HomeMy WebLinkAboutPermit Mechanical 1994-02-10RESIDENTIAL
PERMIT APPLICATION
lnspections: 726-3769
Office: 726-3759
JOB NUMBER ci +o l4q
225 Fifth Street
Springfield, Oregon 97477
frh)
LOCATION OF PROPOSED WORK:
ASSESSORS rr,rAP, I] C3AL3{TAX LOT:
I
LOT
-
BLOCK:SUBDIVISION
1qL- 1r?3PHONE:
OQ ZIP:STATE:
M^)L q)4 )-)
OWNER:
ADDRESS:
CITY:
NEW
-
REMODEL ADDITION DEMOLISH OTHER
DESCRIBE WORK:
ELECTRICAL:
iCar,.vr'r\g
EXPI RES PHONEADDRESS
to
CONTRACTOR'S NAME
MECHANICAL:
CONST.
CONTRACTOR #
GENERAL:
PLUMBING
G RANGE:
# OF BDRMS
_ OFFICE USE _
LAND USE:FLOOD PLAIN
WATER HEATER
r OF UNITS:
SECONDARY HEAT:
SQUARE FOOTAGE:
OUAD AREA:
# OF BLDGS ZONING CODE:
OCCY GROUP:
* OF STORIES:
CONSTR. TYPE:
HEAT SOURCE:
To request an inspection, you must call 726-376g. Thls ls a24hour recording. All inspections requested before 7:o0 a.m' will be
made the same working day, lnspections requested after 7:00 a.m' will be made the following work day'
REQUIRED INSPECTIONS
I TemporarY Electric Rough Mechanical - Prior to
cover.
inal Plumbing - When all
plumbing work is comPlete.
Site lnspection - To be made
after excavation, but Prior to
setting forms.
Rough Electrical - Prior to Final Electrical - When all
electrical work is comPlete.cover.
Underslab Plumbing/ Electrical /
Mechanical - Prior to cover.
Electrical Service - Must be
approved to obtain Permanent
electrical power.
Final Mechanical - When all
mechanical work is comPlete.
Footing - After trenches are
excavated.Fireplace - Prior to facing
materlals and (ramlng lnsP.
Final Building - When all
required inspections have been
approved and building is
completed.Masonry - Steel location, bond
beams, grouting.l--l Framing - Prior to cover.
Foundation - After forms are
erected but prior to concrete
placement.
y'oter
Wall/Ceiling lnsulation - Prior to
cover.
Underground Plumbing - Prior
to filling trench.[-_l Drywall - Prior to taoing.
MOBILE HOME INSPE TIONS
Underlloor Plumbing/ Mechanical
- Prior to insulation or decking.Wood Slove - After installation
Post and Beam - Prior to floor
insulation or decking.lnsert - After firePlace aPProval
and installation of unit'
Blocking and Set'UP - When all
blocking is comPlete.
Floor lnsulalion - Prior to
decki ng.Curbcut & APProach - After
forms are erected but Prior to
placement of concrete.
Plumbing Connections - When
home has been connected to
water and sewer.
Sanitary Sewer - Prior to filling
trench.Electrical Connection - When
blocking, set-uP, and Plumbing
inspections have been aPProved
and the home is connected to
the service Panel.
Storm Sewer - Prior to filling
trench.
Sidewalk & DrivewaY - After
excavation is comPlete, forms
and sub-base material in Place.
Water Line - Prior to filling
trench.
[--] Fence - When comoleted'
Final - After all required
inspections are aPProved and
porches, skirting, decks, and
venting have been installed.Rough Plumbing - Prior to
cover.
Slreet Trees - When all required
trees are Planted'
E
E
E
E
E
E
E
r
r
Err
E
E
E
r
E
E
--rLot faces
Lot sq. ftg.
Lot coverage
Topography
Total height
Lot Type
-
lnterior
-
Corner
-
Panhandle
-
Cul-de-sac
ks
P.L.HSE GAR Acc
N
S
E
_. THE PROPOSED WORK
'N
THE
HISTORICAL DISTRICT, OB ON
THE HISTORICAL REGISTER?
-
lf yes, this application must be signed
and approved by the Historical
Coordinator prior to permit issuance.
APPROVED:
VALU E
(A)
X $/SQ. FT.
