HomeMy WebLinkAboutPermit Building 1984-07-10(03 \BLT"'KEJiL/*r{ t aAL"' APPLTCATT)N/PER\,LIT
225 Notth ith Stv,eet
Sprtngfield, 0r'egon 97477
BuL Ldlng DLDl,sLon
7 26- 37 53
SPrlINGFTEI,.D
Date:
t4echanical
Constrltctton Lender . ,l
It ie the responsibility of the pemr|t laTder to aee that aLL inspections are nade at lhe ptope? tine, that eaeh adfuess is t'eaCnbi-e
fron tlu atreet, and tltat the permit eatd ie Located at the fzont of the propetty.*Building Diuiciot apto"*ed plan sVnLL remain on the Building SiLe at aLL tines.
PR)1EDUPE POR INSPECTI1I|_389pES!:CALL726-3769(recordet,) state your City Cesignaied job ntm,be!, iob aCiress, type of inspee=icn
eadyfot,inspection'Contractcy,soia*,n,"-no,e-andpionenunbel,.Eequestsreceixedbefcle7:00mttill be trade the sante dag, "equests nade after ?:00 on urtll be made the neet rmrking day.
Iour Citg Desigr,ated Job Nutnber fs:2rD16
ilCt\-
("LIS il. I # ff. Sec,nscrt s ct/)Job Locaticn:
Aeaeesorettlap# g l-1 -O3- 3GL(lgs ooTa lat #
U)aeq,tdrts-t L)ugo,)Svbdhtision:
Dpa. Bu,t)tmer:
Addtess: LVS il. l{4 Phone: 1+1 - 3 tA A,
Sc.,oarr ,ro up: 91*11City:
DescrLbe htork:-*ibZ;' {* +o D t,u t)r, Qwa
l#Zg Gr au hv,tc Aau
5a* lLF+ aar*t-
vatue 7?20 e
Date of App
t--l Nea
t-l
L I
Additicn
RemoCel
Qoo
Aoo
{,tu I8 g 3+K- aGeneral
55 lrSfLrtttofaLELectrical
Page 1 of 2
)o-l
SITE INSPECTION:
u"aoattoa'b"t
To be made after
pr.tot, tc set up of
forms
&
WCHAIIfCAL: To be any
couered.
Io be tnaCe
aie -etcaoated and
ane erected, but prior to
pourLng ecncrete.
UNDSRGPOUIID PLUMEINC, SEWEP,. W.4TER,
DRAIIIAGE: To be maCe pt"tor to fil-
@-T-renches.
tion or decking.
To be made prLor to
Lation ot,of floot'insu
decking,
ANICAL: No
ffi|T-these
mad.e and. approoeC.
BARRIER
be made after aLL Laticn
required oapor bawie?s ee in place
but before any Lath, gApsum boarC or
tmLL cooering is applied, and. before
ory iraulation is conceaLed.
INSPECIf)N: ?c be made
after is in place,
but prior to any taping.
MASONRL Steel Location, bond.
beans, gtouti,ng or tterticals ln
accordorce dth U.B,C. Secti,on
24L5.
WOODSTOVE:
ccnrpTetea.
After installation is
CURB & APPROACH APPON: After formsate ereeteC but prior to pouring
eoncrete.
SfDEWALK & DRII,EWA!: Eor aLL con-;;et; pd,rfu-frid" street right-
of-uny, to be made after aLL eoea-
uating conplete & forn wnk & sub-
base rnaterial in place.
DEI,fiOLilIO!] OR :.IOW' BUILDI;ICS
Sanitary saser capped ct proper4i Lire
Septic tank ptnped and filled rrith gra.;el
Findl - l{hen abcoe itens are ccrnpleted
and uhen Cenolition is cornplete o? stmic-
ture mooed otd. prenrises cleaneC up.
Hcnes
Blocking otd. Set-up
Plwrbing connecti.ons -- aaie? and. uater
El,ectrical Cc.nnection - Bloeking, set-ui
and. pLwnbing eonnections nn;st be apprcted
before requesting electrical inspecliott
Aecessomg Buildlng
Final - Aftet pcrches, skirting, decks,
etc. ee completed.
7
inspeetions hant e- b een
FTPEPLACE:
mat;nm;
PrLor to placirq
and. befot,e ftaning
facing
Lnspee-
ltust be requested aftet,
'been nade anC approoed.
FIIIAL PLUMBING
MECHANICAL
IENCE: Ilhen eonplete -- ProoiCej&dd or mouab'l,e' seetians thnough
P.U.E.
ALL p,oject condttions, such as the i.nstallation of street trees, co:rpletion of tip
requined LanCsecping, etc., rmtst be satisfied before tke BUfLDING FfNAL ean be nequested.
