HomeMy WebLinkAboutPermit Mechanical 1999-04-23COM M ERCIAL/ I N DUSTRIAL
PERMIT APPLICATION
225 Fitth Street, Springfield, aregon 97477
SPRINGFIELO
JOB NUMBEFI
INSPECTION LINE: 726.3769
OFFICE: 726-3759
LOCATION OF PROPOSED WORK:3a> s Ae_lbM +4c
ASSESSORS MAP:TAX LOT o7
L,o I PHONE:3oz-
ZIP:
/-
e'/\STATE:77
mn4OWNER:
ADDRESS
CITY:
//
N VALUE:
(<OtDESCRIPTION OF WORK:
DEMOLISH OTHERNEW- REMODEL ADDI
ARCHITECT
coNsT.
CONTRACTOR'S NAME ADDRESS CONTRACTOR # EXPIRES PHONE
NAME ADDRESS PHONE
ltA^tL
ELECTRICAL:
v
MECHANICAL:Cs * rn-LrL 00dt-D oo
/61qrL/
G E NE RAL:
PLUMBING
NO FEE CHARGE
Single Fixture
Relocated Bldg.
(new fix. addtl)
Water Service
ft
Sanitary Sewer
ft
Storm Sewer
ft
Backflow Device
TOTAL PERMIT
MECHANICAL
Nr)FFF NHA trNtr
I Furnace/burner & vent
< 100,000 BTUs E oe
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f looi
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent sys
AC
tem apart
or htg.f rom
Mechanical exhaust
hood and duct
e/'7rzs71a ffi -&<aa
. aa, la
Permit lssuance $10.00
TOTAL PERMIT /Wr.r"/r, oa
_ OFFICE USE -
LAND USE:
* OF UNITS:
LIGHTING POWER BUDGET:
WATER HEATER:
HANDICAP ACCESS
FLOOD PLAIN
ZONING:
OCCY GROUP:
* OF STORIES:
QUAD AREA:
* OF BLDGS:
CONSTR. TYPE:
HEAT SOURCE:
SQ. FT.$/SQ. FT,VALUE
TOTAL VALUE OF PROJECT
X
X
X
SQ. FTG MAIN
SO. FTG ACCESS
SQ. FTG OTHER
RCPT#PLAN CHECK FEE DATE BY
24;,4
BUILDING PERMIT PLUMBING DEMOLITION
5% State
Surcharqe
5% State
Surcharqe*"wYV.y''4-,7a FENCE
VALUE $
SY" Stat'e-
Surcharge B -?y4 SIDEWALK
FT.
SUBTOTAL
PERMITS
PAVING CURBCUT
FT.
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTBICAL
oro j-
(
REQUIRED INSPECTIONS
It is the responslbility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
226-9769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for lnspection. Requests received before 7:00 a.m. will be made the same working day, requests made after,T:OO a.m' will be made
the following work day. r
stTE |NSPECTION: To be
^
ROUGH PLUMBING, PAVING: After gravel is in
made after excavation, but ' ELECTRICAL & place but prior to placing
prior to setup of forms. @EEADI@: No work is to asphalt or concrete.
be covered until these
inspections have been madeUNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in Place, but
prior to placing concrete.
CONCRETE SLAB: To be
made after all inslab building
service equi pment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
UN DERGROUN D: Plumbi ng,
electrical, gas, sanitary sewer,
storm sewer, water and
dralnage llnes. To be made
prlor to covering or f illing
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulatlon, decking or
floor sheathlng.
POST & BEAM: To be made
prlor to lnstallatlon of floor
lnsulation, decklng or floor
sheathlng.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY Steel location,
bond beams grouting or
verticals in accordance with
uBc 2415.
ROOF SHEATHING AND
NAILING: Prlor to installing
any roof covering.
x ru?ai##"r.
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor duri ng
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETE: In
excess of 2500 P.S.l. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2722 t)
SPRAYED ON
FIREPROOFING: U.B'C.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AN D FILLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU-LAM BEAMS: lnspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
sTDS. 25-10,11).
STRUCTURAL MASONRY: (306
a.7l
*ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vaPor
barriers are in place but
before any lath or gypsum
board interior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
f inished.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
lly examined the completed application and do hereby certify that all information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the Clty of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Bullding Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
roperty, and the approved set of plans will remain on the site at all
Signature Date
By slgnature, I state and agree, that I have carefu
street, that the permlt card ls located at tof
times during n.
qz >oVALIDATIONAMOUNT RECEIVED
RECEIPT *:
DATE PAID:
RECEIVED
FINAL PLUMBING
FINAL ELECTRICAL
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certiflcate of Occupancy has been issued by the Building Division
and posted on the premises.
,u
,K
FINAL MECHADTICALrrrt//1 */tr
FINAL FIRE DEPARTMENT
co MENTS:
PLANS REVIEWED BY DATE ?"27€477
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306