HomeMy WebLinkAboutPermit Building 1992-12-14COM M ERCIAL/ I N DUSTRlAL
PERMIT APPLICATION
225 Fitlh Street, Springf ield, Oregon 97477
LOCATION OF PROPOS
ASSESSORS MAP:
SPFIINGFIELO
*,t".t
JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
TAX LOT
OWNER:
ADDR
CITY:STATE:
PHONE:
ZIP:
ADDITION DEMOLISH OTHER VALUE
DESCRIPTION OF WOR
NEW
-
FIEMODEL
NAME ADDRESS PHONE
SN ADDRESS q7E H )kCO
ARCHITECT:
CONST.
CONT
MECHANICAI
ELECTRICAL:
GENERAL:
PLUMBING
PLU MBIN G
NO.FEE CHARGE
Single Fixture
Relocated Bldg.
(new fix. addtl)
Water Service
ft
Sanitary Sewer
ft.
Storm Sewer
ft.
Backflow Device
TOTAL PERMIT
MECHANICAL
NO FFF CHARGE
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent
f rom
System apart
AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
_ OFFICE USE _
LAND USE:
ZONING* OF UNITS:
HANDICAP ACCESS:
FLOOD PLAIN
LIGHTING POWER BUDGET:
WATER HEATER
OCCY GROUP:
* OF STORIES:
QUAD AREA:
g OF BLDGS:
CONSTR. TYPE:
HEAT SOURCE:
SO. FT.$/SQ. FT.VALUE
TOTAL VALUE OF PROJ
X
X
x
SQ. FTG MAIN
SQ. FTG ACCESS
SO. FTG OTHER
RCPT#PLAN CHECK FEE DATE BY
BUILOING PERMIT eir),5r)PLUMBI NG DEMOLITION
5% State
Su rch arq e / o3 5% State
Su rcharoe
MECHANICAL FENCE
VALUE $
5% State
Surcharqe
SIDEWALK
FT.
SUBTOTAL
PERMITS
PAVI NG CURBCUT
FT.
SYSTEMS
DEVELOPMENT
,S3TOTAL PERMIT FEES
EXCLUOING ELECTRICAL
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726-3769 (recorder), state your City designated job number, job address, type of inspection- requested and when you will be ready
for inspection. Requests received before 7:00 a will be made the same working day,UeStS e after 7:0O a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
BING,NG: After gravel is in
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or f illing
t re nc hes.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
f loor sheathing.
POST & BEAM: To be made
prior to installation of floor
insulation, decking or floor
sheathing.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
anY roof covering.
be covered until these
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
f inished.
GLU-LAM BEAMS: lnspection
Certif icate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
srDS. 25-10J1).
STRUCTURAL MASONRY: (306
a.7)
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
L: No is
CURB AND APPROACH
APRONS: After forms are
erected but Prior to Placing
concrete.
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor duri ng
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETE: In
excess of 2500 PS.l. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2722 t)
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.BC.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
*ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this i nspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
ADDITIONAL COMMENTS:
PLANS REVIEWED BY DATE
By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 70.1.055 will be used on this project.
inspections are requested at the proper time, that project address is readable from the
e front of the property, and the approved set of plans will remaln on the site at all
Signature tDate
ensure that all reI further ag
it card is loc
tion
street, that tl
times during
VALI o AMOUNT RECEIV
RECEIPT #RECEIVED BY:
DATE PAID
5 t.r |l t{ (; l'r r:1- L)
l1r
225 FIFTII STRIIIiT
SPRINGFIELD, OREGON 9747]
INSPECf,I0N REQUBST. 726-3769
0FPICE: 7?.6-3759
2fi,The lollowing Proi
zoning, and dcteo
approvai.ELBCTRICAL PBRHIT AP PLICATION
Zorring-L
3.
A
qA\\o3f)
Permits are non-transferable and explre
1f vork is not started vlthin tBO days
of issuance or if vork ls suspended for
180 days.