FINAL BAILDfNC: The Einal Building fnspeetiorl must be requested after the Pinal PlwnbingElectrical, and. Mechanical Inspections haue been made ard'approoeC.
FINAL ELECTRICAL
*ALL I4ANH)LES AND cLEANours MUST BE A1zESSTBLE, ADJUSTIIEvI ro BE tLtDE /.? tlo ccsr ro cny
of
tr
u
T
BeCt,oons:
-
. FTG
Aceess
tou"e
IIEM x Value
Df House
Topography
Lot Faees -
Ileat
l,later
Fi
LCT TWE
_ fntericr
_ Comer
_ Panhandle
CUL-de-sac
tot Sq. ?tg.
7 of iot Crrrr.og, 7{S
;"::r";;;: 6{9r-
Main
Gsaqe
Carport
t
@o?u
l\DC)Z"q$
TOTAL VALUE tlq2c)-
(uelue)S.D.C. 7.5 r
o63
Building Volue & Permit
This pertmt is granted on the e$press condition tlnt the said consttuctionstnll, in all respeets, conform to the Ordinance adopted iy the City ofSpringfteld, includi,ng the Zoning Crdinance, regulcting the ecnstracticn
and. use of buildings, utd may be suspend.ed oy rettokeC at cny time upon oic-lation of dny prcoisions of said 1ydir,ances.
,t
Building Petmi,t
?otal Owrges
State
Plumbing Perrnit
N9 pereon shall constmtet, inslaLl., alter ot elnnge anA ne?n cn ecisting
glutnbing ot, dtainage sAstan in uhole on in part, unless such person is- the
Legal possessor of a oalid phtmbet,ts Li,cense, eneept t|",at a pbtson mag do
plutnbing uork to property uhich is oaned, Leased or operated bg the "ppli-cant.
.\(P
NO FEE CHARGE
Seuer
t#:
Signed:
Pi.ctutes
Resil.enti.a.L (1 bath)
Plwnbing Penrit
Electricol Permit
Wlez,e State Lau yequires tlat the electrical uotk be done by an Eleetniealcont?actor, the electrical portion of this permit slnll not be talil untilthe Label lws been signed bg the Electtical- Contractor:.
total
tNau/Ecterd. Cit cuits
Setwice
-- ENCROACILMENT --
nsM NC FFtr CIIARCE
*
Mechqnicol Permit
llcodstoite
Vent Pot
E*lnnet Hood
D
PetmLt fssucnee
l"leclnnical Permit
Sec"ritA Deposit
Storage
Maintenance
Perwit
Cvlbeut
Sida,talk
Fenee
Electpieal Label
Mobile Horne
taL
K
f HAW CAREFULLY EXA],|INED the cornpleted application fot pennit, and do
hereby certify that aLL information het,eon is true and ebrrect, anC ffurtker eertify that any ard aLL uork perfor-ned shall be done in aecor-
dance tith the Ordinances of the City of Spr.ingfield, and the Lat;s of the* State of 1r,egon pertaining to the uotk Cesbribbd herein, etd tlwt uO oCCu-
PANCY Lrill be nude of any structure uithout permission of the Building Di,-oision. f further eez,tifE that onlg conttaclons and enplcgees uho atb in
eonpliance dith ORS ?01.055 uiLL be used on thie project
{9lvhp \,
lo?O?AL AMOUNT DUE:*Signed
eDQ
Date
ar/
NEM
Hctey
lotal Clnz,aes
State Swehanqe
I
Subdioision:
Otmer:
Ad.dress:
ci-fu:
.. RESIL-NTIAL..
APPLICATTON/PERMIT
225 North 5th Street
Springfield" 2r'egon 97477
Building Diuision
7 26-37 53
Job Loeaticn:
Aesessore Map #7
SPFIINGFIEI.D
?c,s Iat #
your City Desigtated Job Nutnbez, fs
INSULA?ION/VAPOR BARRIER TIISPECTIO\I :
Io be made aftez, aLL insulaticn and
required oapor burie?s @e in pl.a.ee
but before ory Lath, Wpsum boazC or
tnLL couering i.s applied, and. before
oty iwulation is concealed.
DRYWALL I]ISPECTTON: ?c be made
aftet, aLL dtyuall is in place,
but prior to atty taping.
MASONRY: Steel Location, bond
beons" grouting or uertieals in
aceordotee tLth U.B.C. Section
2415.
WO)DS?)VE: After instal'Lation is
antpleted.
CURB & APPR1ACH APPON: After fornsa.e e?ect;AE;V;Zo" to pourtng
concrete.
SID4WALK & DRfIEilAI: For all eon-aetenaD@Affi street rLght-
of-txA, to be naCe aften aLL etca-
oating complete & forn tsotk & sttb-
base rmterLal in place.
