HomeMy WebLinkAboutPermit Mechanical 1992-09-28(
COM M ERCIAL/I N DUSTRI,..
PERM!T APPLICATION
225 Fitlh Street, Springfield, Oregon 97477
TAX LOI
SPEINGFIELO
a
JOB NUMBER
LOCATION OF PROPOSED WORK:
ASSESSOHS MAP:
INSPECTION LINE: 726-3769
OFFICE: 726-3759
tr ztP: 727--E:
2OWNER:
ADDRESS:
CITY:
NEW
-
REMODEL ADDITION DEMOLISH OTHER VALUE
DESCRIPTION OF WORK:
ARCHITECT
G EN ERAL:
ELECTRICAL:
NAME ADDRESS PHON E
ADDRESS EXPIRES PHONECONTRACTOR'S NAME
PLUMBING:
MECHANI
CONST,
CONTRACTOR #
PLUMBING
NO.FEE CHARGE
Relocated Bld
(new fix. addtl s
)
Water Service
ft.
Sanitary Sewer
ft.
Storm Sewer
ft
Backflow Device
TOTAL PERMIT
MECHANICAL
NN FEF CHA RGF
Furnace/burner & vent
< 100,000 BTUs
Furnacelburner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
?Appliance Vent
separate 7 /2-*
Stationary evap.
cooler
Vent Fan/Single
duct
Vent
f rom
System apart
AC or htg.
Mechanical exhaust
hood and duct
q 6ao Afrq€,t>Z.5
Permit lssuance $10.00
TOTAL PERMIT rfllr z-*-
_ OFFICE USE _
LAND USE:
ZONING
HANDICAP ACCESS:
LIGHTING POWER BUDGET:
WATER HEATER:
OCCY GROUP:
* OF STORIES:
QUAD AREA:
* OF BLDGS:
CONSTR. TYPE:
HEAT SOURCE:
SQ. FT.$/SQ. FT,VALUE
TOTAL VALUE OF PROJ
X
X
X
SQ. FTG MAIN
SQ. FTG ACCESS
SQ. FTG OTHER
RCPT#PLAN CHECK FE^E DATE BY
Zf,2{
BUILDING PERMIT PLUMBING DEMOLITION
5% State
Surcharqe
5% State
Su rc harqe
MECHANICAL./?>.r#r %z FENCE
VALUE $
5% Stat6
Surcharoe -2s SIDEWALK
FT.
SUBTOTAL
PE RM ITS
PAVING CURBCUT
FT,
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
Single Fixture
* OF UNITS:
FLOOD PLAIN:
-REQUIRED INSPECTIONS V
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
226-g769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work daY.
S|TE TNSPECTTON: To be ROUGH PLUMBING, PAVING: After gravel is in
made after excavation, but ELECTRICAL & place but prior to placing
prior to setup of forms. MECHANICAL: No work is to asphalt or concrete.
be covered until these
UNDERSLAB pLUMBING, inspections have been made SPECIAL INSPECTIONS: In accordance
ELECTRICAL & and approved. section 306 0f the state specialty code
MECHANICAL: To be made a special inspector shall be employed
before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor duri ng
CURTAIN WALLS construction of the following work. A
FOOTINGS & FOUNDATIONS: E'bEb, A^E. r copy of the special testing reports shall
To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division.
excavated and forms are facing materials and before
erected, ail steel in place, but framing inspection' srRUcruRAL CoNCRETE: ln
prior to placing concrete. FRAMING: To be made after excess of 2500 PS.l. (306 a'1)
coNcRErE SLAB: ro be t!:JffiliilJ'f;i]'Jlfli,',Ii ,n srRUcruRAL wELDS:
made after all inslab building place aid all pipes,-chimneys Performed on the iob. (2722f)
service equipment, conduit, and vents are complete and
:#fr3;""",",:;fl:"; ?i:l:'::J :i: 'fl::li,lt"iru,1'JJ;[3::: El?:f],?E]noT,l".?,o,.'Igt"oin place but before any tightening operations. (306
concrete is placed. INSULATION & VApOR a.6)
BARRIER: To be made after all
UNDERGROUND: Plumbing, insulation and required vapor SPRAYED ONelectrical, gas, sanitary sewer, barriers are in place but FIREPROOFING: U.BC.
storm sewer, water and before any lath or gypsum Standards 43-8.
drainage lines. To be made board interior wall covering is
prior to covering or filling applied. SpEC;AL GRAD;NG,trenches.
,NDERFL..R: prumbins I;x:.fl".="fX*'J3X:Ht"' il;iJTiiil#lP,[Jb'i],"1
electrical, mechanical. To be according to plans. Chapter 29)
made prior to installation of
floor insulation, decking or LATH AND/oR GYPSUM GLU'LAM BEAMS: lnspection
f loor sheathing. BOARD: To be made after all Certificate by an approved
lathing and gypsum board, agency' furnished to the City's
posr & BEAM: To be made interior and exierior, is in Building Division before
priortoinstallationoffloorplacebutbeforeanybeamsareplaced.(2501U.Bc.
insulation, decking or floor plastering is applied or before STDS' 25'10J1)'
sheathing. gypsum board joints and
fasteners are taped and STRUCTURAL MASONRY: (306
FLooR TNSULATToN & finished' a'7)
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
ROOF SHEATHING AND
NAILlNG: Prior to installing
any roof covering.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
"ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
ADDITIONAL COMMENTS
PLANS REVIEWED BY DATE
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction
f zrq>Signature Date
VALIDATION DATE PAID
RECEIVED BY:
AMouNTRECETVED: <{25-
RECEIPT #6 2*.