Carport
Mai n
Garage
Total Value
Building Permit Fee
State Surcharge
Total Fee
BUILDING PERMIT
ITEM SQ. FT,
BUILDING VALUE, PLAN CHECK
AND BUILDING PERMIT
This permit is granted on the express condition that the said
construction shall, in all respects, conform to the Ordinance
adopted by the City of Spri ngfield, including the
Development Code, regulating the construction and use of
buildings, and may be suspended or revoked at any time
upon violation of any provisions of said ordinances.
Receipt Number:-
Plans Reviewed By Date
Date Paid
Received By:
Plan Check Fee:
SYSTEMS DEVELOPMENT CHARGE (SDC)
(B)
Systems Development Charge is due on all undeveloped
properties withln the City limits which are being improved.
ITEM
Fixtures
Residential Bath(s)
Sanitary Sewer
Water
Storm Sewer
Mobile Home
FEE
(c)
l5 oo
ts 7<i
N0
FT.
FT.
FT.
PLUMBING PERM!T
.f<
Plumbing Permit
State Surcharge
Total Charge
ADDITIONAL COMMENTS
MECHANICAL PERMIT
Fu rnace
Exhaust Hood
Vent Fan No
Wood Stove/ lnsert/ Fireplace Unit
Dryer Vent
(D)
Mechanical Permit
lssuance
State Surcharge
Total Permit
By signature, I state and agree, that I have caref ully examined
the completed application and do hereby certify that all
information hereon is true and correct, and I f urther certify
that any and all work performed shall be done in accordance
with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described
herein, and that NO OCCUPANCy will be made of any
structure without permission of the Building Safety Division.
I further certify that only contractors and employees who
are in compliance with ORS 7O1.OS5 will be used on this
project.
'mit card is located at the f ront
n
sig
I further agree to ensure that all inspections are
requested at the proper ti each address is readable
from the street, that the
of the property, and
on the si s durin
Date
app
MISCELLANEOUS PERMITS
Mobile Home
State lssuance
State Surcharge
Sidewalk
-
ft
Curbcut
--
ft
Demolition
State Surcharge
Total Miscellaneous permits (E)
TOTAL AMOUNT DUE (exctuding electricat)
(A, B, C, D, and E Combined)
tq -l<
r l,nlq q
C^)
.s
DATE PAID
AMOUNT RECEIVED
RECEIVED BY
VALIDATION:
RECEIPT NUMBER
-\Nvel^ ,--tlt-rzt-,)t- J-,', ln, -
-7<
R
Permit No:qqol L4q
Address: )-l< lt t: uD SL
e8 4,"1"rlssuedDate:
OR OFFICE USE ONLY
STATEMENT:
!NFORMATION NOTICE TO PROPERTY OWNERS
ABOUT CONSTRUCTION RESPONSIBILITIES
Note: Oregon Law, ORS 701.055(4) , requires residential construction permit
applicants who are not registered with the Construction Contractors Board to
sign the following statement before the building permit can be issued. This state-
ment is required for residential building, electrical, mechanical, and plumbing
permits. Licensed Architect and Engineer applicants, exempt from registration
under ORS 701.010(7), need not submit this statement. This statement will be
filed with the permit.
Fill in the applicable blanks, and initial boxes 1 and 2, and either box 3A or 38:
d I own, reside in, or will reside in the completed structure.
I understand that I must register as a construction contractor if the structure is sold
or offered for sale before or upon completion.
1
2
3
f\ruc k\/
My gerroal contractor isA
Contractor registration num 11b2t
I will instruct my general contractor that all subcontractors who work on the struc-
ture must be registered with the Construction Contractors Board.
OR
3. B. r+,r wiu be
'.nr "*"B),}|mH i{;$
lf I hire subcontractors, I will hire only subcontractors registered with the Construc-
tion Contractors Board. lf I change my mind and do hire a general contractor, I will
contract with a contractor who is registered with the Construction Contractors Board
and I will immediately notify the office issuing this building permit of the name of
the contractor.
I hereby certi the above i ation is correct and that I have read and understand
the lnform Noti Owners about Construction Responsibilities on the
of this
) -r o-qq
re cant Date
CONSTRUCTION CONTRACTORS BOARD
0244J 8191
t
WHITE C,oPY TO ISSUING AGENCY PERMIT FILE
PINK COPY TO APPLICANT
---
INFoREATToN NoncE To pRopERTy diwruens
ABOUT CONSTRUCTION RESPONSIBILITIES
NOTE: This lnformation Nolice to Property Owners About Construction Responsibilities
was developed by the Construction Gontractors Board in accordance with ORS rc1
passed by the 1989 Oregon Legislature.