?eeei
Date:
IL,
CE
Ll
CeneraL
Conshuglict_-LendeP
eTTl TNeDF-dTnit.
e-;auatlo",-ilt
forns
FIIIAL PLUI4BIIIG
FINAL I,ISCHAilICAL
FINAL ELECTRICAL
To be nade aftet,
prior tc set up of
It ia the responsibilitg of the permit ltoZder to aee that aLL inspectiot'rs ee nade at the Ei?oper tine, thdt each address is r,satn;l2jnol the at?.eet, and. tlnt the permit catd. ie Loeated at the fzor.t of th.e property*Suilding Ditisiotz appro"*ed platt sVtcLL remain on the Bunlding Sitc at aLL' fihes.-
PI?OCEDUPE FOR fNSPECTI9N_R!9WS!:CALL726-3769(reeorden) state your Citg Cesigntted job ntorber, job aCitess, tgpe of inspee=icneadyfolir"spection,Contlaetaisoia.,.,"",,o,,eLnd,p7nt,enunber.-Pequests,eZel.i;LabZ7cre.7:0Can
:,vLLL be nade the sane day' ?equests nade after 7:00 an uyLlt be nade tke nest wtkiS dag.
b
-1
ANDERSLAB PLUMBING, ELECTRICAL &,lffiny
uo?k 1,s cooeted..
a roormc t F\uNDATT\N: To be raCe
) An;;-Aene;;;-are escaated and.
fonns are erected, but ptiot to
pouttt'tg ccnereta.
-
uNDERGRouttD pLUMpf!Sr_EWEpr_u!!!!,
)Lirq trenchee.
-1 unomrtooR pLUr.ErNG & MECHANT:AL:lof
floor insuT,ation ot decking.
I POS? AND BEAM: ?o be made pr.tor to
) TGiiGlan ol floon insuT)tion or
decking.
-1
ROI.ICH PLNEIIIG. ELEC?RICAL & MECH-
I1-
-
u?rtil these inspeetions haoe besr;
made and. aporoued..
1 rnwtacei wio, to placirg facingI ncte"lals and before T"oning ir"pn"o-
tion.
I fruaguc: l"tust be "equested afte?
) "ppr"rr"L of nough pl)trbing, ilectni-cal & mechanical. ALt roofing
bracittg & chinmegs, ete, rrust be
. eotrpleted. llo ucrk ie to be con-
. cealed unttl this inspeetLon lws
'been nole anC approtted.
?ENCE: hlhen eornplate -- ProuiCe
gates or nooable seetions through
P.U.E.
w
l
lI
l
ALL project eonditions, sueh as the i.nstallation of street trees, co:oletton of the
requi"ed LanCscqing, etc., iilst be satisfied befo?e the BtfiLDING FINAL ean be requested.
FINAL BUILDING: The ?inal Building Inspeetion r,tust be requested cftet' the Final Plunbi,ng
Electrical, anC t*echartcal Inspeetions haoe been made and approoeC.o
//
1.- "?/Phone:
/.#a
(-h-rd
DEI.DLTTIO!] OR !,!OW) BU,
Sanitary saser captped et proper4i Lite
Septic totk y*ped cnd filled tith graiel
Final - lt*ten abcue itens are ecmpleteC
and uhen dertclition is eotnplete o! stniz-
tuve mooed anC. ptemises cleaneC up.
Hcnes
Bloeking otd. Set-up
Plunbing connectione -- sarer od. uater
Electrical Ccnnection - Bloeking, set-ut
and. plunbing connecti.ons rntst be apprcted
before requesting eleclrical inspectior:
Aecessory BuilCing
pcrckes skirting, decks,Firnl - After
etc. ate eomp
Page 1 of 2*ALL I4ANHCLES AND CLEANOU?S IIUS? BE ACCESSTBLE, ADJUSTIIZIII TO BE |IADE I ilO CCST TO CITY
4
Na,t
Additicn
Date of
7frptq ZtaofufuDesez4be l,lork:
7,leL,o { {oo,Value
JOB NO.
Plunbing Penrtt
?otal
SOLAR AC'^;S REQ.-L-co *
Gr.ouD:Beiroons
uaxe
liea.t
ud.te yaad-
Reeeipt #
Sigted:
Lace
Plumbing Permit
Ng pereon shall consttwet, instal!, alter ot clmnge 6nA nea cr eristing
glwnb,ing or drainage syst,q.n in uhole or in patt, unlesi sueh person is- the
Legal possesson of a oalid plutnbez,ts Lieense, escept th,at a person nay do
plwnbing uork to propettA uhieh is ottned, Leased or opetated by the oppli-
eant.
