1
GLU-LAM BEA},IS Inspection Certi.ficate,
by an approved agency,furnished to
the City's Building Di.vision before
beans are placed. (2501-U.B.C. STDS.
2s-10,11) .
POST 6 BEAMI
ffitat lation
To be made prior to
of flocr insulati.on,
decking or floor sheating.
FLOCR INSULATION & VAPOR BARRIERS
To be made prior to installation
of decking or flcor sheating.
I-IAS0NRY: Steel location, bond beams
grouting or verticals in acccrdance
with U.B.C. Secticn 2415.
ROOF SI{EATHI}IG A}lD NAILING: Prior
to installing any roofing.
ROUGH PL$IBING, ELECTRICAL &
I',IECHANCIAL: No work is to be
until these inspectio:rs have b
made and approved.
)ct
FINAL PLUMBING
u"Lr -)
CITYIS SITE PLAN REVIEW BOARD INSPECTIOI{
* In addition to the inspections
specified hereon, the Building
Official may nake or require other
inspections of any construction
work to ascertain conpliance with
the Building, City or Zoning Codes.
Must be requested 2 days in advance of the date you
such as landscaping, parking lot striping etc. must
LL
\?
tr
FINAL ELECTRICAL
\q
FINAL TIECHANICAL
! r-1
be conpleted befcre requesting this inspection.
FINAL BIIILDING: Must be requesteC after the final Plunbing, Electrical, l'lechanical and Fire
Department inspections are made and approved. No Occupancy of the premises can be made until
a Certificate of Occupancy has been issued by the Building Divisicn and posted on the premisesE
c
A rkir rrou DEPARTMEITT
SICNA DATE
/
vx
*ALL r'inNHoLES AND cLEANours uusr BE .\ccEss , ADJUSTI{ENT TO BE I!{,ADE AT NO COST TO THE CITY
ATTIC DRAFT STOPS & CURTAI}I WALLS.
t]
trtr
Z