2. CO}ITRACTOR INSTALINTION ONLY
E}rical Contractor
Adcl r:ess
Ci ty
Supervisor Licen ber
Expiration Dat
Constr Con . Number
Expir on Date
si ture of Supervising Electrici
ovners nur" fox,o [,Ju ,aa.,J
Atldress A-l t{ Rrnel,e Ro
ci ty Frt C*gpf rn"ne 14-3-Q r o f
OSNr.n, INSTALLATION
The installation is being made on
property I own vhich is not intended
for sale, Iease or rent.
Signature:
7/
Ci ty Job Number
LBTB BBLOV
Nev Residential-Single or
HuIti-FamiIy per dvelling unit.
Service fncluded:
Items Cost
1000 sq.ft. or less
Each additional 500
sq. ft or portion
thereo f
Each Hanuf 'd llome or
Moclular Dvelling
Service or Feeder
s 85.00
$ 1s.00
s 40.00
Services or Feeders
Installation, Alterations or
Relocation:
Signatu
1
Sum
zP',h ,t:
B
200 amps or less
201. amps to 400 amps
-401 amps to 600 amps _
601 amps to 1000 amps_
Over 1000 amps/volts
s s0.00
$ 60.00
$100.00
$130.00
$300.00
$ 40.00
C. Temporary Services or Feeders' Installation, Alteration or Relocation
D. Branch Circuits
200 amps or less S 40.00
201 amps to 400 amps _ $ 55.00
Over 401 to 600 amps _ $ 80.00
0ver 600 amps or 1000 volts see "Brr above
Nev, Alteratlon'or Extension Per Panel
onecircuit --t S3s.oo 35
Each Addi t ional
Circui t or vi tlr Service.. /or Feeder Permit .-l S 2.00 ( f
Hiscellaneous (Service/feeder not included)
-Each installation
Pr,rmp or i rriga t ion S
Sign/OutIine Lighting_ S
Limi ted Energy/Res _ S
SI'BTOTAL OP AI}OVE
5f State Surcharge
TOTAL
40. 00
40. 00
20.00
36.00
I,I
RIiCI.]IVED IIY:
E
,--",
1
2
Permit No
lssued Date
OR OFFICE USE ONLY
STATEMENT:
!NFORMATION NOTICE TO PROPERTY OWNERS
ABOUT CONSTRUCTION RESPONSIBILITIES
Note: Oregon Law, ORS 701.055(4) , requires residential construction permit
applicants who are not registered with the Construction Contractors Board to
sign the following statement before the building permit can be issued. This state-
ment is required for residential building, electrical, mechanical, and plumbing
permits. Licensed Architect and Engineer applicants, exempt from registration
underORS 701.010(7), need not submit this statement. This statement will be
filed with the permit.
Fill in the applicable blanks, and initial boxes 1 and 2, and either box 3A or 38:
I own, reside in, or will reside in the completed structure.
I understand that I must register as a construction contractor if the structure is sold
or offered for sale before or upon completion.
Contractor reqistration number-
I will instruct my general contractor that all subcontractors who work on the struc-
ture must be registered with the Construction Contractors Board.
3.8 will be my own contractor.
lf I hire subcontractors, I will hire only subcontractors registered with the Construc-
tion Contractors Board. lf I change my mind and do hire a general contractor, I will
contract with a contractor who is registered with the Construction Contractors Board
and I will immediately notify the office issuing this building permit of the name of
the contractor.
I hereby certify that the above information is correct and that I have read and understand
the lnformation Notice to Property Owners about Gonstruction Responsibilities on the
ide this form.
'z{7
na it Applicant te
UCTION CONTRACTORS BOARD
OR
/
WHITE COPY TO ISSUING AGENCY PERMIT FILE
PINK COPY TO APPLICANT
8/91
Address:
INFORMATION NOTICE TO PROPERTY OWNERS
ABOUT CONSTRUCTION RESPONSIBILIT!ES
NOTE: This lnformation Notice to Property Owners About Construction Responsibilities
was developed by the Construction Contractors Board in accordance with ORS 701.0566),
passed by the 1989 Oregon Legislature.