.055(5),
lf you are acting as your own contractor to conStruct a new home or make a substantial impqov6ment to an
existing structure, you can prevent many problems by being aware of the following responsibilities and areas
of concern.
EMPLOYER RESPONSIBILITIES: j'
lf you hire persons not registered with the Construction Contractors Bgard to do labor in construc.ling or assisting
in the construction or improvement of a residential structurq; yglu will, in most instances, b9,:ruled to be an
"employer" and the people you hire will be "employeeQ'1. As the dmployer, you must comply with the following:
Oregon's Withlloiding'T,?il Law: As an employer, you must withhold income.taxes from employee wages at
the time employees are-paid..You will,b-e liable for the tal payments even if youdon't actuglly withhold the
tax from your employees. For more information, call the Oregon Department of Revenue..at 378-3390.
Unemployment lnsurance Tax: As an employer, you are required to pay a tax for unemployment insurance
purposes on the wages of all ernplo)€es, For more information, callthe Oregon Employment Division DHR
at 378-3224.
Workers' Compensation lnsurance: As an employer, yoLr are-suhlect to the Oregon Workers' Compensation
Law, and must obtain workers' compensation insurance for your employees. lf, you fail to obtain workers'
compensation insurancq you rnay be subject to penaltiesand wtll be'liable'fof al[ claim costs if one of your
employees is injured on the job. For more information, call the Workers' Compensation Division DIF at gf3-7434.
U.S. lnternal Revenue Service: As an employer, you must withhold federal income,tax from ernployees'wages.
ymente,enifyoudidn,t.actudl]ywitnnoto.tnd'tax.Formoreinfoimation,call
the lnternal Revenue Service at 221-3960.
OTHER RESPONSIBILITIES AND AREAS OF CONCERN:
Code Compliance: As the permit:holder for this prolect,you are responsible for resolving any failure to meet
code requirements that may be brought to your attention through inspections.
Liabilily and Property Udlr.laEe lnstirance:lGontact y6$r iriSurance agsrt to See if you have adequate insurance
chasfallingtools,paintoversprdi,,saterdamagefrompipepunc-
tures, fire, or work that must be re-done.
Time,to Supervise,Employe6s: Make sure you have sufficient tirne to su pervise your empfoyees.
Expertise: lvlake sure you have the expertise to act as your own general contractor, to coordinate the work
of rough-in and finish trades, and to notify building officials at the appropriate times so they can perform
the required inspections.
lf you have additional questions, write to:Construction Contractors Board
700 Summer St. NE, Suite 300
Salem, OR 97310-0151
Phone 503-378-4621
o244J 10t24t89
RINGFIELE,
RESIDENTIAL
PERMIT APPLICATION
lnspections: 726-3769
Office: 726-3759
JOB NUMBER
225 Fifth Street
Spri ngf ield, Oregon 97 477
R ryLOCATION OF PROPOSED WORK:
ASSESSORS MAP -z TAX LOT:
LOT:BLOCK:SUBDIVISION
PHON E:
ZIP:STATE:CITY:
ADDRESS:
OWNER
NEW
-
REMODEL ADDITION DEMOLISH OTHER
DESCRIBE WORK
ADDRESS EXPIRES PHONECONTRACTOR'S NAME
MECHANICAL:
ELECTRICAL:
CONST.
CONTRACTOR #
GEN ERAL:
PLUMBING
R,ANGE:
# OF BDRMS
_ OFFICE USE _
LAND USE:
ZONING CODE:
FLOOD PLAIN
WATER HEATER
* OF UNITS:
SECONDABY HEAT:
SQUARE FOOTAGE:
OUAD AREA:
# OF BLDGS
OCCY GROUP:
# OF STORIES
CONSTR. TYPE:
HEAT SOURCE:
To request an inspection, you must call 726-3769. This is a24 hour recording. All inspections requested before 7:00 a.m. will be
made the same working day, inspections requested after 7:00 a.m. will be made the following work day.
REQUIRED INSPECTIONS
Temporary Electric Rough Mechanical - Prior to
cover.
Final Plumbing - When all
plumbing work is complete.
Site lnspeclion - To be made
after excavation, but prior to
setting forms,
Rough Electrical - Prior to Final Electrical - When all
electrical work is complete.cover.
Underslab Plumbing/ Electrical/
Mechanical - Prior to cover.
Electrical Service - Must be
approved to obtain permanent
electrical power.
W Final Mechanical - When all
mechanical work is complete.
Footing - After trenches are
excavated.Fireplace - Prior to facing
materials and framing lnsp.
