Loading...
HomeMy WebLinkAboutPermit Mechanical 1994-04-20SP1lINGFIELO RESIDENTIAL PERMIT APPLICATION lnspections: 726'3769 Office: 726-3759 JOB NUMBER 225 Fifth Street Springf leld, Oregon 97 477 7af lye ,/ae 5zLOCATION OF PROPOSED WOFIK: TAX LOI SUBDIVISION: - aASSESSORS MAP: LOT:- BLOCK: //4q- 6 i){PHONE: STATE:ZIP:?tvzt it tY ^ OWNER ADDRESS: CITY: DESCRIBE WORK c-4 NEW- REMODEL ADDITION DEMOLISH OTHER EXPIRES PHONEADDRESSCONTRACTOR'S NAME MECHANICAL ELECTRICAL: CONST. CONTRACTOR # GENERAL: PLUMBING RANGE: * OF BDRMS: - OFFICE USE - LAND USE: ZONING CODE: FLOOD PLAIN: WATER HEATER: * OF UNITS: SECONDARY HEAT: SQUARE FOOTAGE: QUAD AREA: * OF BLDGS: OCCY GROUP: X OF STORIES: CONSTR. TYPE: HEAT SOURCE: To request an inspection, you must call726-3769. Thls is a24hour recording. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS Temporary Electric Rough Mechanical - Prior to cover. Final Plumbing - When all plumblng work is complete. Site lnspection - To be made after excavation, but Prior to setting forms. Rough Electrical - Prior to Final Electrical - When all electrical work is complete.cover, Underslab P!umbing / Eleclrical / Mechanical - Prior to cover. Electrical Service - Must be approved to obtain Permanent electrical power. 4 Final Mechanical - When all mechanical work is complete. Footing - After trenches are excavated.Fireplace - Prior to faclng materlals and framlng lnsP. Final Building - When all required inspections have been approved and building is completed.Masonry - Steel location, bond beams, grouting.Framing - Prior to cover. Other Foundation - After forms are erected but prior to concrete placement.Wall/Ceiling lnsulation - Prior to cover. Underground Plumbing - Prior to filling trench.l--l Drywall - Prior to taping MOBILE HOME INSPECTIONS Underlloor Plumbing/ Mechanical - Prior to insulation or decking. Post and Beam - Prior to floor insulation or decking.lnsert - After fireplace aPProval and installation of unit. Blocking and Set-Up - When all blocking is complete. Floor lnsulation - Prior to decki ng.Curbcut & Approach - After forms are erected but prior to placement of concrete. Plumbing Connections - When home has been connected to water and sewer. Sanitary Sewer - Prior to f illing trench.Electrical Connection - When blocking, set-up, and plumbing inspections have been approved and the home is connected to the service panel. Storm Sewer - Prior to filling trench. Sidewalk & Driveway - After excavation is complete, forms and sub-base material in Place. Water Line - Prior to filling trench. Fence - When completed. Rough Plumbing - Prior to cover. Street Trees - When all required trees are planted. Final - After all required inspections are approved and porches, skirting, decks, and venting have been installed. Er n E E E E tl E E E tl E E l-l Wood Stove - After installation. E E Lot faces Lot sq. ftg. Lot coverage Topography Total height Lot Type - lnterior - Corner - Panhandle - Cul-de-sac Setbacks P.L.HSE GAR ACC N s E WORK IN THE CT, OR ON THE HISTORICAL REGISTER? - lf yes, this application must be signed and approved by the Historical Coordinator prior to permit issuance. APPROVED: VALUE (A) X $/SO. FT. Garage Carport Total Value Building Permit Fee State Surcharge Total Fee BUILDING PERM!T ITEM SQ. FT. Main BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plans Reviewed By Receipt Numbe Date Paid Received By: Plan Check Fee: SYSTEMS DEVELOPMENT CHARGE (SDC) (B) Systems Development Charge is due on all undeveloped properties within the City limits which are being improved. ITEM Fixtu res Resldential Bath(s) Sanitary Sewer Water Storm Sewer Mobile Home FEE (c) N0 FT. FT. FT. PLUMBING PERMIT Plumbing Permit State Surcharge Total Charge ADDITIONAL COMMENTS Wood Stove/ lnsert/ Fireplace Unit Dryer Vent ICAL PERMIT (D) ,n/k 2F> N0 rnace Exhaust Hood Vent Fan lf,/2Mechanical Permit lssuance State Surcharge Total Permit By slgnature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information hereon is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springf ield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are ln compliance with ORS 701.055 will be used on this project. -- I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the app.roved set of plans will remain on the site at all times during construction. a Signature Date MI$CELLANEOUS PERMITS Mobile Home State lssuance State Surcharge Sidewalk - ft Curbcut - ft Demolition State Surcharge Total Miscellaneous Permits (E) TOTAL AMOUNT DUE (excluding electricat) (A, B, C, D, and E Combined) 2a* VALIDATION RECEIPT NUMBER DATE PAID AMOUNT RECEIVED RECEIVED BY Date