HomeMy WebLinkAboutPermit Mechanical 1994-04-20SP1lINGFIELO
RESIDENTIAL
PERMIT APPLICATION
lnspections: 726'3769
Office: 726-3759
JOB NUMBER
225 Fifth Street
Springf leld, Oregon 97 477
7af lye ,/ae 5zLOCATION OF PROPOSED WOFIK:
TAX LOI
SUBDIVISION:
-
aASSESSORS MAP:
LOT:- BLOCK:
//4q- 6 i){PHONE:
STATE:ZIP:?tvzt
it
tY
^
OWNER
ADDRESS:
CITY:
DESCRIBE WORK c-4
NEW- REMODEL ADDITION DEMOLISH OTHER
EXPIRES PHONEADDRESSCONTRACTOR'S NAME
MECHANICAL
ELECTRICAL:
CONST.
CONTRACTOR #
GENERAL:
PLUMBING
RANGE:
* OF BDRMS:
- OFFICE USE -
LAND USE:
ZONING CODE:
FLOOD PLAIN:
WATER HEATER:
* OF UNITS:
SECONDARY HEAT:
SQUARE FOOTAGE:
QUAD AREA:
* OF BLDGS:
OCCY GROUP:
X OF STORIES:
CONSTR. TYPE:
HEAT SOURCE:
To request an inspection, you must call726-3769. Thls is a24hour recording. All inspections requested before 7:00 a.m. will be
made the same working day, inspections requested after 7:00 a.m. will be made the following work day.
REQUIRED INSPECTIONS
Temporary Electric Rough Mechanical - Prior to
cover.
Final Plumbing - When all
plumblng work is complete.
Site lnspection - To be made
after excavation, but Prior to
setting forms.
Rough Electrical - Prior to Final Electrical - When all
electrical work is complete.cover,
Underslab P!umbing / Eleclrical /
Mechanical - Prior to cover.
Electrical Service - Must be
approved to obtain Permanent
electrical power.
4 Final Mechanical - When all
mechanical work is complete.
Footing - After trenches are
excavated.Fireplace - Prior to faclng
materlals and framlng lnsP.
Final Building - When all
required inspections have been
approved and building is
completed.Masonry - Steel location, bond
beams, grouting.Framing - Prior to cover.
Other
Foundation - After forms are
erected but prior to concrete
placement.Wall/Ceiling lnsulation - Prior to
cover.
Underground Plumbing - Prior
to filling trench.l--l Drywall - Prior to taping
MOBILE HOME INSPECTIONS
Underlloor Plumbing/ Mechanical
- Prior to insulation or decking.
Post and Beam - Prior to floor
insulation or decking.lnsert - After fireplace aPProval
and installation of unit.
Blocking and Set-Up - When all
blocking is complete.
Floor lnsulation - Prior to
decki ng.Curbcut & Approach - After
forms are erected but prior to
placement of concrete.
Plumbing Connections - When
home has been connected to
water and sewer.
Sanitary Sewer - Prior to f illing
trench.Electrical Connection - When
blocking, set-up, and plumbing
inspections have been approved
and the home is connected to
the service panel.
Storm Sewer - Prior to filling
trench.
Sidewalk & Driveway - After
excavation is complete, forms
and sub-base material in Place.
Water Line - Prior to filling
trench.
Fence - When completed.
Rough Plumbing - Prior to
cover.
Street Trees - When all required
trees are planted.
Final - After all required
inspections are approved and
porches, skirting, decks, and
venting have been installed.
Er
n
E
E
E
E
tl
E
E
E
tl
E
E
l-l Wood Stove - After installation.
E
E
Lot faces
Lot sq. ftg.
Lot coverage
Topography
Total height
Lot Type
-
lnterior
-
Corner
-
Panhandle
-
Cul-de-sac
Setbacks
P.L.HSE GAR ACC
N
s
E
WORK IN THE
CT, OR ON
THE HISTORICAL REGISTER?
-
lf yes, this application must be signed
and approved by the Historical
Coordinator prior to permit issuance.
APPROVED:
VALUE
(A)
X $/SO. FT.
Garage
Carport
Total Value
Building Permit Fee
State Surcharge
Total Fee
BUILDING PERM!T
ITEM SQ. FT.
Main
BUILDING VALUE, PLAN CHECK
AND BUILDING PERMIT
This permit is granted on the express condition that the said
construction shall, in all respects, conform to the Ordinance
adopted by the City of Springfield, including the
Development Code, regulating the construction and use of
buildings, and may be suspended or revoked at any time
upon violation of any provisions of said ordinances.
Plans Reviewed By
Receipt Numbe
Date Paid
Received By:
Plan Check Fee:
SYSTEMS DEVELOPMENT CHARGE (SDC)
(B)
Systems Development Charge is due on all undeveloped
properties within the City limits which are being improved.
ITEM
Fixtu res
Resldential Bath(s)
Sanitary Sewer
Water
Storm Sewer
Mobile Home
FEE
(c)
N0
FT.
FT.
FT.
PLUMBING PERMIT
Plumbing Permit
State Surcharge
Total Charge
ADDITIONAL COMMENTS
Wood Stove/ lnsert/ Fireplace Unit
Dryer Vent
ICAL PERMIT
(D)
,n/k
2F>
N0
rnace
Exhaust Hood
Vent Fan
lf,/2Mechanical Permit
lssuance
State Surcharge
Total Permit
By slgnature, I state and agree, that I have caref ully examined
the completed application and do hereby certify that all
information hereon is true and correct, and I f urther certify
that any and all work performed shall be done in accordance
with the Ordinances of the City of Springf ield, and the Laws
of the State of Oregon pertaining to the work described
herein, and that NO OCCUPANCY will be made of any
structure without permission of the Building Safety Division.
I further certify that only contractors and employees who
are ln compliance with ORS 701.055 will be used on this
project.
-- I further agree to ensure that all required inspections are
requested at the proper time, that each address is readable
from the street, that the permit card is located at the front
of the property, and the app.roved set of plans will remain
on the site at all times during construction.
a
Signature
Date
MI$CELLANEOUS PERMITS
Mobile Home
State lssuance
State Surcharge
Sidewalk
-
ft
Curbcut
-
ft
Demolition
State Surcharge
Total Miscellaneous Permits (E)
TOTAL AMOUNT DUE (excluding electricat)
(A, B, C, D, and E Combined)
2a*
VALIDATION
RECEIPT NUMBER
DATE PAID
AMOUNT RECEIVED
RECEIVED BY
Date