HomeMy WebLinkAboutPermit Plumbing 1999-03-01COMM ERCIAL/I N DUSTRIAL
PERMIT APPLICATION
225 Fiftn Street, Springfield, Oregon 97477
SPF.INGFTELO JOB NUMBER Z
INSPECTION LINE: 726-3769
OFFICE: 726-3759
LOCATION OF PROPOSED WORK:3o 2 s,AlQ -// {
ASSESSORS MAP:/7t32 o 77al v
TAX LOT
PHON
ZIP:Zr'a/STATE:az
73a -24/)
CITY:
ADDRESS:
OWNER:
NEW
-
REMODEL ADDITION DEMOLISH OTHER VALUE:
5,DESCRIPTION OF WORK:
ADDRESS PHONENAME
EXPI RES PHON EADDRESS
^'/rLi
ARCHITECT:
PLUMBING
MECHANICAL
ELECTRICAL:
CONST.
CONTRACTOR #CONTRACTOR'S NAME
GENERAL:
o
o
PLU M BI NG
NO.FEE CHARGE
I
Single Fixture /f*
I Relocated Bld
(new fix. addtl
s
)
Water Service
ft.
Sanitary Sewer
ft
Storm Sewer
ft
Backf low Device
TOTAL PERMIT ,0 ?,"
MECHANICAL
NO FFF CHA RGF
Furnace/burner & vent
< 100.000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent Sys
from AC
tem apart
or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
VALUE$/SQ. FT.SQ. FT.
TOTAL VALUE OF PROJECT
X
X
SQ. FTG MAIN
SO, FTG ACCESS
SO. FTG OTHER
RCPT#PLAN CHECK FEE BYDATE
t.
BUILDING PEBMIT PLUMBI NG DEMOLITION
5% State
Su rcharqe
5% State
Surcharge
MECHANICAL FENCE
VALUE $
5% State
Su rcharo e
SIDEWALK
FT.
SUBTOTAL
PERMITS
PAVI NG CURBCUT
FT.
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
rules adoPted forth
!n
by tHA
oAR 9s2-001-0010
HEAT SOURCE:
-1
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:OO a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in
made after excavation, but ELECTRICAL & place but prior to placing
prior to setup of forms. MECHANICAL: No work is to asphalt or concrete.
be covered until these
UNDERSLAB pLUMBING, inspections have been made SpECIAL INSpECTIONS: ln accordance
ELECTRICAL & and approved' Section 306 of the State Speciatty Code
MECHANICAL: To be made a special inspector shall be employed
before any work is covered. ATTIC DRAFT STOPS & 5y the Owner/ Contractor duringCURTAIN WALLS construction of the following w6rk. A
FOOTTNGS & FOUNDATTONS: copy of the special testing reports shall
To be made after trenches are FIREPLACE: Prior to placing be furnished to the Buildiig Division.
excavated and forms are facing materials and before
erected, ail steel in place, but framing inspection srRUcruRAL CoNCRETE: lnprior to placing concrete. FRAMING: To be made after excess of 2500 P.s.l. (306 a.1)
coNcRETE SLAB: To be the roof' all framing' fire
made after ail insrab buirdins 3i::5::.':f, 3ffi:Ir";,;l:r" ;1l3,T"',.-3^t*Y5tT',rrril
service equipment, conduit, and vents are complete andpiping, accessories and other
incirary equipment items are :H H::lj,]t"ji:,X jJ;[::i: Bl?:f],?E]noT[,tl,,tI$t"oin place but before any tighte-ning operations. (306concrete is placed. TNSULATION & VApOR a.6)
BARRIER: To be made after all
UNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are in place but FIREpROOFING: U.BC.storm sewer, water and before any lath or gypsum Standards 43-8.drainage lines. To be made board interior wall covering isprior to covering or f illing applied.trenches. vH,,vv. spEclAL GRADING,
,NDERFLooR: prumbins [:::,fl'.'"'f;m'Jfl]",Yi"' El;fUt'liil-:li:,5Jb'i],"t
electrical, mechanical. To be according to plans. Chapter 29)
made prior to installation of
floor insulation, decking or LATH AND/OR GYPSUM GLU;LAM BEAMS: lnspection
f loor sheithing. BOARD: To be made after all Certificate by an approved
lathing and gypsum board, agency, furnished to the City's
pOST & BEAM: To be made interiol and exterior, is in Building Division before
prior to installation of floor place but before any beams are placed' (2501 U'B'c'
insulation, ctecking or floor plastering is applied or before STDS' 25"10'11)'
sheathing. - Sypsum board joints and
fasteners are taped and STRUCTURAL MASONRY: (306
FLooR TNSULATToN & finished' a'7\
VAPOR BARRIERS: To be
made prior to installation of
decking or f loor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
uBc 24'15.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
'ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all informationherein is true and correct, and I further certify that any and all work performed shall be done in accordance with tne Ordinancesof the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCYwill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with ORS 701.055 will be used on this project.
