Loading...
HomeMy WebLinkAboutPermit Mechanical 1992-11-25COMM ERCIAL/ IN DUSTRIAL PERMIT APPLICATION 225 Fitlh Street, Springfield, Oregon 97477 LOCATION OF PROPOS ASSESSORS MAP: SPRINGF]ELO TT JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 TAX LOT: /I OWNER ADDRESS: CITY: PHONE: ZIP:STATE: VALUE:ADDITION DEMOLISH OTHERNEW- REMODEL DESCRIPTION OF WORK: NAME ADDRESS PHONE ADDRESS EXPIRES PHON ECONTRACTOR'S NAME ARCHITECT: MECHANICAL: ELECTRICAL: CONST. CONTRACTOR # G ENERAL: PLUMBING PLUMBING NO.FEE CHARGE Single Fixture Relocated Bldg. (new fix. addtl) Water Service ft. Sanitary Sewer ft. Storm Sewer ft. Backf low Device TOTAL PERMIT MECHANICAL Nn trtrtr ct{a Elctr Furnace/burner & vent < 100,000 BTUs I Furnace/burner & vent >'100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent f rom System apart AC or htg.+) Mechanical exhaust hood and d;rct nr Y-TIV Oa,D Lt-tL-Q.:*, t ^) / Aermit lssuan "" J l"- 1 $10.00 TOTAL PERMIT 45Ct] - OFFICE USE _ ZONING LAND USE HANDICAP ACCESS: LIGHTING POWER BUDGET: WATER HEATER * OF UNITS: OCCY GROUP: * OF STORIES: QUAD AREA: * OF BLDGS: CONSTR. TYPE: HEAT SOURCE: SQ. FT.$/SQ. FT.VALUE TOTAL VALUE OF PROJ SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER RCPT#PLAN CHECK FEE DATE BY BUILDING PERMIT PLUMBING DEMOLITION 5% State Surcharqe 5% State Surcharge MECHANICAL t5 FENCE VALUE $ 5% State Su rch arqe ,r\ A SIDEWALK FT. SUBTOTAL PERMITS "TWo-j luc{-)CURBCUT FT. SYSTEMS DEVELOPMENT dt ?5TOTAL PERMIT FEES EXCLUDING ELECTRICAL FLOOD PLAIN: EAY X -- REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any crete is placed ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and f inished. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. PAVING: After gravel is in place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. STRUCTURAL CONCRETE: In excess of 2500 P.S.l. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 t) HIGH STRENGTH BOLTING: During all bolt installation and ti ghtening operations. (306 a.6) SPRAYED ON FIREPROOFING: U BC. Standards 43-8. SPECIAL GRADING, EXCAVATION AN D FILLING: During earthwork. (306 a.11 & Chapter 29) GLU-LAM BEAMS: lnspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B,C. sTDS. 25-10,11). STRUCTURAL MASONRY: (306 a.7) 'ln addition to the inspec- tions specified, the Building Off icial may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. UNDERG electrical RBl+ry /9a8, D: Plumbing, sanitary seweL storm sewer, water and drainage lines. To be made prior to covering or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or f loor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheath i ng. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415. RooF sHEATHTNG AND iHRS^H'^,ti"r::f""X'" NAILING: Prior to installing erected but prior to placing any roof covering. concrete. FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot stri ping, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS PLANS REVIEWED BY DATE By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I required inspections are requested at the proper time, that pro.iect address is readable from the located at the front of the property, and the approved set of plans will remain on the site at all DateSi gnat thI f urther agree to ens street, that the pe ti duri AMOUNT R RECEIPT *: DATE PAID: RECEIVED VALIDATIO EI ,a aC'TY OF st'rilNGFtI:Lo ^ tted has the follow necific land use f.ab 225 FIFTB STREET SPRTNGFTELD, oREGoN 97477 INSPECTION REQUBSTz 726-3769 OFPICE: 726-3759 ELECTRICAL PERHIT APPLICATION 3 COHPIJTB FEB SCHEDULB BBLOV Nev Residential-Single or MuIti-Family per dvelling unit. Service fncluded:Items Cost 1000 sq.ft. or less Each additional 500 sq. ft or portion thereof Each Manuf'd Home or Modular DveIling Service or Feeder $ 8s.00 s 1s.00 $ 40.00 Services or Feeders Installation, Alterations or Relocat ion: 7or ,,.r}{hJa 1. LocATroN or rNSTALLATroNAutnorizcdSignatuie 3o /, slhot hu '+It. , + 5r DESCN.IPTI ON --T- A c IEGAL /n42-Z ^-Sum7 Permits are non-transferable and expireif vork is not started vithin 180 days of issuance or if vork is suspended for 180 days. 2. CONTRACf,OR INSTALI,ATION ONLY B Electrical Contractor Address gr- cit phone ?4 L' AASI- Supervisor License Number lb86.y Expiration Date to-l-gs Constr contr. Number 0 Expiration oarc 1 -l-93 Signature of Supervising Electrician Ovners Name Address l6OO Ci ty Phone bbb - 8a8o OTINER INSTALLATION The installation is being made onproperty f ovn vhich is not intended for sale, Iease or rent. Ovners Signature: DATE: 200 amps or less 401 amps to 600 amps _601 amps to 1000 amps_ Over 1000 amps/voIts Reconnect Only $ s0.00 s 60.00 $100.00 $130.00 $300.00 $ 40.00 Temporary Services or Feeders Installation, Alteration or Relocation 200 amps or less $ 201 amps to 400 amps - $ Over 401 to 600 amps _ $ Over 600 amps or 1000 volts se 40.00 5s.00 80.00 erBra bove P. Branch Circui ts lbo Nev, Alteration or Extension Per Panel one Circuit I $ 35.00 55J]C, Each Additional Circuit or vith Service or Feeder Permi t j $ Z. 00 (o , oO E Miscellaneous (Service/feeder -Each installation Pump or irrigation $ Sign/outline Lighting- S Limi ted Energy/Res $ Limi ted Energy/Comm $ not included) 40. 00 40. oo 20. o0 STIBTOTAL OP ABOVE 5Z State Surcharge TOTAL RECEIVED BY: 5 Trra lollowino I D City Job Nu b". ??/437 €-rr oornt-, c 4t. oo 4n<A, L.rrl *3.oS