Loading...
HomeMy WebLinkAboutPermit Mechanical 1992-10-14COM M ERCIAL/ I N DUSTRIAL PERMIT APPLICATION 225 Fiftn Street, Springfield, Oregon 97477 LOCATION OF PROPOSED ASSESSORS MAP; ffi JOB NUMBER INSPECTION Ll NE: 726-3769 OFFICE: 726-3759 TAX LOT: I W)ur € w.! I ZIP:STATE: G).4--s{ q ,c C- ,.J'---7CITY: ADDRESS: OWNER: P- P/ 9 t4)gt\/t( 3V- <- NEW - REMODEL ADDITION DEMOLISH OTHER VALUE: DESCRIPTION OF WORK: ){-IEZ ADDRESS PHONENAME ADDRESS EXPIRES PHONE (f,lcutttI GENERAL CONTRACTOR'S NAME ARCHITECT; PLUM BI N G: MECHANICAL: ELECTRICAL: CONST. CONTRACTOR # PLU MBING NO.FEE CHARGE Single Fixture Relocated Bldg. (new f ix. addtl) Water Service ft Sanitary Sewer ft Storm Sewer ft Backf low Device TOTAL PERMIT MECHANICAL NO trFF CHA RGF Furnace/burner & vent <100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT _ OFFICE USE _ ZONING HANDICAP ACCESS: FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER CONSTB. TYPE: HEAT SOURCE: LAND USE: # OF UNITS OCCY GROUP: * OF STOFIIES: QUAD AREA: * OF BLDGS: SO. FT $/SQ. FT.VALUE TOTAL VALUE OF PROJ X x SO. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER RCPT#PLAN CHECK FEE DATE BY #>s.1,{ BUILDING PERMIT PLUMBING DEMOLITION 5% State Surcharqe 5% State Surcharge MECHANICAL I {.or FENCE VALUE $ 5% State Surcharqe ,'7 u SIDEWALK FT, SUBTOTAL PERMITS " ffiuanol lro,q)CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL PHoNE: '2/?6-'?-1,/ q,>v ->> ,l q?t REQUIRED INSPECTIONS .- It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SpEC;AL tNSpECTIONS: ln accordance ELECTRICAL & and approved. Section 306 of the State Specialty Code MECHANICAL: To be made a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & by the Owneri Contractor duringCURTAIN WALLS construction of the following w6rk. A FOOTTNGS & FOUNDATTONS: copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division. excavated and forms are facing materials and before erected, ail steel in place, but framing inspection' srRUcruRAL CoNCRETE: lnprior to placing concrete. FRAMING: To be made after excess of 25OO PS.l. (306 a.1) coNcRETE SLAB: To be the roof' all framing' fire made after ail insrab buirding 3l::5 ::.':ff 3,?$t"r,xl:r" ;1}3l.T.',f3^t,Y5tT',rrr, ,service equipment, conduit, and vents are'complete andpiping, accessories and other ancirr-rrv equipment items are :X?H::li,lt"i[,1'jJ;[3:1: 5l?lf],ffi]?T.|",?,o"1lH?".in place but before any tighte;ing operations. (306concrete is placed. lNsuLATloN & vApoR a.6) BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are in place but FIREpROOFING: U.BC.'storm sewer, water and before any lath or gypsum Standards 43-8.drainage lines. To be made board interior wall covering isprior to covering or filling applied. SPECIAL GRADING,trenches. ,NDERFLo.R: p,umbins Il::,I""=^fm'J;[,Y3"' il;lUEiil#iP'5J:'j]'"; electrical, mechanical. To be according to plans. chapter 29) made prior to installation of floor insulation, decking or LATH ANDTOR GYPSUM GLU'LAM BEAMS: lnspection floor sheathing. - BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency, furnished to the clty's posT & BEAM: To be made interior and exierior, is in ' Building Division before prior to installation of floor place but before any beams are placed' (2501 U'BC' insulation, decking or floor plastering is applied or before STDS' 25'10'11)' sheathing' PJ"1:lli:ilii;$".i:t srRUcruRAL MAS.NR* (306 f inished. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. RooF sHEATHTNG AND iHffi^il?rtj'tr:"f"":'" NAILING: Prior to installing erected but prior to placing any roof covering. concrete. 'ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot stri ping, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested after the final plumbing, etectrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCy will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the property, and the approved set of plans will remain on the site at all Signatu Date ,'/-- ' 27 card is located at the front of the ion street, that th times during , 4z-VALIDAT AMOUNT RECEIVED: RECEIPT *:RECEIVED BY: DATE PAID