Final Building - When all
required inspections have been
approved and building is
completed.Masonry - Steel location, bond
beams, grouting.Framing - Prior to cover
OtherFoundation - After forms are
erected but prior to concrete
placement.Wall/Ceiling lnsulation - Prior to
cover.
Underground Plumbing - Prior
to filling trench.
MOBILE HOME INSPECTIONS
Underlloor Plumbing/ Mechanical
- Prior to insulation or decking.Wood Stove - After installation
Post and Beam - Prior to floor
insulation or decking.lnsert - After fireplace approval
and lnstallation of unit.
Blocking and Set.Up - When all
blocking is complete.
Floor lnsulation - Prior to
decki ng.Curbcut &Approach - After
forms are erected but prior to
placement of concrete.
Plumbing Connections - When
home has been connected to
water and sewer.
Sanitary Sewer - Prior to filling
trench.Electrical Connection - When
blocking, set-up, and plumbing
inspections have been approved
and the home is connected to
the service panel.
Storm Sewer - Prior to filling
trench.
Sidewalk & Driveway - After
excavation is complete, forms
and sub-base material in place.
Water Line - Prior to filling
trench.
Fence - When completed
Streel Trees - When all required
trees are planted.
Final - After all required
inspections are approved and
porches, skirting, decks, and
venting have been installed.Rough Plumbing - Prior to
cover.
?/o ,, i
Dl9zza
.q+42727
E
tl
tl
fl
l--l Drywall - Prior to taping.
E
E
tl
tl
E
E
E
Lot faces
Lot sq. ftg.
Lot coverage
Topography
Total height
Lot Type
-
lnterior
-
Corner
-
Panhandle
-
Cul-de-sac
backs .- THE PROPOSED WORK IN THE
HISTORICAL DISTRICT, OR ON
THE HISTORICAL REGISTER? _--
lf yes, this application must be signed
and approved by the Historical
Coordinator prior to permit issuance.
APPROVED:
P.L.HSE GAR ACC
N
S
E
BUILDING VALUE, PLAN CHECK
AND BUILDING PERMIT
This permit is granted on the express condition that the said
construction shall, in all respects, conform to the Ordjnance
adopted by the City of Springfield, including the
Development Code, regulating the construction and use of
buildings, and may be suspended or revoked at any time
upon violation of any provisions of said ordinances.
Receipt Number:-
Plans Reviewed By Date
Plan Check Fee:
Date Paid
Received By:
VALUE
(A)
X $/SQ. FT.
Total Value
Building Permit Fee
State Surcharge
Total Fee
BUILDING PERMIT
ITEM SQ. FT.
Main
Garage
Carport
Systems Development Charge is due on al I undeveloped
properties within the City limits which are being improved.
SYSTEMS DEVELOPMENT CHARGE (SDC)
(B)
ADDITIONAL COMMENTS
ITEM
Fixtures
Residential Bath(s)
Sanitary Sewer
Water
Storm Sewer
Mobile Home
FEE
(c)
N0
FT.
FT.
FT.
PLUMBING PERMIT
Plumbing Permit
State Surcharge
Total Charge
Wood Stove/ lnsert/ Fi replace Unit
Dryer Vent
,/5- -"
<f;-.{(D)
N0
/hra'-2
Vent Fan
Mechanical Permit
lssuance
State Surcharge
Total Permit
M ECHANICAL PERMIT
Fu rnace
Exhaust Hood By signature, I state and agree, that I have caref ully examined
the completed application and do hereby certify that all
information hereon is true and correct, and I f urther certify
that any and all work performed shall be done in accordance
with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described
herein, and that NO OCCUPANCY will be made of any
structure without permission of the Building Safety Division.
I f.urther certify that only contractors and employees who
are in compliance with ORS 701.055 will be used on this
proiect.
I f urther agree to ensure that all required inspections are
e,t
e-
Sig natu re
Date
each address is readablerequested at the pro
from the street, th permit card is
the appof the pro
on the
at the front
will remain
times du
MISCELLANEOUS PERMITS
Mobile Home
State lssuance
State Surcharge
Sidewalk
-
ft
Curbcut
--
ft
Demolition
State Surcharge
Total Miscellaneous Permits (E)
TOTAL AMOUNT DUE (excluding electrical)
(A, B, C, D, and E Combined)
DATE PAID z-,//-?.-/
AMOUNT RECEIVED
FIECEIVED BY
VALIDATION:
FIECEIPT NUMBER
.-c
//8.<<