Electricql Permit
Vhere State Las requires that the eleetrical uork be done by an Eleetrtcal
Contractot,, the elec+-tical portion of this pernit stwll not be oaliC untilthe label has been signed by the Electrical Contyactor.
PLdn Eeanine?
f EAW CAREFULLy EXLAINED the eornpleted appli.cation for permit, arld do
hez,ebg eertify that aLL infortnation hereoi ia ttae and e'ottectj anL t
futtker certify that any ard aLL uork perfortted slall be done in aceot-
dance trtth the Ordinances of the City of Springfield, and. the Laas of the* state of 2regcn pertaining to the uork cescribbd herein, end tlat No occu-
PANCY tlill be nade of qA st"uetur,e uithout permission of the Buitding N-tsi.sion. f furthe, certifg that only eont?actors ad. anplcyees uho aie inconpliance uith oRS z0L.0ss uiLL be used on this p?oject
I
Building Volue & Permit
This petnnt is granted on the ecp"ess eond.ition ttnt the said consttwctionslnll, in all respeets, conform to the 1rdirwzce cdopted 5:y the Ci.ty ofSpryngfield, ineluding lhe Zoning Cydinance, regulcting th-e ecnsttu-cticn
and.use of buildings, otd nay be suspend.ed or reuokeC it "ny time upon oic-Lation of anA prcuisions of said Otdir.ances.
TOTAL VALUE
th toxe
t
IIEM F?C x Va
,(
NEM NO FEE CHAPGE
s.D,c. 1.5 c
i!ouse
Lot Faees -
Building Penit
?otal Clanges
LCT ?WE
_ fntericr
_ Cor.ner
_ Panhand.Le
_ CUl-de-sac
Iat Sq. F*.
% of Lct Cooerage_
# of Stortes
?otal Height
Topography
Pi.cttpee
Resid.et'ttial (1 bath)
Sanitaty Seuer
Watet
C.IAR,GENOFEE
Res. Sq. fta
Neu/Eotend Circuits
fanpc"@y Settsiee
-. ENCROACITWNT --
nxM NC FEE
*
Mechqnicol Permit
oo
bha)st Hoo,7
lJcodsto;se
Permit fssuanee
Meelnnicel Permit
, (eo
15,
Sectritv Deposit
E!9rog.
Maintenance
Permi,t
-
Cvtbatt
Sida,talk
Penee
LLeetrlcaL La.beL
Mobile Hane
TOTAL AT4OUII? DT]E: *(5,6D
g /,,
ELecttieal Permit
State Swc|anae
Iotal Clnrces
Vent Fot
SPRINGFIELD
CrrY OF SPRINGFIELD
Department of Public Works 1 885- 1 9BS Sprinslield Centennial vear
January 29, 1985
l,tr. Dale Bean
645 North 18th Street
Springfield, Oregon 97477
Dear Mr. Bean:
The Springfieid Building Code Administrative Code requires that, in order for a
permit to remain valid, construction work authorized by it must begin withil 18q
days from the date of purchase of the permit. If work is suspended or abandoned
dui.ing the course of construction for a period exceeding 180 days, the permit will
automatically expire.
If a permit has expired and suspension and/or abandonment of work on a project
has nbt exceeded one year, a permit to start or resume work may be purchased for
one half the fee required for a comparable new permit, provided that no changes
have been made in the original plans and/or specifications.
If a permit has not yet expired and a permit holder anticipates the need for more
time to begin construction work, the Superintendent of Building may choosq to_
grant a one time extension of the permit not to exceed 180 days upon receipt from
[he permit holder of a written request explaining why the extension'is necessary.
The attached form indicates the most recent information in our records with
regard to construction activity associated with your permit. Please advise
this office of your intentions with regard to the permit by ten (fO) aays
from the date of this letter.
PIease direct alI inquiries to the Springfield Building Safety Division at 726'3659.
Si ncerely,
Lisa Hopper
Building Safety Division
attachments
J.\
225 North Sth Street o Sprinsfield, Oreson 97477 . 503/726-3705
CERTIFIED LETTER
JOB ADDRESS:ALq.h 1 R?h Strecf JOB #: 840467
I,AST ACTIVITY DATE:
OTHER:
R/A/R4 NO INSPECTION RECORDED:
CURRENT STATUS OF PERIIIIT:
".VALID: However, your permit witl expire on 2/8/8s
rf you wish to request an -extension of your permit, please notify thisoffice in writing prior to the above mentioned date.
EXPIRED: Your permit expired on
If you plan to start or resume work on the project, a new permit must beapplied for.
*If the 'texpiredt' box, above, is checked and we do not hear from you by
*
ffi.l;}"s:l,3i,i,fi"}"I}iu.3l".i5iH,i:..",),we will clear our