'l-:
lf you are actin$ as your own contractor to construct a new home or make a substantia! impiiivement,to an
existing structure, you can prevent fany problems by being aware of the following responsibilitigs and areas
of concern
lf you hire persons not registered with the Construction Contractors Boqrd to do labor in constructilg or assisting
in the construciion or iriprovemeot.oj g residential slructure;'.yg..u.iryJJl,,in most;inStances,'tfu'fufeo to be an
"employer" and the people you hire will'be "employees". As the employer, you must comply with.the following:,.;
gregon's Withholdl As an employer, yqu must wrthhold'income taxes from employee wages at
EMPLOYER RESPONSIBILITIES:
the time employees are paid. You wilthe ljable for the tax payments even,if you donlt actually withhold the
tax from your employees. For more information, call the Oregon Department of Revenue at 378-3390.
Unemployment lnsuratce Tax: As an employer, you are required to pay a tax for unemployment insurance
purposes on the wages of allemplo!€e$- For more information, call the Oregron Employment Division DHR
at 378-3224.
,:
Workers' Compensation lnsurance: As an employer, you are subject to the Oregon \fibrkers'"Compensation
Law, and must obtain workers' compensation insurance for your employees. lf you fail to obtain workers'
compensation insurance, you,may be sublect to penalties and will be llable for all claim costs if one of your
employees is injured on the job. For more information, callthe Workers' Compensation Division DIF at 9ru74%.
U.S. lnternal Revenue Service: As a p employ.qr, you must withhold federal income tax from employees' wages.
for more information, callYou will be liable for the tax payment even if you didn't actuqlly withhold the tax
the lnternal Revenue Service at 221-3960.
OTHER RESPONSIBILITIES AND AREAS OF CONCEBN:
Construction Contractors Board
700 Summer St. NE, Suite 300
Salem, OR 97310-0151
Phone 503-378-4621
Code Compliance: As the permit holder for this proiect, you are responsible for resolving any failure to meet
code requirements that may be brought to your attention through inspections.
Liability and Property Damage lnsurance: Contact your insurance agent to see if you have adequate insurance
chasfallingtools,paintoverspray,waterdi.magefrompipepUnc.
tures, fire, or work that must be re-done.
Time to Sup ervise Employees Make sure you have sufficient time to supervise your employees.
Expertise: Make sure you have the expertise to act as your own general contractor, to coordinate the work
of rouffin and finish trades, and to notify building officials at the appropriate times so they can perform
the required inspections.
lf you have additional questions, write to:
o24N 10t24t89
/
*"OCCT'PAIICY INSPECTION APPLICATION
DATE:uevl^\ev- e q JOB NUMBER:?- /us O
ADDRESS 0F INSPECTI0N: lqU 5, tqn
OIJNER:-5.n.*l \si* \\so,t'PH0NE NUMBER: a{z *oq
0!INER' S ADDRESS: j-t r S R, j.K.q u
APPLICANT:
orr)
\ rurt So n-)
APPLICANT,S ADDRESS: 3-.? t S ( r.reR-lQo rc D 6n..1-c ^$g Q1^e1ar'.)
FOR ACCBSS TO PROPERTY - TELEPHONE NUMBER: 3q2- qI O?
PR0P0SBD USE: Cc,,". u-.'o .\Q-ao\ t=L[e o-Cc;€
A $35.00 INSPECTION FEE TS REQUIRED AT TIIE TIME OF APPLICATION
THIS APPLICATION FORM MUST BE STGNED BY THE OWNER OF THE PROPERTY TO BE
OF PRO OIINER
FOR OFPICB USE ONLY
DATE PAID:,
DATE OF INSPECTTON:
DATE OF CERTIFICATE OF COMPLIANCE:
COMMENTS:
Vo 03RECEIPT NUMBER:
DATE OF REPORT:
CITY OF SPRINGFIBLD BTIU)ING DIVISION:======:======::===:==:===:===:=======::========================-===============