Loading...
HomeMy WebLinkAboutPermit Plumbing 1995-01-23SPRINGFIELD RESIDENTIAL PERMIT APPLICATION lnspections: 726-3769 Office: 726-3759 LOCATION OF PROPOSED WORK: ASSESSOBS MAP: LOT: 2fr, 74 JOB NUMBER 225 Fifth Street Spring(leld, Oregon 97 477 TAX tOT:8lrao BLOCK:SUBDIVISION PHON E: STATE ZIP: OWNER: ADDRESS: CITY: NEW - REMODEL ADDITION DEMOLISH OTHEFI DESCRIBE WORK: ADDRESS EXPIRES PHONE ELECTRICAL: CONTRACTOFI'S NAME MECHANICAL: CONST. CONTRACTOR 'f GENERAL: PLUMBING RANGE: I OF BDBMS: - OFFICE USE - LAND USE: WATER HEATER: ZONING CODE: QUAD AREA: * OF BLDGS: SECONDARY HEAT SOUARE FOOTAGE: OCCY GROUP: * OF STORIES: CONSTR. TYPE: HEAT SOURCE: # OF UNITS: -- To request an inspectlon, you must call 726'3769. Thls ls a24nour recordlng. All lnspections requested before 7:00 a.m. wlll bemade the same worklng day, lnspections requested after 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS l--l temporary Electric Rough Mechanical - Prlor to cover. Final Plumbing - When allplumbing work is complete. Slte Inspectlon - To be made after excavatlon, but prlor to settlng forms. Rough Electrical - Prior to Final Electrical - When all electrical work is complete.cover Underslab Plumbing/ Electrical / Mechanlcal - Prlor to cover.Electrlcal Servlce - Must be approved to obtain permanent electrlcal power. Final Mechanical - When all mechanical work ls complete. Footlng - After trenches are excavated.Flreplace - Prlor to facing materlals and framing lnsp. Flnal Building - When ail required lnspectlons have been approved and building is completed.Masonry - Steel locatlon, bond beams, groutlng.Framing - Prior to cover. Foundatlon - After forms are erected but prlor to concrete placement. Other Wall/Celling lnsulation - prlor to cover. Underground Plumbi ng - Prior Drywall - Prlor to taplngto lllllng trench. tl Underlloor Plumbing/ Mechanlcal - Prior to lnsulatlon or decking. MOBILE HOME TNSPECTIONS Wood Stovo - After lnstallatlon. Post and Beam - prior to floorlnsulatlon or decking.I--l lnsert - After flreptace approval.- and lnstallatlon of unlt. [--l Blocking and Set.Up - When ail - blocking is complete. Floor lnsulatlon - Prlor to decklng.Curbcut & Approach - After forms are erected but prlor toplacemcnt of concrete. Plumbing Connectlons - Whenhome has been connected towater and sewer.Sanltary Sewer - Prior to filling trench, Storm Sewer - Prlor to filling trench. Sidewalk & Driveway - After excavation is complete, forms and sub-base material in place. Electrical Connection - Whenblocking, set-up, and plumbing lnspections have been approvedand the home is connected tothe service panel. Water LIne - Prlor to filling trench. Fence - When completed Final - After all required inspections are approved andporches, skirtlng, decks, andventing have been instailed. w Rough Plumbing - Prior to cover.Tl Street Trees - When ail requtred.- trees are planted. -4 FLOOD PLAIN: E Lot faces Lot sq. ftg. Lot coverage Topography Total height Lot Ty[_ - lnterior - Corner - Panhandle - Cul-de-sac Se IS THE PROPOSED WOBK IN THE . HISTORICAL DISTRIST, OR ON THE HISTORICAL REGISTER? --- lf yes, this application must be slgnedand approved by the Historlcal Coordinator prlor to permit issuance. APPROVED: PL.HSE GAR ACC N S E VALUE (A) X $/SO. FI. Total Value Building Permit Fee State Surcharge Total Fee BUILDING PERMIT ITEM SO. FT. Main Garage Carport BUILDING VALUE, PLAN CHECKAND BUILDING PERMIT This permit is granted on the express condition that the saidconstruction shall, in all respects, conform to the Ordinanceadopted by the City of Springfield, includlng theDevelopment Code, regulating the construction and use ofbuildings, and may be suspended or revoked at any tlmeupon violation of any provisions of said ordinances. Plan Check Fee: ---- Recei pt Number:--_,_ Plans Fleviewed By Date Date Paid Received By: SYSTEMS DEVELOPMENT CHARGE (SDC) (B) Systems Development Charge is due on all undeveloped properties within tlre City limits which are being improved. ITEM Flx tu res Residential Bath(s) Sanitary Sewer Water Storm Sewer Moblle Home Fr. 4a FEE N0 FT. FT. (c) .t z.t^ Z>?zu.f 2 ____r__T_-_c, 7 7 /,2o Plumblng Permit State Surcharge Total Charge ADDITIONAL COMMENTS Wood Stove/ lnsert/ Flreplace Unit Dryer Vent MECHANICAL PERMIT (D) No Mechanical Permit lssuance State Surcharge Total Permit Furnace Exhaust Hood Vent Fan By slgnature, I state and agree, that I have carefully examlned the completed application and do hereby cerilfy that all lnformatlon hereon is true and correct, and I further cerilfy that any and all work performed shall be done in accordance wlth the Ordinances of the City of Sprlngfleld, and the Laws of the State of Oregon pertainlng to the work descrlbed herein, and that NO OCCUPANCy will be made of any structure wlthout perrnission of the Building Safety Divislon. I further certify that only contractors and employees who are ln compliance with ORS 701.O55 wlll be used on lhis proiect. I further agree to ensure that all required inspections are requested at the proper time, that each address ls readable from the street, that the permlt card ls located at the front of the property, and the approved set of plans will remaln :z:;,/*13' on the site at all ti es during construction Signatu Date MISCELLANEOUS PERMITS Mobile Home State lssuance State Surcharge Sidewalk - ft Curbcut - ft Demolition State Surcharge Total Miscellaneous Permits (E) TOTAL AMOUNT DUE (exctuding electricat) (A, B, C, D, and'E Combined) VALIDATION: RECEIPT NUMBER /Za DATE PAID AMOUNT RECEIVED RECEIVED BY ^?>- -? z- PLUMBING PERMIT