Loading...
HomeMy WebLinkAboutPermit Building 1992-06-17COM M ERCIAL/IN DUSTRIAL PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 SPRINGFlELO JoB NUMBEa ?=-egZ- INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK AZ ASSESSORS MAP TAX Lor: O *- ' PHONE: STATE ztP ADDRESS CITY: 224VALUE DESCRIPTION OF WORK: NAME ADDRESS PHONE R#ADDRESS EXPI RES PHON ECONTRACTOR'S NAME ARCHITECT: ELECTRICAL: CONST. CONT GENERAL: PLUM BI NG PLUMBING NO.FEE CHARGE Single Fixture Relocated Bldg (new f ix. addtl) Water Service Sanitary Sewer ft Storm Sewer ft Backf low Device TOTAL PERMIT MECHANICAL Nr)FFF CHA RGF Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart from AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - OFFICE USE _ LAND USE: ZONING* OF UNITS: HANDICAP ACCESS: FLOOD PLAIN LIGHTING POWEB BUDGET: WATER HEATER: OCCY GROUP: g OF STORIES: QUAD AREA: r OF BLDGS: CONSTR. TYPE: HEAT SOURCE: SO. FT.$/SQ. FT,VALUE TOTAL VALUE OF PROJECT X x X SQ. FTG MAIN SO. FTG ACCESS SQ. FTG OTHER pLAN cHEcK FEE?S, C > Rcpp DATE BY 65. /6 BUILDING PERMIT 3g-so PLUMBI NG DEMOLITION 5% State Su rcharge /- 2=5% State Surcharqe MECHANICAL FENCE VALUE S Zs,r ?fr#:zf 22 5% State Su rcharqe SIDEWALK FT. SUBTOTAL' PERMITS z/r. q7 PAVING CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERN4IT FEES EXCLUDING ELECTRICAL trtrnuAf,ilnAt. ft. .1. REQUTRED TNSPECTIONS -It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SpECIAL INSpECTIONS: tn accordance ELECTRICAL & and approved. Section 306 0f the State Speciatty code MECHANICAL: To be made a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor duringCURTAIN WALLS construction of the following w6rk. AV FOOTTNGS & FOUNDATTONS: copy of the special testing reports shall i"-;;;;J.;fter trenches are FIREPLACE: Prior to placing be iurnished io the Buitding Division. excavated and forms are facing materials and before erected, ail steel in ptace, but framing inspection' - srRUcruRAL CoNCRETE: ln prior to placing concrete. V FRAMING: To be made after excess of 250O P.S.l. (306 a.1) coNcRETE SLAB: To be ' the roof' all framing' fire made arter ail insrab buirding 3i::5 ::.':fi 3lE:It"f,;;:r" BIR:,.TyI3l.Y5tT',rrr, ,service equipment, conduit, and vents are complete andpiping, accessories and other incin-ary equipment items are :i?H::Hl["ji:,1'iJ;[i:1: Bl?lf],?Eo]uoT*,?i,,T]X"oin place but before any tighte-ning operations. (306concrete is placed. INSULATIoN & vApoR a.6) BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are in place but FIREpROOFING: U.BC.storm sewer, water and before any lath or gypsum Standards 43-8.drainage lines. To be made board interior wall covering isprior to covering or f illing applied. SPECIAL GRAD,NG,trenches. ,NDERFL..R: prumbins H:,S"5:"m'Jfl[Hf"' il;iJfiiil-tlP,5Jh'i],"- electrical, mechanical. To be according to plans. chapter 29) made prior to installation of floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection floor sheathing. BOARD: To be made after all Certificate by an approved Iathing and gypsum board, agency, furnished to the city's poST & BEAM: To be made interiol and exierior, is in Building Division before prior to installation of floor place but before any beams are placed' (2501 U'B.c' insulation, decking or floor flastering is applied or before STDS' 25-1011)' sheathing. ' Sypsum board joints and fasteners are taped and STRUCTURAL MASONRY: (306 FLooR TNSULATToN & finished' a'7) VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415. RooF sHEATHTNG AND :Hl3^H?,ti",:'of""X'" NAILING: Prior to installing erected but prior to placing any roof covering. concrete. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. *ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the is located at the front of the property, and the approved set of plans will remain on the site at all Signatu Date he proper time, that project address is readable f rom the street, t times d g ru ct VALIDATION AMOUNT RECEIVE RECEIPT *:RECEIVED BY: DATE PAID: FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. AII project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this inspection. FTNAL BUILDING: Flequested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certlficate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY D^rE4-/6-<2-- ,x