Signature Date
rthU er to nse reU hat red Snagre ri NSo are UE tedrequpec he ro ti ha roreqppeme,ec dad rESS Sp read abl thf romtreeshathermt,card S alocated h f ront thpeof e ro dan he aprty,pe SEroved of anspppl nremat on 5the te alESmUdnilnorUStn.ct os
VALIDATION
00
?4)6 f
0
AMOUNT RECEIVED:
RECEIPT *:RECEIVED BY:
DATE PAID:
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such aslandscaping, parking lot stri ping, etc. must be coinpleted before
. requesting this inspection.
FINAL BUILDING: Requested after the final plumbing, electricat,mechanical and Fire Department inspections are maie and
approved. No occupancy of the premises can be made until acertificate of occupancy has been issued by the Building Divisionand posted on the premises.
ADDITIONAL COMMENTS:
PLANS REVIEWED BY DATE
oaICITY OF
*i7 TGTIELr,
?.25 l: Ll!'.!'ll :;'lllll:l':'l'
SPITINGI]tEI,I), ORI{(;0N 9I4I I
INSPECI'ION REOUESI':'126-3769
0f PICE z l?-6 -3159 Date
1 . t,0c^'l'toN Ir r NSTAr,l,A'trOftuthorized te
T,EGAI, DIiSCITIPTION a
JOli PTION
er
l- Iil l- t t an.s ler.'ab.l.e alt<l exlrire
iI vorl< is trot startetl withirr 1tlO days
of issttance or i f worlt is sttspetrded f or
180 tlays .
2. CONI'ITACTOR INSTALLT\TION ONLY
Elec t rical Cotr IL-actor
Adcl ress B1./1
-o?o5
Supervisor Liceltse Number B5
Iixpiratiotr L)ate lo i)
corrstr corrtr. Nt-uttber 5+LlBl
Expi ra t iorr Da te r.-)O
Sig rra ture o pervising ectriciart
a),
Owners N
Address.
Ci ty Pl'tone €84{-i#a
OVNEII INST I
Tlre itrsta.l.lation is being made on
property I ourr r,rhic.h is not irltended
for sale, lease or rent.
Owtters Signattlre:
DAIE:
RECEI
The lollowlng project as submitted has '[?[iif;tr[?c^r, prtRurI'
^ppr,
r.c^'r t0Nzoning, and does not re specific
approval
b Number
SCIIEDULB I}IiI,OTI
A ev Residerrtial-single or
Mu1ti-Fanrily per dwelling unit'
Service Included:
I tems Cos t
1000 sq. f t. or less
Each additional 500
sq. ft or llortiorr
t lrereo f
liaclr Mantt ['rl llolne or
Flo<lular Dwelling
Service or Feeder
s Bs.Oo
s 40.00
tl Services or Feeders
Instal1ation, Af terations
or Relocatiotr:
200 anrps t-rr less
201 amps to 1100 alrPs
401- anrps to 600 amps --601 anrps to l-000 amps-
0ver 1000 amps/volts
-
Recounect 0n1Y
$ s0.00
s 60.00
$100.00
$130.00
$300.00
$ 40.00
C
l)
One Ci rcui t
Each Addi tional
Circuit or with Servi
or Feeder Permi t
B
SUBTOTAL OF ABOVE
5Z State Surcharge
32 Administrative Fee
TOTAL
Temporary Services or Feeders
Installation, Alteration or Relocation
200 anrps or less $ 40'00
over 4b1 to 600 arnps
.-- $ 80.00
over 600 amps or fbOO-GlTs see. "Bu aE6IE
Ilranch Circui ts
New, Alteration or Extension Per Panel
-{ g 3s.oo D*
CE?E
Sum
e lt($ is.00
$ 2.00
I
Miscellaneous (Service/feeder not included)
-Each installation
Pump or irrigation $ 40.00
t,irni ted Energy/Res
-
$ 20.00
5
RECBIVBD I]
2
4*
?/
Pltone @a
COMM ERCIAL/I N DUSTRIAL
PERMIT APPLICATION
225 Fifth Street, Springfield, Oregon 97477
LOCATION OF PROPOSED WORK:
ASSESSORS MAP
SPRIi.GFTELE,
"-J NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
TAX LOT:a2>E>a,
a/^ ^c C/,
&
5?-3BOPHONE:
4)42,.ztPSTATE:.-/ /CITY:
ADDRESS:
OWNER
NEW
-
REMODEL ADDITION DEMOLISH OTHER VALUE
DESCRIPTION OF WORK:
^EitEoA
I
ELECTRICAL:
ADDRESS PHONENAME
EXPIRES PHON EADD RESSCONTRACTOR'S NAME
MECHANICAL:
PLUM BI NG:
CONST.
CONTRACTOR #
PLU MBIN G
NO.FEE CHARGE
Single Fixture
Relocated Bldg
(new fix. addtl)
Water Service
ft.
Sanitary Sewer
ft.
Storm Sewer
ft.
Backflow Device
TOTAL PERMIT
or ht
au st
$10.00
an e
ex
or oorpen
pp ance
hood and duct
Floor furnace and vent
Permit lssuance
TOTAL PERMIT
Furnace/burner & vent
<1 BTUs
Furnace/burner & vent
1 BTUs
duct
f rom
nt
mounted unit heater
se parat e
cooler
nary evap.
_ OFFICE USE _
LAND USE:
ZONING* OF UNITS:
HANDICAP ACCESS
FLOOD PLAIN
LIGHTING POWER BUDGET:
WATER HEATER
OCCY GROUP:
* OF STORIES:
QUAD AREA:
* OF BLDGS:
CONSTR. TYPE:
HEAT SOURCE:
SO. FT,$/SQ. FT,VALUE
TOTAL VALUE OF PROJECT-
X
X
SO. FTG MAIN
SO. FTG ACCESS
SQ. FTG OTHER
RCPT#PLAN CHECK FEE DATE BY
26,2a
BUILDING PERMIT PLUMBING DEMOLITION
5% State
Surcharqe
5% State
Su rcharqe
MEH}.NICAV'>/-&a)),V./71;z-FENCE
VALUE $
5/6 state
S u rch arqe
'Fe :7*SIDEWALK
FT.
SUBTOTAL
PERM ITS
PAVING CURBCUT
FT,
SYSTEMS
DEVELOPMENT /Y.r/ '
TOTAL PERMIT FEES
EXCLUOING ELECTRICAL
-- REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726'3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:OO a.m. will be made the same working day, requests made after 7:OO a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
be covered until these
inspections have been made
MB lNG, PAVING: After gravel is in
place but prior to placing
No work is to asphalt or concrete.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
UN DERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or f illing
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
f loor insulation, decking or
f loor sheathing.
POST & BEAM: To be made
prior to installation of floor
insulation, decking or f loor
s heath i ng.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
uBc 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
x wwry%
ATTIC DRAFT STOPS &
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETE: tn
excess of 2500 P.S.l. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2722 t)
HIGH STRENGTH BOLTING:
During all bolt installation and
ti ghteni ng operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AN D FILLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU:LAM BEAMS: lnspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.BC.
STDS. 25-10J1).
STRUCTURAL MASONRY: (306
a.7)
'ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
f inished.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in'place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
ECT
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this prolect.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
he front of the property, and the approved set of plans will remain on the site at all
DateSignatu <,
street, that the permit card i located
times during construct
/2,?VALIDATION AMOUNT RECEIVED
RECEIVED BY:
DATE PAID
FINAL PLUMBING
FINAL ELECTRICAL
SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requestlng this inspection.
FINAL BUILDING: Requested after the final plumbing, etectricat,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
FINAL MECHANI.cAL
/7/A- 6rn
FIMAL FIRE DEPARTMENT
ADDITIONAL COMMENTS
PLANS FIEVIEWED BY DATE
Y
RECEIpT -: ??rg-